05000289/LER-1980-001-01, /01T-0:on 800123,during Load Study,Determined That Potential Overload Condition Could Exist on 1P 480-volt Bus W/Failure of Is 480-volt Bus.Caused by Inadequate Design

From kanterella
(Redirected from ML19290C992)
Jump to navigation Jump to search
/01T-0:on 800123,during Load Study,Determined That Potential Overload Condition Could Exist on 1P 480-volt Bus W/Failure of Is 480-volt Bus.Caused by Inadequate Design
ML19290C992
Person / Time
Site: Crane 
Issue date: 02/06/1980
From: Mitchell D
METROPOLITAN EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19290C984 List:
References
LER-80-001-01T, LER-80-1-1T, NUDOCS 8002150302
Download: ML19290C992 (2)


LER-1980-001, /01T-0:on 800123,during Load Study,Determined That Potential Overload Condition Could Exist on 1P 480-volt Bus W/Failure of Is 480-volt Bus.Caused by Inadequate Design
Event date:
Report date:
2891980001R01 - NRC Website

text

._..

T U.S. NucLEAA REcutAtoRY CoadhalSSloN 16fte PoRM 364 0-Hf LICENSEE EVENT REPORT coNTRot Stocc 1 - I l

i l

I l@

(PtEAss PRINT OR TYPE ALL REQUIREo INPCM8AATIONI i

% lPl Al Tl M Il l 0 l0 l l 0l Ol Ol Ol Ol-l0 10l @l 4I ill lil1l@lsi ar se @

l l

t e o vCaNss: CCos is s

vCamsamvussa as ze vCamsa rves ao ccN'T g lL @l015 lQ l Q l 0 l 218 l 9.@la l1 l 2 l3 l 81 Q)@l 01 21016 i 8 I O l@

o i

i 8

80 el OOCKET NuwegR es ce tv847 3ATR 74 IS ASPORT QATE 80 EVENT DESCRIPT1ON AND PRC8ASLE CCNSECUENCES O'o o 2 l As the result of a load study performed on the ES buses, it has been determined (3TTl I that.a potential overload condition could exist on the IP 480V hus during the I

o 4

I following conditions (1) Failure of the IS 480V bus, (2) ESAS Actuation and I

o!s I (3) Offsit' cover is available. Using conservative loadine assumptions the I

o 6

1

-,1c.0,iad current to the IP 480V bus exceeds the lone deliv afetnm get*4 w of f

o,i 1 1600 amps. The consequences of this event would he loss of closed cooling syste=sI r

  • E's" "fCis' s s$$s CoMPCNENT CCCE SLB CE Su OE o 4 si l E l D l@ l B @ l A l@ l ClK IT lB IR I K l@ l A l@ lZ l@

r s

7 to 11 12 12 18 19 20 SEcutNTIAL CCCUR R ENCE mePCRT REVISION Lg nino (vtNTytAR atPCMT NO.

CCCE TYPE NO.

@,7=;

I a l ol 1-1 10 I o l il L(_1 10111 IT I L-J L9_I

_2, n

u 2.

2.

v a

u 2.

n*

^EF"W.c'i=..

'"s!"4Pir

.A E"IfM".'..

l0101O@I01 EM TC%s!

e!!O!T 5"M.as" ou..

W@

lNl@

IA l@

W l 1 12 10 l@

I X l@l X I@

l Zl@

IIl@

u 2

23 2.

2i

.o

.i 2

.2 CAUSE DESCRIPT1oN AND CCARECTIVE ACTtoNS jThe cause for the potential occurence annears to be inadeouate desien for the 1

i,o gcondition indicated. The corrective action will he to verify tha validity of the t Tf the inadeouate desien I g i assumptions used in the study and the results obtained.

lis verified, modifications will be made to assure that tha IP 480V bus will sunolvI

,,3 Ithe required ESAS loads with or withcet failure of the IS hus.

No (continuedi I

i i.

so e s ST T

% Powtm OTWER STATUS Das Env 315CCVERY DESCRIPTICN

<-+4,e-a

" '<- - aa i

l X l@ l 0 l 010 l@l NRC Order i

LaJ@l studv iis vifv CCN TE NT egegAsso op agtgAsg AMOUNT CP ACTIVITY LOCATION Cr aELtASE I

6 N/A l

l WA f

a a 9 to si 4

3Q PtaSONNtt tx*C$L ats

%vusan Tvre g e 5CmirTICN l 0 l 0 l O l@f Zl@l N/A l

i 7

',.so~N. t'mu'm',is2.,C... men @

,y i 141 0 l 01 Ol@l N/A l

r i:

LCS$ 08 cm CAuAGE 'O FACstify R002150 3 C =&

iveg O E 5C 288T10m IZl@l N/A 3

a e )

.O DV8LICI TY 45 N M W (,r s t i OESCnienCN issuto@l N/A l

ltiiiiiiiit il2 L.N,j 2Iai

- 2 io 4,. i NAME CF **EP ARER D.

C. Mitchell (717) 948-8554

{

  • wCN E :

. 10 Continued with Technical Specification 6.9.2.A(9).

A marginal loading condition was also indicated for the 1A ES motor control center.

27 Continued short term action is needed since the unit is in cold shutdown. A program for resolution of the problem will be defined prior to June 1, 1980.