05000254/LER-1979-028-03, /03L-0:on 790924,during Monthly Procedure Qos 1100-1,required 1,275 Psig Discharge Pressure Could Not Be Achieved on Subsys A.Caused by Setpoint Drift on RV-1-1105A.Valve Replaced & Subsys Returned to Svc

From kanterella
(Redirected from ML19250B829)
Jump to navigation Jump to search
/03L-0:on 790924,during Monthly Procedure Qos 1100-1,required 1,275 Psig Discharge Pressure Could Not Be Achieved on Subsys A.Caused by Setpoint Drift on RV-1-1105A.Valve Replaced & Subsys Returned to Svc
ML19250B829
Person / Time
Site: Quad Cities 
Issue date: 10/16/1979
From: Wykoff D
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19250B827 List:
References
LER-79-028-03L-01, LER-79-28-3L-1, NUDOCS 7911050282
Download: ML19250B829 (2)


LER-1979-028, /03L-0:on 790924,during Monthly Procedure Qos 1100-1,required 1,275 Psig Discharge Pressure Could Not Be Achieved on Subsys A.Caused by Setpoint Drift on RV-1-1105A.Valve Replaced & Subsys Returned to Svc
Event date:
Report date:
2541979028R03 - NRC Website

text