05000254/LER-1980-012-03, /03L-0:on 800429,reactor Recirculation Motor Generator Set 1A Tripped Due to Low Oil Pressure from Lube Oil Pump 1A1 Trip.Possibly Caused by Contractor Personnel Dropping Matl on Generator Set Control Cabinet

From kanterella
(Redirected from ML19310A371)
Jump to navigation Jump to search
/03L-0:on 800429,reactor Recirculation Motor Generator Set 1A Tripped Due to Low Oil Pressure from Lube Oil Pump 1A1 Trip.Possibly Caused by Contractor Personnel Dropping Matl on Generator Set Control Cabinet
ML19310A371
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 05/23/1980
From: Swales J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19310A366 List:
References
LER-80-012-03L-03, LER-80-12-3L-3, NUDOCS 8006110151
Download: ML19310A371 (2)


LER-1980-012, /03L-0:on 800429,reactor Recirculation Motor Generator Set 1A Tripped Due to Low Oil Pressure from Lube Oil Pump 1A1 Trip.Possibly Caused by Contractor Personnel Dropping Matl on Generator Set Control Cabinet
Event date:
Report date:
2541980012R03 - NRC Website

text

._

NRC FCCM 364 U.S. NUCLEAR RECULATCRY COMMISSION (7~771 LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

@ l l l L l Q l A l 0 l 1 l@l 0 l 0 l 0 l -l0 l0 l0 l -l 0 l 0 l 0 l@l 4 l 1 l 1 l 1 l 1 l@l l

l@

7 8 9 LICENSEE CODE

4 15 LaCENSE r.aWMSER 25 28 LICENSE TYPE JG 57 CAT 58 CON'T

_ I'OTII ' 3Z l L }@l 015 l o l o l o 121514 l@l 014; 219l 8l O l@l o l <;l 21 a l 810 l@

4 7

8 80 61 COCKET NUM8 ER 68 69 EVENT OATE 14 75 REPORT DA TE 80 EVENT DESCRIPTION AND PROSABLE CONSEQUENCES h gl During steady state power operation, at 3:46 p.m., the 1A Reactor Recirculation l

gl Motor Generator (MG) Set tripped. The IB recirculstion pump MG set was immediately l

i n i,i l run back to minimum speed and the 1A recirculation pump was restarted at 4:15 p.m.

g l77--] [ which was within the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 1Imit as required by Technical Specification 3.6.H.3 g

IT Tiil l Thus, the consequences of this occurrence were minimal.

g 10171 1 I

10181 1 I

$$0E SU$Ci$E COMPONENT CODE

$ dc O'E SU E

COOE 1019l l Cl Bl@ W@ lX l@ l P l Vl M l P l X l X l@ l Bl@ l Zl@

7 8

9 10 11 12 13 18 9

20 SEOVENTIAL OCCURRENCE REPORT REVISION l

(g af go EVENT YE AR REPORT NO.

COOE TYPE NO.

@, Reg l218 l0 l l_l l0 l1l 2l jfl l0 l3 l W

[]

y i

22 23 24 26 27 28 23 30 31 32 TKN AC 0 P NT MET HOURS S8 IT PC 8.

SUPPLI MANL ACTURER lXl@lZl@

lBl@

lZ l@

l0l0l0l1l l Y l@

l N]@

lNl@

l G l 0 l 8 l0 l@

J3 34 35 36 31 40 44 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h l i 10 ] l The IAl MG set lube oil pump tripped causino the 1A recirculation MG set to trio.

I L'._L.i_J l The cause of the lube oil pump trip is unknowr.

All carameters on the nnmn wara I

gl normal and the oil pump was started three times with no problem.

l tilail l

u L4_] I I

7 8 9 83 SA

% POWER OTHER STATUS Of O R CISCOVERY OESCRIPTION li 15 l (E,_J@ l 0 l 8 l 7 l@l NA l

lAl@l Operatlonal Event l

AC'TIVITY CO TENT

@ ELEASE@O OF RELEASE [,.Lj@l R

AMOUNT OF ACTIVITY LOCATION OF RELEASE [1]

NA l

l NA l

7 8 9 to 11 44 45 80

  • ERSONNEL EXPOSURES NUMBER TYPE

DESCRIPTION

ltTill0l0l0l@lZl@l NA l

PERSONNEL INJUR ES DESCRIPTION @

NuMSER Li_.LJ lo lo I 01@l NA l

7 8 9 11 12 80 LOSS OF OR O AVAGE TO FACILITY Q TYPE

DESCRIPTION

%,,,/

y@l NA l

1 9 7

8 9 10 80 8 LNiSSUE @ DESCRIPTION i

7 8 9 _

l NA l

lllllllllllllj to 68 69 60 *.

PAE 0,

J. Swales 309-654-2241. ext. 173 E

PHONE:

NA E l

5UU61101T1

I.

LER NUMBER: LER/R0 80-12/03L-0 11.

LICENSEE NAME: Commonwealth Edison Company, Quad-Cities Nuclear Power Station Ill.

FACILITY NAME: Unit One IV.

DOCKET NUMBER: 050-254 V.

EVENT DESCRIPTION

On April 29, 1980, at 3:46 p.m.,

during steady state power operation, the 1 A Reactor Recirculation Motor Generator (MG) Set tripped. The IB Re-circulation Pump was immediately run back to minimum speed and the Unit One Main Generator output drooped from 705 MWe to 360 MWe. The 1A Re-circulation MG Set trip was caused by low oli pressure when the lAl lube oil pump auto-tripped. The emergency D.C. Lube Oil Pump auto-started.

The IA2 Lube Oil Pump was started and the 1A Recirculation MG Set was restarted at 4:15 p.m.

This was within the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> time limit required by Technical Specification 3.6.H.3 VI.

PROBABLE CONSEQUENCES OF THE OCCURRENCE:

The IB Recirculation Pump was immediately run back to minimum speed and the 1A Recirculation Pump was restarted within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> as required.

Vll.

CAUSE

The lAl Lube Oil Pump tripped causing the Recirculation MG Set to trip.

The cause of the Lube Oil Pump trip is unknown. Work Request Number Q04983 was written to investigate the cause. All parameters on the pump were normal and the oil pump was started three times with no problem.

The only other possible causc could have been a spurious oil pump trip caused by contractor personnel. At the time of this occurrence, con-tractor personnel were working on a modification near the 1A Recirculation MG Set control cabinet, it is possible that some piece of material may have dropped on the control cabinet causing the 1A1 oli pump to trip.

Vlli.

CORRECTIVE ACTION

The f r ediate corrective action was to restart the 1A Recirculation MG Set. a write Work Request Q04983 to investigate the trip of the lAl Oil Pump.