ML19273B954

From kanterella
Jump to navigation Jump to search
LER 79-030/03L-0 on 790518:during Cold Shutdown,Test Point Was Discovered in Error.Caused by Deviations in Conduction of Surveillance Test Procedures F-ISP-89.Procedure Was Immediately Correted & Surveillance Complete
ML19273B954
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/15/1979
From: W. Verne Childs
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19273B951 List:
References
LER-79-030-03L, LER-79-30-3L, NUDOCS 7906180580
Download: ML19273B954 (2)


Text

11 ill LICENSEE EVENT REPORT a 'tONTROL BLOCK: l l

l l l l 6

lh (PLE ASE PRINT OR TYPE ALL REQUIRED INFORMATION)

ITI l8 lN 9 l Yl J AlF 114 I@l15 0 l 0 l - l 0 lLICENSE 0 l 0NUVSER l 0 l - l 0 l 0 l 025l@l264 l 1LICENSE l 1 l 1TYPE l 1Jol@l67 CAT 68l@

J LICENSEE CODE CON T 1

O 1 8

ERM 60L j@l 0l 5 ] 0DOCK 61 l 0 l 0 l 3 l 3 l 3 @l 0 l 511 l 8 l 7 l 9 l@l 016 l 1 l 5 I 7 l 080!@

E T NUMBE R 68 69 EVENT DATE 14 75 REPORT DATE EVENT DESCRIPTION AND MOR ABLE CONSEQUENCES h Ml Please See Attachent I f0Til I l l o l41 l l 10151 I I O 6 I l 10171 l -

1 O s l I

' C$'o'E C0DE Su'sCO5e COMPONENT CODE Su'sCEoE Sui $ E FOTTl 7 8 I zI zl@ W@

9 to 11 12 c @ lz lz lz Iz lz Iz 18 L2_l@ Lz_J 13 18 19 20 SEQUE NTI AL OCCURRENCE REPORT REVISIOF LER RO EVENTvEAR NEPORT NO. CODE TYPE N O.

@ REP =_ 2317 1922I L-J- 10 13 10 I l'l i 0131 1LI l--J ol 23 24 26 27 N 29 w 31 32 K N A ON ON PL NT T D HOURS S B IT D FO h B. SUPPLIE R MANUFACTURER b@lII @

33 34 l3d z l@ lz 36 l@ 31 0l 0l 0l 0 40 lY @

41 lN 42 lQ y@

43 z l9 l9 l9 l@

44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h i O l Please See Attachment I li lil l I Ii i > I I I u.nj i I i 4 l _

7 8 g 80 STA S  % POWE R OTHER STATUS ISCOV RY DISCOVERY DESCRIPTION y (G j@ l0 l0 l0 l@l NA l l B l@l Surveillance l A TlVITY CO TENT Or RELE ASE AMOUNT OF ACTIVITY LOCATION OF RELEASE 7

1 6 RELEASE @D l zl@l 8 9 10 11 NA 44 l L 45 NA 80 l

PERSONNEL EXPOSURES NUN *B E R TYPE DESCRIPTION i 7 l0l0l0l@lzl@l '

N l

PERSONN A',N;UJiES oESCR,P,,0N@

i a

~ e.,- e 0 l 0 l 0 l@[12 NA 2353 278 l 7 8 9 11 80 LOSS OF OR DAMACE TO FACILITY TYPE DE SCRIPT ION y zl@l 8 9 NA l 1 10 80 iS DESCHIPTION R [ hSuf @ l NA l ll l l l l l l l l Lj $

1 8 9 to 68 69 80 E

  • ~

NAME OF PREPARER PHONE:

  • B0 y,.6180 S go - - .

POWER ALT 110RITY OF Tile STATE OF NEW YORK JA?'":S A. FITZPATRICK NUCLEAR P0hTR PLANT DOCKET NO. 50-333 ATTACilMENT TO LER 79-030/03L-0 Page 1 of 1

\

While in a cold shutdown condition, during the conduct of Instrument Surveillance Procedure F-ISP-89 titled " Suppression Chamber / Reactor Build-ing Vacuum Breaker Isolation Valve Differential Pressure Switch Instrument Functional Test", the Technicians performing the test noted that a test point in the procedure was in error. The procedure was immediately corrected however, investigation revealed that earlier surveillance was conducted utilizing the procedure containing the error. Further investi-gation indicated that while the Technicians performing the earlier test accomplished the work in the proper manner they had failed to take the action required to correct the test point set forth in the procedure.

Technical Specification Appendix A, Paragraph 6.8.A requires the imple-mentatior of procedures to control surveillance tests and certain other "

work. Contrary to these requirements, the earlier conduct of the sur-veillance test requirements satisfied by F-ISP-89 was performed by devi-ating from an approved procedure by changing the input signal to a dif-

ferent test point and no action was taken to correct the procedure.

! The required surveillance was conducted properly and the event did not represent any hazard to the public health and safety. The reactor was l in a cold shutdown condition.

i As noted above, the procedure was immediately corrected and the l surveillance successfully completed. In addition, Operations and Instru-j mentation and Control personnel will be counseled in adhering to our pro-

! cedural requirements for both temporary changes and procedure revisions.

i 2353 279 I