ML19259D217

From kanterella
Jump to navigation Jump to search
Forwards LER 79-050/03L-0
Date released: 09/30/2019 Download: ML19259D217


LER 79-050/03L-0:on 790924,reactor Exceeded License Limit of 2,700 Mwth.Caused by Operator Error.Power Was Reduced by Insertion of Control Element Assemblies.Operator Was Instructed of Importance of Maintaining Parameters
ML19259D220
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 10/11/1979
From: Davis S
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19259D220 (2)
Forwards LER 79-050/03L-0
ML19259D216
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 10/11/1979
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19259D216 (1)