LER 79-032/01T-0:on 791026,piping Restraints 1/2-7504-164 & 165 Had Safety Factor of Less than Two.Standby Gas Treatment Sys a & B Declared Inoperable.Caused by Improper Design of Safety Factors.Restraints Modified
ML19210C666
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 11/06/1979
From: Swales J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19210C662 List:
References
LER-79-032-01T, LER-79-32-1T, NUDOCS 7911190409
Download: ML19210C666 (2)


Text

NACTORM L6 U. S. NUCLE AR REGUL ATORY Cc.'? E5!G*4 (7 77)

. LICENSEE EVENT REPORT CONTROL BLOClO l l l l l !PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) o 0 lI lL LICE lQ4SEE lACCOE ID l1 l@l010 7

1 8 3 14 IS lLICEN:iE 0 l 0 %VSER l 0 l - l 0 l 0 l 025l@l264 1l 1l 11 1l@l57 G Al T 53l@

LICEME Tv PE JJ CON'T o i

[C"y l L l@l 0l 5 [ 0 [ 0 l 0 l 2 [.5 l 4 l@l 1 l o l 2 l6 l 71 91@l 1 l 1 l 0l 61 7 l 9 @

7 8 60 61 DOCKET NUYSER 63 69 EV ENT DATE 74 75 REPORT DATE 6J EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h a  : I While evaluating piping restraints in accordance with NRC IE Bulletin 79-02, Standby o 3 l Gas Treatment Systems A and B were declared inoperable at 3:00 PM on October 26, 1979.l o , ; Analyses indicated that piping restraints 1/2-7504-164 and 165 had a safety factor Ols f less than 2. The Standby Gas Treatment Systems were at all times functional and l o g  ; the requirements of Technical Specification 3.7.B.I.b were met.

0 7 l l 0 d l l 7 8 9 80 SYSTEM CAUSE CAUSE COMP. VALyg CODE CODE SUSCODE ' COMPONENT CODE SUSCOOE SUSCOCE

  • 7 o 9 8 9 lS lC l@ l B l@ [ A l@ l Sl Uj P[ O j Rl Tl@ l B l@ { @

10 11 12 13 13 19 20

,,_ S E QUENTI AL OCCURAENCE REPORT REVISICN LER RO EVENT YE AR REPORT NO. COOE TYPE N O.

O aiPcy;y 1719l l- l 0 13 l 2 l l/l l0l1l l Tl l-l l0 l

,21 22 23 24 26 27 28 23 30 31 32 EN AC ON O PLANT YET WOURS 22 S 8 iT D POR 8. S LIE VANUFAC QEa l Flggg l5Zlg J3 J4 3

[Ilg 37 0 l0 l0 lU l [Ylg [Njg lAlg lGl2[5l5l@

36 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h ilo l Reevaluation of the design of restraints 1/2-7504-164 and 165 found the desion I i i i safety factors to be less conservative than oriqinally analyzed. TWe restraints were

, 7 l modifled to a safety factor of greater than 4. and at 6:51 AM, October 27. 1979, I y[ the Standby Gas Treatment systems were declared operable. I i 4 l l 7 8 9 80 STA S N POWER OTHER STATUS ISCO RY DISCOVERY DESCRIPTION t s l E l@ l 0 l 9 l 8 l@l NA l lDl@l External Source l ACTivt TV CONTENT RELEASED OFHELEASE AVOUNT OF ACTIVITY LOCAT60N OF OELEASE 1 6 8 9

@ l Z lgl 10 NA l l NA l 7 tt 44 45 30 PE RSONNE L E XPO*,L R ES NUVSER TYPE DESCRIPTION NA l 0 l 0 l0 l@l Zl@l 1 7 l

FERSONNELINJU IES 7

i ,

e 9 l 0 l b$0 l@lu ,

NA Mh

[j gggg Wjuujc_aw A-f e

l LCSS CF OR GAVACE TO FACILITY Tvpf CESCRl8 TION i ,

lZlg[ NA l

F d 9 10 ,;0

, '*"SlSCmPT;O,@ 791119 0t i N AC USE ONLY ,

NA I T 1g dss E81 l l l l 1 l l l l l l ; ; j -;

I ) *a 66 o) si' s J. Swales 309-654-2241 ext. 171 N t.'c or me p A n g n _ PHONE. -

1. LER NUMBER: LER/R0 79-32/0lT-0 ll. LICENSEE NAME: Commonwealth Edison Company Quad-Cities Nuclear Power Station Ill. FACILITY NAME: Unit One IV. DOCKET NUMBER: 050-254 V. EVENT DESCRIPTION:

While inspecting piping restraints in accordance with NRC IE Bulletin 79-02, Standby Gas Treatment Systems (SBGTS) A and B were declared inoperable at 3:00 PM, October 26, 1979 Analyses indicated that piping restraints 1/2-7504-164 and 165 had a safety factor of less than 2. A complete failure of these restraints during a seismic event would have resulted in the stress in pipe 1/2-7504-24" exceeding 1/2 of the ultimate stress. Restraint 1/2-7504-164 had been repaired before the SBGTS were declared inoperable and repairs had also begun on restraint 1/2-7504-165 At the time the SBGTS were declared inoperable, both units were governed by the Technical Specification 3 7.B.I.b. limiting condition for operation.

VI. PROBABLE CONSEQUENCES OF THE OCCURRENCE:

All piping and equipment on the SBGTS were operable at the time of this occurrence. In addition, primary and secondary containment were in effect. Restraints 1/2-7504-164 and 165 did have a factor of safety greater than 1 and therefore should not have failed in the event of a design basis earthquake.

Therefore safe plant operation was not affected by this occurrence.

Vll. CAUSE:

The cause of this occurrence was a design deficiency. Analyses of restraints 1/2-7504-164 and 165 in accordance with NRC IE Bulletin 70-02, found the design factor of safety to be less conservative than originally analyzed.

Vill. CORRECTIVE ACTION:

Restraints 1/2-7504-164 and 165 were modified such that their factors of safety were greater than 4 by 6:51 AM, October 27, 1979 At this time the SBGTS were declared operable.