05000289/LER-1979-016-01, /01T-0:on 791001,error in Seismic Analysis for ladder-type Support for Water Piping May Have Resulted in Exceeding of code-allowable Stresses.Caused by Error in Design Drawings.Engineering Evaluation in Progress

From kanterella
(Redirected from ML19250C007)
Jump to navigation Jump to search
/01T-0:on 791001,error in Seismic Analysis for ladder-type Support for Water Piping May Have Resulted in Exceeding of code-allowable Stresses.Caused by Error in Design Drawings.Engineering Evaluation in Progress
ML19250C007
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/19/1979
From: Mitchell D
METROPOLITAN EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19250C002 List:
References
LER-79-016-01T, LER-79-16-1T, NUDOCS 7911060385
Download: ML19250C007 (2)


LER-1979-016, /01T-0:on 791001,error in Seismic Analysis for ladder-type Support for Water Piping May Have Resulted in Exceeding of code-allowable Stresses.Caused by Error in Design Drawings.Engineering Evaluation in Progress
Event date:
Report date:
2891979016R01 - NRC Website

text