05000321/LER-1979-045-03, /03L-0 on 790624:during Test,Relief Valve Lifted at 1200 Psig.Caused by Valve Corrosion.Valve Disassembled, Cleaned & Reset to Relieve at 1380 Psig

From kanterella
(Redirected from ML19246C141)
Jump to navigation Jump to search
/03L-0 on 790624:during Test,Relief Valve Lifted at 1200 Psig.Caused by Valve Corrosion.Valve Disassembled, Cleaned & Reset to Relieve at 1380 Psig
ML19246C141
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/12/1979
From:
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19246C138 List:
References
LER-79-045-03L, LER-79-45-3L, NUDOCS 7907230541
Download: ML19246C141 (1)


LER-1979-045, /03L-0 on 790624:during Test,Relief Valve Lifted at 1200 Psig.Caused by Valve Corrosion.Valve Disassembled, Cleaned & Reset to Relieve at 1380 Psig
Event date:
Report date:
3211979045R03 - NRC Website

text