LER 79-002/03L-0 on 790110:during Routine Insp of Reactor Water Cleanup Pump Rooms,Small Leak Was Found on 2-1205B Cleanup Pump Suction Line.Cause Unknown.Leak Was Isolated & Linear Indication on Flange Ground Out
ML19261B211
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 01/26/1979
From: Swales J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19261B208 List:
References
LER-79-002-03L, LER-79-2-3L, NUDOCS 7902140171
Download: ML19261B211 (2)


Text

. - ..

P 77)

LICENSEE EVENT REPORT CONTR[L BLCCK: [

1 l l } l l lh 6

(PLEAsE PRINT OR TYPE ALL REQUIRED INFOR*4ATION)

Iill llF l9 L 10 l A D l 214!@!'S 0 0 l 0 l - LICE!ME l 0 l 0f.UVS  ! 0ERl- (0 l0 l 0 25l@l264 l 1LICENSE l l l 1TYlPE1JJl@lStCATEd l l@

, LICENSEE CODE COTT

[o_LU Sg Z l L}@l 015101010121615l@l011 68 63 Il 10 17 19 l@lofIl2l6l719l@

EVENT DATE 74 75 REPO:tT D ATE E0 7 8 63 61 COM ET NW3E54 EVENT DESCRIPTION AND PROS AELE CONSEQUENCES h '

o 2 l During a routine inspection of the Unit 2 Reactor Water Clean-up pump rooms, a small l leak was found on the 2-1205B clean-up pump suction line. A visual inspection of [

lm l g 4 l the leak revealed a 3/4 inch linear indication on the spool piece flange adjacent l

[g 3 ; to the 2-1201-55B clean up pump suction valve. Safe plant operation was not affected l g g [

by this occurrence because the leak was located in a section of piping outside the l

[gl7 l primary containment isolation valves. The volume of leakage was small. l I

o e 1 7 8 9 COVP. VALV E SYSTEM CAUSE CAUSE CODE CODE SUSCODE COVPON ENT CODE SU9 CODE SUSCODE 10191 i C I c l@ LEj@ l C l@ l P l ! l P E l X l X l@ l A l@ [z_j 18 19 2J 7 8 9 10 11 12 13 SEQUE N TI AL OCCU R R ENCE REPORT REVISION EVENT YE A A REPORT NO. CODE TYPE N O.

@ g/PO LER I719l

,,_21 22

-l 23 l 0l 0l 2l 24 26 y

27 l0l3l 28 23 l Lj 3d

[--J 31 W

32 EFFECT SHUTDons ATTACHVENT N'R D4 PRIVE COVD. COMPONENT ACitON F U T U54 E FORMdVB. SUFPLIER MANUFACTURER TAKEN ACTION ON PLANT M E T r4 GD HOURS SU5YlTTED

[B_J@l zi@ l35z l@ L z_j@ 01 O! 01 01 I yl@

41 LtLJ@

42 l43A l@ Iz 44 19 19 b47I@

33 34 36 31 da CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h Ii l0l l The exact cause of this occurrence is unknown. The immediate corrective action was to l i ii isolate the leak. The linear indi cat ion was g round ou t . The area was then eenetrnnt I i 7 l tested to verify that the entire indication had been removed. The around out area I was then filled with weld material and dye-penetrant tested. l i3 l3ll t 4 1 80 7 6 9

  • . POWE R OTHER STATUS DISC RY DISCOVERY DESCR68 TION A 5 l A lgl Ope ra to r Observation i 3 [ E jg l0 l9 l7 l@j NA l l ACilVITY CO' TE NT nuEmsE0 0,R m ASE LOCATION OF RELEASE @

ITTil8 9L J @ l Zl@l Av0uNT"^ OP ACrivlTv 44 I

45

@"A l 80 I

i 10 11 PERSON'.EL E XPO3UR ES NU' En TY CN i

' l

!i' i l I I l@l '/E l @DESCRIP l

" 8 n nsONN J'IN, A S e.u. .u n OtSCR. TION @ l fi-8 9 101010l@l 11 12 NA 80 Lc'S C' 04 OAVAGE TO F AC:LITY .

TvP CitCntPTtON l

[i 96 9lzl@l 10 UA 80 snc use Onty n.]7"U lllllllllJlll3

!2h]INI8lMneTiONh m HA l u e so.;

a d 0 21,4,017[ a n swales 309-654-2241, ext. 247 e pg g, .g . {

O

l. LER NUMBER: LER/R0 79-02/03L-0
11. LICENSEE NAME: Commonwealth Edison Company Quad-Cities Nuclear Power Station Ill. FACILITY NAME: Unit Two IV. DOCKET NUMBER: 050-265 V. EVENT DESCRIPTION:

During a routine inspection of the Unit 2 clean-up pump rooms on January 10, 1979, a small leak was found on the 2-12058 cleanup pump suction line. The leak was located between pump suction valve 2-1201-558, and the cleanup pump suction spool piece. The leak was discovered at 0445 hours0.00515 days <br />0.124 hours <br />7.357804e-4 weeks <br />1.693225e-4 months <br /> on January 10 and the 2-1205B cleanup pump was isolated before 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> the same day. A visual inspection of the leak revealed a 3/4 inch linear surface indication on the spool piece flange adjacent to the 2-1201-55B valve. The indication was not located in a weld. The last occurrence of this type was reported in LER/R0 78-23/03L-0.

VI. PROBABLE CONSEQUENCES OF THE OCCURRENCE:

The leak was located in a section of cleanup piping beyond the Primary Containment Isolation Valves, M0-2-1201-2 and M0 1201-5; therefore, safe plant operation was not affected by this occurrence. The primary containment isolation function of these valves was not affected. The volume of the leakage was small and was manually isolated by closing valves 2-1201-SSB and 2-1201-61B. There were no uncontrolled radioactive releases to the environment or unplanned personnel exposures as a resul t of this event.

Vll. CAUSE:

The exact cause of this occurrence is unknown. The indication occurred in the pump suction spool piece flange Just downstream of valve 2-1201-55B. The flange is made of 304 stainless steel, schedule 40S and is located on a 3 inch line.

Vill. CORRECTIVE ACTION:

The immediate corrective action was to isolate the leak and visually examine it. Af ter examination, the linear indication was ground out. It was then dye-penetrant tested to verify that the entire Indication had been ground out. The leak was then filled with weld material and penetrant tested once again to verify a proper weld.