IE Insp Repts 50-413/79-12 & 50-414/79-12 on 790618-21. Noncompliance Noted:Failure to Follow QA Program Procedure P-1, Receiving Insp
ML19254B356
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/11/1979
From: Conlon T, Hardwick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19254B347 List:
References
50-413-79-12, 50-414-79-12, NUDOCS 7909270364
Download: ML19254B356 (5)


See also: IR 05000413/1979012

Text

.

'o

UNITED STATES

! " , 7,

E

NUCLEAR REGULATORY COMMISSION

g

g

' - ' . . ' . t

REGION 11

[f

101 MARIETTA sT., N.W., SUITE 3100

o,

ATLANTA, G EORGI A 30303

%,'

.....

.

Report Nos. 50-413/79-12 and 50-414/79-12

Licensee: Duke Power Company

422 South Church Street

.

Charlotte, North Carolina

28242

Facility Name:

Catawba Nuclear Plant, Units 1 and 2

Docket Nos. 50-413, 50-414

License Nos. CPPR-116, CPPR-117

Inspection at:

Catawba Site near Rockhill, South Carolina

Inspector:

)

ddb

7////79

R. J. N rdwick, Jr.

8

'Date Signed

Approved by

7 -// ' IT

T. E. Gonlon, Section Chief

Date Signed

SUMMARY

Inspection on June 18-21, 1979

Areas Inspected

This routine unannounced inspection involved 25 inspector-hours onsite in the

areas of safety-related 125VDC battery storage and maintenance QC records;

safety-related motor-operated valve electrical control circuits; and safety-

related power cable installation and QC records.

Results

Of the three areas inspected, no apparent items of noncompliance or deviations

were identified in two areas; one apparent item of noncompliance was found in

one area (Deficiency 413/79-12-02 and 414/79-12-02, Failure to follow Quality

Assurance Program Procedure P-1, " Receiving Inspection").

7009270%4,

1046 242

.

.

-2-

DETAILS

-

1.

Persons Contacted

Licensee Employees

.

J. R. Wells, Corporate QA Manager

W.O. Henry, QA Manager, Construction Division

D. G. Beam, Project Manager

  • D. L. Freeze, Project Engineer
  • R. A. Morgan, Senior QA Engineer

J. W. Rowell, Constructior .iectrical #ngineer

  • H. D. Mason, QA Engineer

R. A. Pace, Design Engineer

R. P. Thurow, Start-up Engineer

T. C. Roberts, QA Supervisor

  • M. R. Bove, Associate QA Engineer

P. M. McBride, Technical Specialist

C. E. Cross, QA Specialist

  • Attended exit interview

2.

Exit Interview

The inspection scope and findings were summarized on June 21, 1979, with

those persons indicated in Paragraph I above.

3

Licensee Action on Previous Findings

Not inspected

4.

Unresolved Items

Unresolved items are matters about which more information is required to

determine whether they are acceptable or may involve noncompliance or

deviations.

New unresolved items identified during this inspection are

discussed in Paragraph 8.

5.

Licensee Identified Items (50.55(e))

(0 pen) Licensee Identified Item 413/79-12-01 and 414/79-12-01:

Control

Panel Weld Deficiencies.

Cracks have bean identified in welds of bracing

in the prefabricated control panel. The licensee and vendor are developing

new weld designs and procedures for repairing the cracked welds.

Seismic

analysis and model testing will be performed by Wylie Laboratory af ter

completion of the weld repairs.

1046

243 ~

.

-3-

.

6.

Independent Inspection

The inspector selected the electrical control circuits for containment

isolation valve numbers IKC 320A of the component cooling system and

INC 056B of the pressurizer relief tank spray system for review. The

circuit interface between the valve's operating circuit components and

tile status monitoring circuit components was examined in detailed.

Storage, maintenance, and receipt inspection QC records for safety-related

125V DC battery number 1 EBB were reviewed.

The QC records were examined

to assure that they were complete, legible and retrievable.

Within the areas examined, there were no items of noncompliance or devia-

tions identified.

7.

Electrical (Cables and Terminations I) - Observation of Work and Work

Activities

The inspector selected the ten power cables listed below for examination:

1*EPL 501

1*RN668

1*EPE 529

1*EPE 501

1*EPE 530

1*EPC 526

1*RN 501

1*EPC 525

1*RN 669

1*EPC 524

Cable storage, handling, identification, and use of specified material

were in accordance with Quality Assurance Program (QAP) Procedure P-1,

" Receiving Inspection".

Cable size, type, location, routing and pulling

were in accordance with QAP Procedure M-40, " Electrical Cabl.e Installation

and Inspection".

Within the areas examined, there were no items of noncompliance or deviations

identified.

8.

Electrical (Cables and Terminations I) - Review of Quality Records

The QC records for the power cables listed in paragraph 7 were examined

in the areas of receipt inspection, material certification, and instal-

lation.

A review of vendor certification records for cables 1*RN668 and 1*RN 669

revealed that Duke Power Company's (DFC) Form 930.1, " Vendor QA Certifica-

tion" required to be filled in by the vendor for each cable reel contained

The forms (930.1) specified conformance to DPC specification

an error.

CNS 1354.01-00-0003, " Single conductor and multi-conductor 2KV Power

Cable", instead of DPC specification CNS 1354.01-00-0001, "15 & 8 KV

'

1046 2H

.

-

s,

'

-4-

Power Cable Multi-Conductor".

Further examination of QC records for

other cable reels purchased per the same purchase requisition number

(8337-1354.01-00-0014) revealed that the Form 930.1 for nine cable reels

contained the same specification error. This er.or was not detected by

the project QA staff during review and acceptance of vendor records per

Quality Assurance Program (QAP) Procedure P-1, " Receiving Inspection".

THe "QA Records Acceptable" block on the Form P-1A's, " Receiving Inspection

Report", documenting receipt inspection of the nine cable reels had been

signed by the project QA staff personnel on May 22, 1979.

Additionally, the inspector noted the "QA Records Acceptable" block on

another Form P-1A for five cable reels purchased per the same purchase

requisition number (8337-1354.01-00-0014) was signed by a site QA engineer.

QAP Procedure P-1 requires this block to be signed by the project QA

staff.

The licensee informed the inspector that the QA engineer's signature was

a co-signature for the QA records acceptance block.

This co-signature

allowed the site QA engineer to release the cable for issue.

The licensee

also stated that the co-signature is not recognized by tae present QAP

Procedure P-1, but that a proposed revision to the procedure which is

presently being reviewed would eliminate the need for a co-signature.

The two examples listed above are indications that the instructions of

QAP Procedure P-1 are not being followed.

This is a deficiency and is

identified as items 413/79-12-02 and 414/79-12-02; Failure to follow

Quality Assurance Program Procedure P-1, " Receiving Inspection".

The inspector reviewed the vendor supplied cable test reports in

conjunction with DPC Spec. CNS-1354.01-00-0001 to assure the required

cable certification tests had been performed.

During discussions with

the licensee, the question of what cable certification tests were

applicable to each type of cable listed in the specification was raised.

The licensee agreed to review the specification and provide additional

inf ormation.This item will be identified as unresolved item 413/79-12-03

and 414/79-12-03; Engineer Specification requirements for vendor certifi-

cation test.