B&W SITE INSPECTOR DAILY REPORT Date 4/12/79 Review and Implementation of Changes in Containment Isolation c.
(Iten 6 IEB 70-05A):
The licensee is conducting the review required by this iten and is evaluating which lines could be isolated upon safety injection initiation without degrading core cooling capability.
d.
Training of Plant Personnel (Items 1, 4,11 and plant / procedures changes):
Training sessions scheduled for today for maintenance and supervisory personnel will ccmplete the initial t. raining requirements of IEB 79-05A.
Training in revised procedures will be conducted prior to raising average reactor coolant system temperature above 2000F after the current refueling outage.
2.
SUMMARY
OF NRC INSPECTION ACTIVITY OURING PERIOD t/11-12/70 Control Room observations; night shift; 4/12/79 Discussions with licensee representatives c)ncerning items la thru ld above; day shift and evering shift; 4/11/79; day shift; 4/12/79.
Onsite insoection of FsF in acenrdanca witr ~ tam tri e 1 nf en95/2; cay shift and evening shift; 4/ ll/79 11 2325 109 7906290555\\
O
B&W SITE INSPECTOR DAILY REPORT Date 4/12/79
~
3.
Status of Inspector Discussions with Plant Personnel -
Discussions in accordance with item V of TI 2RCS/7 are c=P ato.
l 4.
Description of General Plant Status -
The plant is in a refueling outage which commenced S/30/79. Core shuffle activities coninenced 4/10/79, but have proceeded slowly due to, problems with the control rod handling mast.
Major maintenance itsns in progress are the same as reported on 4/10/79.
Estimated schedule:
Plant heatup - 4/30/79 Reacter startup - 5/5/79 Pcwer ascension - 5/8/79 25
- ,10 O
_