05000333/LER-1979-073-03, /03L-0:on 790914,while Conducting Operations Surveillance Test,Emergency Diesel Generator C Tripped on Overspeed During Engine Start Sequence.Caused by Loose Connection in Overspeed Limit Switch.Repair Made

From kanterella
(Redirected from ML19253B573)
Jump to navigation Jump to search
/03L-0:on 790914,while Conducting Operations Surveillance Test,Emergency Diesel Generator C Tripped on Overspeed During Engine Start Sequence.Caused by Loose Connection in Overspeed Limit Switch.Repair Made
ML19253B573
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/12/1979
From: W. Verne Childs
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19253B571 List:
References
LER-79-073-03L, LER-79-73-3L, NUDOCS 7910160425
Download: ML19253B573 (2)


LER-1979-073, /03L-0:on 790914,while Conducting Operations Surveillance Test,Emergency Diesel Generator C Tripped on Overspeed During Engine Start Sequence.Caused by Loose Connection in Overspeed Limit Switch.Repair Made
Event date:
Report date:
3331979073R03 - NRC Website

text

,

v. a...vt. Lean n euuLM UH Y COMMinlON t1771 LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

l0 l t l lN lY lJ l A lF l1 lgl0 l0 l -l 0l 0l 0l 0l -l 0 0 l O gl 4 l 1 l 1 l 1 l 1 gl l

lg 7

8 9 LICENSEE COOE 14 15 LICENSE NuYuEH 26 LICENSE TYPE JO 57 CAT 58 CON'T sy l L Jgl0 l 5 l0 l0 0l3l3l3lg[0 [9 l 1 l 4l 7 l 9 lgl1 l0 l 1; 2 7 l 9 lg a

O i

1 8

60 63 OOCK ET NUVBER 6d 6'J EVENT OATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h o

2 l Please See Attachment O

3 l

d 10141 1 1

O s l

_j 1016i !

l O

7 l

l O

e I

l 7

8 9 80 LYSTEM

CAUSE

C4USE COY P.

VALVE CODE CODE SURCODE COYPONENT CODE SU8 CODE SU CODE l E l E l@ lE l@ ]@ l ll Nl Sl Tl Rl U jg gg g g O

9 7

8 9

10 11 12 13 18 19 20 SEQUE NTI AL OCCURAENCE REPORT RE VISION GVENT YEAR R EPORT NO.

CODE TYPE NO LER RO Oag 7l 91

[--j l 01 7l 3l [f_j l0l3l O

[.--J l 6l y

_ 23 22 23 24 26 27 28 23 30 31 32 TAKEf A T OP ON PL NT 1 T HOURS SB IT FOR 5 8.

SU PkIElgl B liAC3 l $

MA l E l@l Z l@

l Zl@

y@

l0 l0 0l 0l lYlg lNlg l

33 34 35 36 31 40 el 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS i

O

]

Please See Attachment I

li lil l I

i 2

l l

li131

.l t

4 l

[

7 8 9 80 STA S

  • . POWE R OTHER STATUS ISCOV RY DISCOVERY 0ESCRIPTION [E_j@ l015l1l@l NA l ] @l Surveillance Test i

s ACTIVITY CONTENT RELE ASED OF RELE ASE AVOUNT OF ACTIVITY LOCATION OF RELEASE RGl Lz_1 @ Lz_J@l NA l

l NA l

7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUVRER TYPE @l DESCRIPTION 10101 Ol@lZ I

A l

i i

PERSONNE L INJURIES DESCRIPTION @

NuvBER l01olOl@l NA l

i a

7 8 9 11 12 80 LOSS OF OR DAYAGE TO FACILITY 43 I 1 }I A'}

1 [ j~/

TYPE D E SC RIP TION l

l lJ li l o l lZ l@l NA l

7 8 9 10 80 PUB LiCi

@0ESCRIPTION @

T 910160 + 2 5

/

NRc use ONov l

NA l

llllllllll llg g

7 8 9 10 68 69 80 &

W. Verne Childs 315-342-3840 o

NAME OF PREPARER PHONE:

POWER AUTHORITY OF THE STATE OF NEW YORK J AMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333 ATTACHMENT TO LER 79-073/03L-0 Page 1 of I

During normal operation while conducting Operatior.s Surveillance Test F-ST-9B titled "EDG Full Load Test (ISI)" to satisfy the requirements of Technical Specifications Appendix A, Paragraph 4.9.B.1, Emergency Diesel Generator "C" tripped on overspeed during the engine start sequence.

The redundant Emergency Diesel Generators and off-site power systems were veri fied operable as required by Technical Specifications Appendix A, Paragraph 4.9.B.5 and 6.

Therefore, the event did not represent any signi ficant hazard to the public health and safety.

Investigation revealed that the overspeed limi t swi tch had a loose connection which resulted in the initiation of the overspeed trip due to normal engine vibration. No actual overspeed condition existed.

Repai r of the loose connection was completed and an overspeed test was conducted to verify proper operation and setting of the overspeed protection devices.

Following this work, Emergency Diesel Generator "C" was verified operable by satisfactory completion of F ST-9B and the of f-si te and on-si te AC power systems were restored to the normal stand-by line up on the followiog day.