ML19309F613

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-302/79-24 on 790702-0803 & Notice of Violation
ML19309F613
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/24/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19309F605 List:
References
NUDOCS 8004300171
Download: ML19309F613 (2)


See also: IR 05000302/1979024

Text

8004800

h[

' .'

-

pa urg*o

UNITED STATES

4,

8

NUCLEAR REGULATORY COMMISSION

o

e

g

r

REGION 11

'#

o

101 MARIETTA ST

N.W., SulTE 3100

k

ATLANTA, GEORGIA 30MXI

g.....

In Reply Refer To:

RII:DRQ

SEP 2 4 syg

50-302/79-24

.

Florida Power Corporation

Atta:

W. P. Stewart, Manager

Nuclear Operations

Post Office Box 14042, Mail Stop C-4

St. Petersburg, Florida 33733

Gentlemen:

This refers to the inspection conducted by D. Quick and others of this

office on July 2 through August 3, 1979 of activities authorized by NRC

License No. DPR-72 for the Crystal River facility, and to the discussion

3

of our findings held with G. P. Beatty, Jr. at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

We have examined actions you have taken with regard to previously

identified inspection findings. These are discussed in the enclosed inspection

report.

One new unresolved item resulted from this inspection and is discussed

in the enclosed report. This item will be examined during subsequent

inspections.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. These

items and references to pertinent requirements are listed in the Notice

of Violation enclosed herewith as Appendix A.

This notice is sent to

you pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice", Part 2, Title 10, Code of Federal Regulations. Section 2.201

requires you to submit to this office, within 20' days of your receipt of

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you, and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

,

and (3) the date when full compliance will be achieved.

l

_

-

l

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

l

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

I

l

1

l

!

-

.

.

.

Florida Power Corporation

-2-

2 4 gg

,

the enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure. Any such application must include a full statement

of the reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

[C.

)

R. C.

ewis, Acting Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-302/79-24

cc w/ enclosures:

G. P. Beatty, Jr.

Nuclear Plant Superintendent

Post Office Box 1240

Crystal River, Florida 32629

.'