ML19257B412

From kanterella
Jump to navigation Jump to search
LER 79-029/03L-0:on 791206,prior to Performing Leak Test, Primary Containment Oxygen Analyzer Return Isolation Valve AO 2-8803 Would Not Fully Close.Caused by Binding of Valve Stem & Valve Packing.Valve Removed & Repacked
ML19257B412
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 01/02/1980
From: Soden R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19257B406 List:
References
LER-79-029-03L-04, LER-79-29-3L-4, NUDOCS 8001150675
Download: ML19257B412 (1)


Text

NHC FORM 366 U. S. NUCLEAR REGUL ATORY COMMISSION (7 77)

. . LICENSEE EVENT REPORT CONTROL BLOCK: l i

l l l l l o

lh (PLE ASE PRINT OR TYPE ALL REQUIRED INFORMATION)

[o I l l I l L l Q l A D l 2 l@l 0 l0 l0 l- l0 l0 l0 l- l0 l0 l0 l@l4l1l1l1l1l@l l l@

7 8 9 LICENSEE CODE 14 15 LICENSE NUMBEH 2$ 26 LICENSE T4 PE JO bi wAI bd CON'T 7

O 1 8

[n"CIlL @l0l5l0l010l21615 @ll 2 lo !6 17 19 @l0l1l0l2I8 0l@

60 61 DOCKET NUY8ER 6d 63 EVENT DATE 14 15 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h o 2 l Prior to performing local leak rate test, procedure QTS-100-9, primary containment l g 3 g oxygen analyzer return isolation valve A0 2-8803 would not fully close. The redundany o 4 l primary containment isolation valve, A0 2-8804, did close properly and passed the i O s l local leak rate test with an as-found leak rate of 2.9 SCFH. Had a Group 11 l

[o lc ] l Isolation occurred, A0 2-8804 would have provided the proper and adequate O 7 l containment isolation. l 0 8 l I 7 8 9 80 SYSTEM CAUSE CAUSE COMP. VALVE CODE CODE SUSCODE COMPONENT CODE SUSCODE SUDCODE

[TTil l S l D l@ ]@ l Bl@ l V l A l L lV [ E lX l@ g@ l 0[@ Ju 7 8 9 10 11 12 13 18 19

,, SEOUE NTI AL CCCURRENCE REPORT REVISION LER RO EVENT YEAR REPORT NO. CODE TYPE N O.

O" art;g g 17 19 I l-l 10 12191 l/l 10 13 I I30 Li l- 10 1 21 22 23 24 26 27 28 23 31 J2 T KEN A T ON ON PL ANT v TH HOURS S e IT O FCR 8. S PLIE MAN lJJ B l@l s4 2 lg l3b Zlg lJ6 Zlg l 0] 0l 0 31 l

40 gg 41 lN l 42 lN l 43 lCl$FACdUREl$

44 l

47 l

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h giloll The cause of this occurrence was component failure due to binding of the valve j g i ;, j t stem and valve packing. The A0 2-8803 valve was removed, inspected, cleaned, and g gl repacked. The valve was functionally operated, closure timed, and local leak  ;

rate tested and was found to have a leak rate of 0.0 SCFH. l 11 14 1 I l 7 8 9 80 ST S  % POWER OTHER STATUS ISCO RY DISCOVERY DESCRIPTION y @ l0 0 l 0 l@l NA l l B l@[ Test l A TIVITY CO TENT aELEASEo OF RELEASE AYOUNT OF ACTIVITY LOCATION OF RELEASE NA NA 7

i e 8 9 lZl@ W @l 10 11 44 l l 45 80 l

PERSONNEL E XPOSURES NUVBER NA t 7 l 0l 0l 0l@lZ '

TYPE l

@lCESCRIPTICN **

l

' PERSONNe'tiNddiES NU 8ER cEScelPriONe 1747 104 7

i 8 9 l0[0l0l@l 11 12 NA 80 l

LOSS OF OR O AVAGE TO FACILITY TYPE CESCRIPTION y l Z l@l NA } ] ,5 ()

7 8 9 10 do Q lSUEf@DE 7 8 3 IS N [

10 CRfPTICN NA l 68 69 lllltlll lll [f

30. E

~

NAME OF PREPARER PHONE: