ML19270H399

From kanterella
Jump to navigation Jump to search
B&W Site Inspector Daily Rept on 790412.Plant Status:Reactor at Full Power W/No Known Problems,No Major Maint Planned & No Engineering Safety Features Out of Svc
ML19270H399
Person / Time
Site: Rancho Seco
Issue date: 04/12/1979
From: Andrea Johnson, Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML19270H391 List:
References
FOIA-79-98 TI-2595-2, NUDOCS 7906290587
Download: ML19270H399 (2)


Text

.

TI 2595/2 Page 1 of 2 0FFICE OF INSPECTION AND ENFORCEMENT B&W SITE INSPECTOR DAILY REPORT Date 4/12/79 Site Rancho Seco Inspector (s)A. Johnson L. Miller General Plant Status:

100% Power - No known problems.

1.

SUMMARY

OF LICENSEE RESPONSE TO IE BULLETING 79-05 AND SUPPLEMENTS:

Review of Similar Transients (Item 2 of IE3 79-05A):

a.

Response telefaxed to HQ's 4/11/79.

~

b.

Review and Revision of Operating and Maintenance Procedures (Items 3, 4, 5, 7, 8, 9,10 of IEB 79-05A):

Same as stated in 4/11/79 report, Review and Implementation of Changes in Containment Isolation.

c.

(Item 6 IEB 79-054A):

Completed (as specified in 4/10/79 report).

2325 311 d.

Training of Plant Personnel (Items 1, 4,11 and plant / procedures changes):

The only personnel who have not been trained are the tnree licensed operators presently at Lynchburg.

7906 20065r7

TI 2595/2 Attachoent l' Page 2 of 2 2.

SUMMARY

OF NRC INSPECTION ACTIVITY OURING PERIOD 4/11/79 (Address Items 1.a. thru 2.d. above, plus other independent /significant e f fort, identify shif ts on which actidity was done during past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />):

Inspection coverage 5:00 AM to 8:15 PM.

Control room surveillance and discussions with licensee. Monitored licensee training.

Item III.B of TI 2595/02 is comolete with the exception of licensed operators in Lynchburg. Completed Items III.C.1 and 2 with exception of P&ID verifi-cation for reactor building.

3..

STATUS OF INSPECTOR DISCUSSIONS WITh PLANT PERSONNEL-All personnel have been briefed except two licensed operators presently at Lynchburg.

4.

DESCRIPTION OF GENERAL PLANT STATUS (i.e., operating power :evel, planned changes, scheduled outages, ESF out of service, maj maintenance, reportable occurences, etc.)

100% Power.

Next scheduled outage is in May 1979.

No ESF S. Items out of service.

No major maintenance.

No planned changes in pe 3r operating level.

Summary of TI 2595/2 Items Canpleted to Date:

III.B - Completed except for three licensed operators presently at Lynchburg.

III.C.1 and 2 - Complete except for verification of P&IO for containment isolation.

V - Completed except for two licensed operators presently at Lynchburg.

2325

12 e