TI 2595/2 Page 1 of 2 0FFICE OF INSPECTION AND ENFORCEMENT B&W SITE INSPECTOR DAILY REPORT Date 4/12/79 Site Rancho Seco Inspector (s)A. Johnson L. Miller General Plant Status:
100% Power - No known problems.
1.
SUMMARY
OF LICENSEE RESPONSE TO IE BULLETING 79-05 AND SUPPLEMENTS:
Review of Similar Transients (Item 2 of IE3 79-05A):
a.
Response telefaxed to HQ's 4/11/79.
~
b.
Review and Revision of Operating and Maintenance Procedures (Items 3, 4, 5, 7, 8, 9,10 of IEB 79-05A):
Same as stated in 4/11/79 report, Review and Implementation of Changes in Containment Isolation.
c.
(Item 6 IEB 79-054A):
Completed (as specified in 4/10/79 report).
2325 311 d.
Training of Plant Personnel (Items 1, 4,11 and plant / procedures changes):
The only personnel who have not been trained are the tnree licensed operators presently at Lynchburg.
7906 20065r7
TI 2595/2 Attachoent l' Page 2 of 2 2.
SUMMARY
OF NRC INSPECTION ACTIVITY OURING PERIOD 4/11/79 (Address Items 1.a. thru 2.d. above, plus other independent /significant e f fort, identify shif ts on which actidity was done during past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />):
Inspection coverage 5:00 AM to 8:15 PM.
Control room surveillance and discussions with licensee. Monitored licensee training.
Item III.B of TI 2595/02 is comolete with the exception of licensed operators in Lynchburg. Completed Items III.C.1 and 2 with exception of P&ID verifi-cation for reactor building.
3..
STATUS OF INSPECTOR DISCUSSIONS WITh PLANT PERSONNEL-All personnel have been briefed except two licensed operators presently at Lynchburg.
4.
DESCRIPTION OF GENERAL PLANT STATUS (i.e., operating power :evel, planned changes, scheduled outages, ESF out of service, maj maintenance, reportable occurences, etc.)
100% Power.
Next scheduled outage is in May 1979.
No ESF S. Items out of service.
No major maintenance.
No planned changes in pe 3r operating level.
Summary of TI 2595/2 Items Canpleted to Date:
III.B - Completed except for three licensed operators presently at Lynchburg.
III.C.1 and 2 - Complete except for verification of P&IO for containment isolation.
V - Completed except for two licensed operators presently at Lynchburg.
2325