LER 79-085/01T-0:on 791024,while Performing Pipe Stress Reanalysis,Pipe Support Found Inoperable.Cause Not Stated. Support Will Be Upgraded to Accept Increased Loading Resulting from SHOCK-III Analysis
ML19254F453
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 11/06/1979
From: W. Verne Childs
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19254F452 List:
References
LER-79-085-01T, LER-79-85-1T, NUDOCS 7911090460
Download: ML19254F453 (2)


Text

Jbo U.b.NUG LAH HtGULAEUHY COMMidSIUN

.i7 77) .

4 LICENSEE EVENT REPORT CONTROL BLOCK: l 1

l l l l l lh 6

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 10111 I N ILICENSEE v l a l COOEA l r l i14l@l15n I n I IninInInl_ n i n i n26l@l26 u l LICENSEi l i iTYPE l iJOl@l57 CAT I l@

7 8 9 LICENSE NUMBER 68 CON'T 41719 l@li li 01617 M@

7 O tj 8

SM ILl@l 60 015101010131313l@li1012 61 DOCKET NUMBER 68 69 EVENT OATE 74 75 REPORT DATE 80

~ EVENT DESCRIPTION AND PRO 8ABLE CONSEQUENCES h M2l l SEE ATTACHMENT l 10131I l o 4 1 l O s l I 10161l l O 7 I I O a 1 J SYSTEM CAUSE CAUSE COMP. VALVE COOE CODE SUBCODE COMPONENT COCE SUBCODE SU8 CODE 7

O 9 8

l AI Blh Wh Wh lS lU l Pl Ol Rl Tlh Wh W h 9 10 11 12 13 18 19 20

_ SEQUENTIAL OCCURRENCE REPORT REVISION LER RO EVENT YE AR REPORT NO. CODE TYPE N O.

@ ,au t= 17 19 I l-I IO 8U I-l 101ii IT l-! LO_J

_ 21 22 23 24 26 27 28 29 30 31 32 KE ACTO ON PL NT MET HOURS S B IT D FOR d B. SUPPLIE MANUFACTURER I33X l@l34 F l@ W@ [Z_jh Z l0 l0 37 01 Ol (_Y_j @ Nlh Alh S I 4 l 2 l 047 Ik 35 36 40 41 42 43 44 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS 27 i O I SEE ATTACHMENT l li lil I l li 171 I lilal l l 11 14 1 l I 7 8 9 80 ST 3  % POWER OTHER STATUS OISCOV RY DISCOVERY DESCRIPTION li i s* I LtJ@ li' 10 10l@l" NA I lo_J@l ARCHITECT ENGINEER I

edrivirY COOrENT RELE ASED OF RELC ASE AMOUNT OF ACTIVITY LOCATION OF RELE ASE i 6 h (g_j @ l NA l l NA I J 8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION i 7 1010 0l@lZl@l NA l PERSONNE L INJURIES '7 n 7 NovBER DESCRIPTION f 173 l1 la8l Sl O l 0 l 0 lhl 7 11 12 NA 80 l

LOSS OF OR OAMAGE TO FACILtTY TYPE DESCRIPTION LLLJ8 9LzJ@l10 7

NA 80 l

2 o [3 ISSU]E l @Na DESCRIPTION 1 i liIIIlIlIIIJ, F 8 9 IO 68 69 80 5 NAME OF PREPARER W. Verne'Chiids 7 911090kO pgoy,; (315) 342-3840

a e

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET N0. 50-333 ATTACHMENT TO LER 79-085/01T-0 Page 1 of 1 The Architect-Engineer informed the plant staff that as the result of the Pipe Stress Reanalysis Program, pipe support BFSK-658(H-2) was inoperable. Following the guidelines of the 14 August 1979 letter lifting the Show Cause Order, an analysis has been performed by the Architect-Engineer which demonstrates that the effected system (Fire Protection) remains operable following a Design Basis Earthquake, with this support removed. This support will be upgraded to accept the increased loading resulting from the Shock III analysis as part of our continuing program to correct pipe support deficiencies.

Because the system remains operable, this event is not considered to be a significant hazard to the public health and safety.

A follow up report will be submitted when modification of the support is completed.

M 7 174 p