ML19263C518

From kanterella
Jump to navigation Jump to search
LER 79-008/03L-0 on 790125:core Performance Surveillance Not Done on 790120-22.Operations Surveillance Test for Daily Checks Was Being Developed to Include check-off of Surveillance Requirements.Caused by Operator Error
ML19263C518
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/20/1979
From: W. Verne Childs
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19263C515 List:
References
LER-79-008-03L, LER-79-8-3L, NUDOCS 7902260394
Download: ML19263C518 (2)


Text

~ ~ ~ ~ , _ _ . . . _ _ _ _ . . . . _ _ _ _ . . . . . _ _ . . . . . . . . .

(7-77)

LICENSEE EVENT REPORT

$ ' CONTROL BLOCK:l 1 l l I I lh O

(PLE ASE PRINT OR TYPE ALL HEOUIRED INFORMATION) lo lil lN lY J l A l F l 1 l@l 0 l 0 -lo LICENSE 14 0 l0 NUMBEMl0 l- l0 lo lo l@l4 25 26 l1 l1 11 11 l@l5 7 L A T 68l@

LICENSE 1YPE JO 7 8 9 LICdSE E CODE lb COrrt 7

0 i 8

"$$ Lj@l015lo1010 S

60 61 DOCKET NUMBER 3 3 l 3 @l o 11 12 Ic l 71ohlnlololnl I nih bd G'> EVENT DATE 14 7S REPORT DATE 60 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h Io i2l l Please See Attachment O 3 l 0 4 l l

0 5 d 0 6  !

O 7 l i O H  !

l 80 7 8 9 SYSTEU CAUSE CAUSE COMP. VALVE COCE CODE SUBCODE CO*JPONENT CODE SUBCODE SUBCODE 7

O oi 8

Iz Iz @ L^_J@ LaJ @ l ' I z l z i z i ' l ' @ L:J@ 12 9 10 11 12 12 18 13 2J l@

SEQUENTI AL OCCU R R E N CE REPORT REVISION EVENT TE AR REPOR T NO. CODE TYPE NO.

LE R RO O ay.gr s 17 ol 21 22 l--J 2J lofofsi 24 26 I/l 27 28 oI3I 29 U

30 I-l 31 W32 TAKER ACT ON ON PLA T tET HOURS S B IT D FO 9 bO8. SUPPLIE MANUFACTURER lJJGl@l34Z l@ l Z l@ l362 l@ l0l0l0lol 3/ 40 W h lNlh 41 42 43 zlh Izl410 9lh 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h i o l Please See Attachment I i i i I

l i 121 1 i 3 l l

lil411 7 8 9 80 SA S  % POW E R OTHER STATUS ISCOV RY DISCOVERY DESCRIPTION i s lE [g l0l7l3l@l NA l W @l Administrative Review l ACTivlTY CONTENT RELFASED OF RELE ASE , AMOUNT OF ACTIVITY LOCATION OF RELEASE li 16 I [Z ] @ l Z lg NA 44 l l 45 NA 80 7 8 '3 to 11 PERSONNE L EVOSURES NUMB E R TYPE D E SCRIPTION ~

li l 71 lo lo o l@lz @l NA 80 I

7 8 9 11 12 13 PERSONNE L INJURIES NUYBER DESCRIPTION l i l a l 10 0 10 Igj NA 80 7 8 9 11 12 LOSS OF OH DAVAGE TO F ACillTV Q TYPE DESCRIPTION  %./

NA l 7

i 9 8 9 lZ l@l10 80 PUBLICITY NRC USE ONLY 2 0 '['j'g["'"'"' " NA 79022603% i 68 69 i iii iiiiiiIi 80 5 7 8 9 10 W. Verne Childs 315-342-3840 o NAME OF PREPARER PHONE:

, ATTACllMENT TO LER 79-008/03L-0 During normal operation, as part of a review of surycillance test data, it was discovered that the Core Performance Surveillance required by Technical Specification, Appendix A, Paragraph 4.1.C, 4.5.11. and 4.5.I had not been performed on January 20, 21, and 22, 1979. The specifications referenced above require that the Minimum Critical Power Ratio (MCPR), Average Planner Linear lleat Generation Rate (APLilGR), and Linear lleat Generation Rate (LilGR) be deter-mined daily during reactor power operation at greater than 25% of rated power.

As noted in related Licensee Event Reports79-001 and 79-007, Operations Surveillance Test F-ST-40D titled " Daily Sutweillance Chechs" was being developed and revised to include a check-off of a number of surveillance requirements. This new surveillance test (F-ST-409) was reviewed by the Plant Operations Review Committee and approved on January 31, 1979 and implemented on February 1,1979.

In addition, the Operations Superintendent has carefully reviewed the data of F-ST-400 and other surveillance requirements to preclude recurrence of this and similar events.

i