Text
-
-g TI,7595/2 e
At tucliment I l' arc 1 of 2 e
OFFirF. OF IN91TCT10N A'in 1:N rul< rF,'ti'N1 BMI S ITK INSPECTOR DA!!.Y KF. PORT nate. 4/12/79 _.
sete Oconee 1, 2, 3
- Inspector (n) gqtgle,_,_,,,
Io rd_ _. _.... _
..cuiial Plant Statua:. _, m t,r o,
,mi+<
ap eratir4 at 10.0%_... _
i 1
Review of Similar Transients (Icem 2 of IES79-05A):
Complete.
Duke response transmitted to Region II office.
(Dated 4/10/79) v h.
Review and Revision of Operating and Maintenance Procedurcs (ftems 3, 4, 5, 7, 8, 9, 10 of IEB 79-05A):
- Duke response to 3, 4, S. and 9 transmitted to Region II o f f ic e.
(Dated 4/10/79)
Response to 7, 8, and 10 to be provided by April 16, 1979.
- d. viev and hnpit% ntation of Changes in runtainment isolation (Item 6 IEB 19-05?A):
Duke response to item 6 transmitted to Region II office.
(Dated 4/10/79).
L d.
Training of l'lont Personnel (Itcein 1, 4, 11 and plant / procedures et.an;te ):
Duke response to items 1, 4, and 12 transmitted to E. L. Jordan, 4/11/79.
Response to item 11 to be provided by April 16, 1979.-
7906290 56 } -
2325
.303 i
,.~-
-. ~ ~ ~
n
v..
3
- T1 2595/2 C C d4M4 Attachment i Par.o 2 of 2 4
10:00 a.m., 4/11/79 2.
SUMMAR) r4 NRC I.'; SPI:CrloN At Tlv!iT DURIN(; PI'S i t ul_ g g gjy,_,
( Aal ! r en t. It<am f.a t hru 7..it ali.sve, give ollo's f micpendent /nly,ni f ic.mt efiorL, 16emt i f y shi fI a on wh!ch ai t lvit v t.-is iloan ilur iny. ps.% 24 h<mru)
Gserved control room operations - day and night shif ts.
Inspected remote shutdown panels.
(Day Shift)
Comple ted review of items B-1, B-2, B-3, B-4, B-5, C-3, C-4, C-5, C-6, C-7, and C-8 of TI 2595/2.
System alignment verified for accessible ccmponents on Emergency Feedvater System (Units 1, 2, 3), low pressure 4njection (Units 2, 3), Rx Building Spray (Units 2, 3), Core Flood (Units 2, 3), High Pressure Injection (Unit 3).
This effort should be completed by end of day shif t 4/12 -
resanining systems include Rx Building Penetration Room Ventilation System, Low Pressure Service Water, and verification of power supplied f or containment isolation valves.
Report on items D-1, D-2, D-4 of TI 2595/2 transmitted to Region II office.
Reviewed additional changes made to loss of coolant emergency procedure.
Inspector disagreed with changes and licensee corrected procedure to satisfy inspector's ccanents.
5.
STLl'$ Of' INSPECTOR DISCl!.u:loNS WITH PIAhi l't:RSONNF.I.-
3riefed one individual on evening shif t.
One man remaining to be briefed - he returns to station on 4/18/79.
4 4
DESCll?t'T ION OF Cl NF.R Af. Pl. ANT STATUS (i.e.. opera t ing power level, pit..ined ch me.c.a.. sc hedu led outagea, F.SF out of utvice, major saintenance.
r ap.ir *.nh !c occur renc e:5, etc.)
Unit 1 100%)
No major maintenance.
Unit 2 100%)
No ESF out of service.
Unit 3 100%)
>]4 j
j
.3 4
~
-