05000333/LER-1979-014-01, /01T-0 on 790312:calculations in Piping Stress Analysis Are Being Redone on Accelerated Basis by Architect/Engineer.Shutdown Will Continue Until All Problems Are Resolved.Final Rept on Matter Is Forthcoming

From kanterella
(Redirected from ML19276F344)
Jump to navigation Jump to search
/01T-0 on 790312:calculations in Piping Stress Analysis Are Being Redone on Accelerated Basis by Architect/Engineer.Shutdown Will Continue Until All Problems Are Resolved.Final Rept on Matter Is Forthcoming
ML19276F344
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/21/1979
From: W. Verne Childs
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19276F339 List:
References
LER-79-014-01T, LER-79-14-1T, NUDOCS 7903290032
Download: ML19276F344 (2)


LER-1979-014, /01T-0 on 790312:calculations in Piping Stress Analysis Are Being Redone on Accelerated Basis by Architect/Engineer.Shutdown Will Continue Until All Problems Are Resolved.Final Rept on Matter Is Forthcoming
Event date:
Report date:
3331979014R01 - NRC Website

text

(7-77)

LICENSEE EVENT REPORT CCNTROL BLOCK: l l

l l

l l

lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATIONI 1

e lN!YlJlAlFl1 @l 0 l 0 l - l 0 l 0 l 0 l 0 l - l 0 l 0 l 0 l@l 4 1l1l1l1l@l l

l@

jo 1

7 3 4 LIC;.SEE CODE 14 15 LICENSE NLYSER

.' b

h LICE =.5E TY PE 40 57 CAT $d COYT lX l 0 l 5 l 0 l 0 l 0 l 3 l 3 l 3 @l 0 l 3 l 1 l 2 l 7 l 9 l@l 0 l 312 l 1 17 l 9 l@

0 1

/

6 by el DOCKET NU'/8EH 63 6')

EVENT CATE 14 75 REPORT DATE 60 EVENT DESCRIPTICN AND PROB ABLE CONSEQUE' SES h o

2 l

Please See Attachment l

0 3

l o

4 1

0 5

l I

o 6

l o

7 l

1 0

5 83 7

8 9 SY ST E '.1

CAUSE

CAUSE C 09 P.

VA LV E CCOE CCLE SU9COCE COV"O*.ENT COCE SUSCCCE SueCOCE I;l 2 l@ IX l@ lZ l@ l :l :l 21 :l Zi 21@

21@ l 2 l @

a o

7 8

9 10 11 12 13 Id l'J 2V SEQUENT! AL OCCURAENCE REPORT REvlS10N LE EVENTYEAR R E80RT '40.

CCCE TYPE NO.

@ ae A PCl 7l 9 l_l l 0l 11 4l l-l l0l1l lT l l_l l0l Cat 21 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EFFECT SHUTDOWN ATT AC Hv E NT NPRD4 PRIME COMP.

CCYPCNENT T A m ;i N ACTION CN PLANT METHCD HOURS SUBvlTTED FORMbUB.

SUPPL,l E R MANUFACTURER

]X l@l Xl@

Al@

y@

l 0l 7l 2l 01 lY@

l N l@

W@

l 2l 9l 9 9 l@

33 34 3b 30 3/

40 41 42 43 44 47 CAUSE DESCRIPTION AND CCARECTIVE ACTIONS i

o [

Please See Attachment I

li12 1 I

I i

i 1

1 l

l 1

4 80 3 9 SYN s

% PC'A E R OTHER STATUS Ol5CC RY DISCOVERY CESCRiPTiCm NA l

l D l@l Notification hv A/E l E l@ l 1l 0l 0l@l 1

S 7

3

-)

10 12 11 44 45 46 80 ACTisiTY CONTENT HELE ASED OF RELE ASE AYOUNT CF ACTIVITY LOC ATION OF RELEASE 1

6 l2l NA NA 4

3 10 11 44 45 50 DERCON'.E L E MPCSLD ES NUVEE R CE SC9t PTt C N

\\ 0 l 0 l 0 lhl TYPE @l 2l NA l

7 80 7

4 3 11 12 13 Pf 53SC " E., f *.. L r s EC N t a.'9 6 a OCSCR:8T60N l

l-l 0 l a l 0 @;l NA so 7

s 3 ii 2

LOSS OF CH O AY Aut T O F ACILITY

)

TveE CEscm m,

NA l

y @l i

4 30 7

m PUeuC:Tv NGC USE CNLY isw E o ceSca'ariCN NA i

lIllIIIIl1Iili [210 l N jhl sa sa 80 ;

4 3 io W. Verne Childs 315-342-3340 2

u,..g cy p ag u g n i,y y g 7 9 0 3 29 0 0 3t

ATTACH:. INT TO LER 79-014/01T-0 PROMPT REPORTABLE OCCURRENCE REGARDING SEISMIC STRESS ANALYSIS On March 12, 1979, the subject Prompt Reportable Occurrence was trans-mitted to your Headquarters. The following information provides the written followup report required by the Technical Specifications, Appendix A, Paragraph 6.11.A.4.1.

Subsequent to the Prompt Report submitted on March 12, 1979, the Regulatory Commission issued an Order to Show Cause on March 13, 1979, which required that the James A. Fit: Patrick Nuclear Power Plant be shut down until the seismic calculations in piping stress analysis be redone and problem areas, if any, re-solved. The calculations are being accomplished by the Authority's architect engineer on an accelerated basis.

A final report involving this matter will be made directly by the Headquarter's Office of the Power Authority of the State of New York to the Director of the Office of Nuclear Reactor Regulation.