/03L-0 on 790110:during Freon Test,Noted That Freon Penetration Through Charcoal Absorbers Exceeded Tech Spec Max.Caused by One of Charcoal Clamping Levers Not Being Fully Latched
ML19263C535
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 02/05/1979
From: Schnitzmeyer J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19263C532 List:
References
LER-79-002-03L-03, LER-79-2-3L-3, NUDOCS 7902260451
Download: ML19263C535 (3)


LER-1979-002, /03L-0 on 790110:during Freon Test,Noted That Freon Penetration Through Charcoal Absorbers Exceeded Tech Spec Max.Caused by One of Charcoal Clamping Levers Not Being Fully Latched
Event date:
Report date:
2541979002R03 - NRC Website

text

-...., _

(7-71)

LICENSEE EVENT REPORT g

cNTR,;ei.OCel l

l l

l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFoRMATION) 1iI Ll Q j A lD l1 l@! O I 0 l 0 l - l 0 l 0 l 0 l -

0 l 0 l 0 l@l4 l1 l1 11 l1 l@l l

l@

iO

/

B 9 LICENSEE CODE 14 15 LIC D.S E NV.* 3 E H 25 N

LICENSE TYPE J1 57 CA r b8 COYT "C% LLj@l 0 i s to lo lo 12 s 14 l@l o I i i i l o 171 9l@Lni91n sIvIol@

io i

S

/

8 60 E1 DOMET NUM4ER 68 69 EVENT OATE 74 75 REPORT DATE EO EVENT DESCRIPTION AND PROB ASLE CONSEQUENCES h l While performing a freon test, procedure QTS 260-2, on the 1/2B Standby Gas Treat-l [o

2 l ment System (SBGT), it was determined that the freon penetration through the charcoal l

o 3

l absorbers was 12.1%.

This exceeded the 1% limit specified in Technical Spec 'i ca t i on l

o 4

o;3y ; 3.7.B.2.a.2.

The redundant SBGT System was proven operable as required.

g I

lo is i I l

10 l 7 ] [

I 10 8

l 80 7

8 9 SYSTEM

CAUSE

CAUSE COVP.

VALVE CODE CODE SUSCODE COMPONENT CODE SUBCODE SU8 CODE o

9 Isin @ U@ W@ Ir li IT lr la 18 W@ U @

7 8

9 10 11 12 13 18 19 20 SEQUENTI AL OCCURRENCE REPORT REVISION LEHfRO EVENT YE AR REPCRT NO.

CODE TYPE NO.

@,agg 7 19 I l-l 1010121 y

10131 lt I L_]

LOJ

_ 21 22 2J 24 26 27 23 29 30 31 32 AKEN ATO ONPLANT T

HOURS S 3 IT D FOF 1 B.

S PLI E MA U ACTUREn LB_}@[Z_l@

[Z_j@

[Z j@

l 0 l01010 l [y.j @

lNl@

lNl@

B 10 17 15 l @

33 34 3b 36 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS 1

0 10ne of the four charcoal bed assembly clamoina levers was not fully latched.

This l

l i l i l l a l lowed a sma l l f raction of the f reon to bvoass three of the charcoal cells.

The I

] gasket and charcoal cells were inspected and relatched.

A second freon test was l

1 7

l performed satisfactorily. A charge to procedure QTP 400-3 will be implemented l

li 3

] to check these levers on a weekly basis.

l X 3

4 80 7

8 9

  • POWER OTHER STATUS DIS RY DISCOVERY DESCRIPTION JS W@ l0 l 513 l@l NA l

l B l@l Routine Test l

[i s

A TIVI rY CO TENT LOCATION OF RELEASE RttEr. SED OF RELE ASE AMOUNT OF ACTIVITY ~

l l

NA l

by l Zl @ lZ lgl NA 1

8 9 10 11 44 45 80 PERSONNEL EXPOSUitES NU*?B E n TYPE DESCRIP TION

"^

l t i I 7 I 10 I l@LzJ@l

,EnsONNELwULS iil-1101geEgl@loEScRiPriONQ I

Nu I

80

& 9 11 12 LO".3 9 OR D AYAGE TO FACILI TY TYP; DE SCRIP TIO*J l

[TTF1 (Z jg[_

NA 80 8 9 la PU. L I CI T Y NRC USE ONLY

' e' M lN j@DESchlPTION t uu g 6 l

NA ll lllllllllll

" 790226 c4S t

- M, en. S J. Schnitzmeyer p g g., g; y

l.

LER HUMBER:

79-02/03L-0 11.

LICENSEE NAME: Commonwealth Edison Company 0.uad-Cities Nuclear Power Station 111.

FACILITY NAME: Unit One IV.

DOCKET NUMBER: 050-254 V.

EVENT DESCRIPTION

On January 10, 1979, Technical Staff personnel were performing a freon test, procedure QTS 260-2, on 1/2B Standby Gas Treat-ment System (SBGT).

At 5:35 p.m., it was determined that the freon penetration through the charcoal absorbers was 12.1%.

This exceeds the 1% limit specified in Technical Specification 3.7.B.2.a.2.

The redundant SBGT System was started and run for 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> to prove operability as requi red.

VI.

PROBABLE CONSEQUENCES OF THE OCCURRENCE:

The 1/2A SBGT System was operable during the time when the leakage of the 1/2B SBGT System exceeded the limit.

A freon test was performed on 1/2A SBGT System on January 9, 1979 and the leakage was found to be 0.62%.

Furthermore, the 1/2B SBGT System was operable and capable of maintaining negative pressure on secondary cotainment i f i t had been requi red.

The filter differential pressures were normal, and the heater and fan operation were acceptable. The HEPA filters were tested and found to be acceptable using a DOP test (procedure QTS 260-1).

Vll.

CAUSE

An inspection revealed that one of the four charcoal bed clamping rack locking levers was out of the full forward position.

This allowed a small fraction of the air fiow to bypass three of the charcoal beds.

By moving these levers forward, pressure is applied to the downstream closed end of the charcoal cells.

In this manner, the charcoal cells are pressed firmly against a verticle baffle plate which is fitted with a gasket to assure a good seal.

Slots in the baffle give access to the interior of each charcoal cell.

The air must therefore pass upward and downward through the charcoal beds.

The housing is provided with a total of four levers and by moving these levers forward, all twelve charcoal cells are locked into place.

Gravity in addition to mechanical resistance maintains the mechanism in the proper position.

The reason the lever was out of position is not known.

The SBGT Systems are manufactured by the Barnebey Cheney Company.

, ~..

Vill.

CORRECTIVE ACTION

The baffle plate to charcoal cell assembly gasket was inspected to assure it was in good condition.

The charcoal cells were replaced and the clamping rack locking levers re-engaged.

A freon test was subsequently performed and the leakage was found to be 0.93% which satisfies the Technical Specifications.

A change to the Technical Staft weekly in plant inspection, procedure QTP 400-3, will be implemented to visually check that the charcoal filter latching levers are in the full forward engaged position.