Pursuant to 781215 Request by Applicant to Increase Thermal Power of Unit to 2700 Mwt,Or Requests IE Evaluation of Utils Past Mgt & Discussion of Outstanding Insp Items Re Safe Operation at Stretch Power Level
ML19274D206
Person / Time
Site: Millstone 
Issue date: 12/29/1978
From: Grimes B
Office of Nuclear Reactor Regulation
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
TAC-46174, NUDOCS 7901150281
Download: ML19274D206 (1)


Text

.

[e# *%

b UNITED STATES NUCLEAR REGULATORY COMMtsslON OI g,j. ';g

()

g WASHINGTON. D. C. 20555 g

g 3 m, ;

'%,,] /

December 29, 1978 Docket No. 50-336 MEMORANDUM FOR:

N. C. Moseley, Director Division of Reactor Operations Inspection FROM:

B. K. Grimes, Assistant Director for Engineering and Projects, DOR

SUBJECT:

MILLSTONE UtlIT N0. 2 S METCH PO!iER REQUEST By letter dated December 15, 1978, Northeast Nuclear Energy Company (NNECO) requested authorization to operate Millstone Unit No. 2 at an increased thermal power level of 2700 telt. Approval is requested concurrent with the next cycle reload with reactor startup currently scheduled for May 15, 1979.

The technical review of this 5 percent increase in power level is presently scheduled to be complete by April 9,1979.

As part of our review, we are considering the licensee's past capability to safely operate the Millstone units.

In this regard, an IE evaluation of NNECO past management performance and a discussion of any outstanding inspection items related to safe plant operation at a stretch power level is requested.

In order to be compatible with our review schedule, such an IE evaluation would be needed by February 9,1979.

If you have any questions regarding this matter, please contact the ORPM, ftr. Monte Conner.

a C

. w -,-

Brian K. Grimes, Assistant Director for Engineering & Projects Division of Operating Reactors Y90115n961