05000317/LER-1979-050-03, /03L-0:on 790924,reactor Exceeded License Limit of 2,700 Mwth.Caused by Operator Error.Power Was Reduced by Insertion of Control Element Assemblies.Operator Was Instructed of Importance of Maintaining Parameters

From kanterella
(Redirected from ML19259D220)
Jump to navigation Jump to search
/03L-0:on 790924,reactor Exceeded License Limit of 2,700 Mwth.Caused by Operator Error.Power Was Reduced by Insertion of Control Element Assemblies.Operator Was Instructed of Importance of Maintaining Parameters
ML19259D220
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 10/11/1979
From: Davis S
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19259D217 List:
References
LER-79-050-03L, LER-79-50-3L, NUDOCS 7910170391
Download: ML19259D220 (2)


LER-1979-050, /03L-0:on 790924,reactor Exceeded License Limit of 2,700 Mwth.Caused by Operator Error.Power Was Reduced by Insertion of Control Element Assemblies.Operator Was Instructed of Importance of Maintaining Parameters
Event date:
Report date:
3171979050R03 - NRC Website

text

(7 77h, LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l lh (PLEASE PRINT OR TYPE ALL REOUtRED INFORMATION) i 8

IM10lclclNl1lgl5 01Oi-l0l0l0lOi0l-[0l0lgl4l1l1;li1lgl l

ig o

i 9

LICENSEE CODE 14 1

LICENSE NVMBER 25 26 LICENSE TyeE JO

$7 CAT 68 7

8 CON'T l @l0 l5 l0 l0 ;0 l3 l1 l7 lgl 0l 9l 2l 4l 7l 9l@l'110] Il 1l 7l 9 l@

s[RCE l l

o 2

i 8

60 61 DOCKET NUMB ER 68 69 EVENT CATE 74 75 REPORT DATE 80 EVENT DETCRIPTION AND PROB ABLE CONSECUENCES h 1 At 0600. the reactor exceeded the license limit of 2700 Mwth as printed out I

o 2

l on the computer loo typewriter with a power of 2702 Mwth. The operator took l

o 3

l imediate action and reduced reactor power to less than 2700 Mwth by 0605.

I o

4 This is not a repetitive occurrence.

I o

s o

6 l

l 0

7 I

I I

ois l 80 7

8 9 C E CC E

$U8C E C0vPCNENT CCDE SL8C CE SL OE lZ i Z g l Al@ l A l@ l Z j Z j Z j Z l Z l Z l@ l Zl@ J @

o 9

7 8

9 to 11 12 13 18 19 20 SE QUENTI AL OCCUARENCE REPCRT REVISION LER RO EVENTYEAR REPCRT NO.

CODE TYPE NO.

@ 4E g l217l9l l-l l0l5l0 y

0 l3 l lL l l-l 10 l y

22 23 24 26 27 28 29 JQ 31 32 N A CN C PLANT MET MOURS 22 s SNIT FOR 8

sLPPLIE MANUFACTLRER [Hlgl34Z lg Wg [36Zl@ l0l0l0l l

l Y l@

lNl@

lZl@

Z[9l9l9l@

33 35 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h l Upon investiaation, it was detemined that the coerator, realizino that the I

i o

i i

l fnstantaneous reactor oower was hich, borated to reduce oower; however. this I

i action was not adequate. After realizina the averace hourly power exceeded I

7

] 2700 Mwth, the operator imediately reduced oower bv insertina Control Element I

i 3

l Assemblies.

I i

A 80 7

8 9 5A

% PCWER OTHER STATUS ISCO RY DISCOVERY DESCRIPTION l El@ l l l 0 ; 0 l@l NA l

lAl@l Ooerator Observation l

i s

A!riviTv AMOUNT OF ACTIVITY @ l LOCATION CF RELEASE @

CO TENT Rett AsEO@c aEu ASElZ[g NA NA l

Zl t

e 7

8 9 10 11 44 45 80 8ERSONNEL ExPOSLRES l0f"El"01@IE'l@f""""

l 7

.ERsONNE L,NJ Es DEsCRiPficN@

Nuv8ER l

al 0l 01@'l NA 4

7 8 3 11 12 80

'S'E ' 9is'C"^ VON' '' " @

79io17o 3 9 l Zl@l NA i

9 7

6 9 10 80 issL

DESCRIPTION

8, 2

o l NA I

lllll lll l111 e

68 69 80 * ;;

7 8 3 1C NAVE OF PREPARER __

PHONE:

LER NO. 79-050/03L EVENT DATE 09/24/79 REPORT DATE 10/11/79 DOCKET NO. 50-317 ATTACHMENT CAUSE DESCRIPTION AND CORRECTIVE ACTIONS:

The ooerator involved was instructed as to the importance of maintaining oarameters within license limits. Since this is an isolated event, no further corrective action is deemed necessary.

a