05000333/LER-1979-086-01, /01T-0:on 791025,A/E Advised That Six Supports Were Inoperable as Result of Pipe Stress Reanalysis Against Criteria in Lifting 790313 Show Cause Order.Cause Not Stated.Supports Upgraded

From kanterella
(Redirected from ML19210C126)
Jump to navigation Jump to search
/01T-0:on 791025,A/E Advised That Six Supports Were Inoperable as Result of Pipe Stress Reanalysis Against Criteria in Lifting 790313 Show Cause Order.Cause Not Stated.Supports Upgraded
ML19210C126
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 11/07/1979
From: W. Verne Childs
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19210C125 List:
References
LER-79-086-01T, LER-79-86-1T, NUDOCS 7911130310
Download: ML19210C126 (2)


LER-1979-086, /01T-0:on 791025,A/E Advised That Six Supports Were Inoperable as Result of Pipe Stress Reanalysis Against Criteria in Lifting 790313 Show Cause Order.Cause Not Stated.Supports Upgraded
Event date:
Report date:
3331979086R01 - NRC Website

text

NHC FOHM Jw v. s. nucLhaH H tta LAs HY cu idd i (T 11)

LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l

lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 O

i NlYlJlAlFl 1 l@! 0 l 0 l - l 010 l 0 l 0 l - l 0 l 0 l 0 l@d l 1 ll l1 l1 l@l l

l@

O i 7

8 9 LICENSEE CODE 14 IS L ICENSE Nur.18ER 25 26 LICENSE TYPE JO

$ 1 L A T 68 CON'T I_O._LLI

"'I;R C l L l@l 01510 l 0 l 0 l 313 l 3 l@l 1 l 0 l 2 I 5 7 l 9 @! Il 1 lnI7l7 l9 l@

S 7

8 60 61 DOCKET NUMBER (4

t:9 EVENT DATE 74 M

REPORT DATE 80 EVENT DESCRIPTION AND PROBA8LE CONSEQUENCES h o

2 l

SEE ATTACHMENT l

10131 l l

O 4

l l

0 s l I

101611 I

o 7

l l

o a

l I

80 7

8 9 ODE CODE SUBCODE COMPONENT CODE SUBC DE S

E lSlHl@ 'lBlh lClh S lU lP l0 lR lT lh Wh Wh O

9 7

8 9

10 11 12 13 18 19 20 SEQUENTI AL OCCURRENCE REPORT REVISION LER RO EVENT YE AR REPORT NO.

CODE TYPE NO.

@,ag,g,a; I 71 9l l-l l 0l 8l 6l l/l l0l1l [T_]

l-l i0l

_ 28 22 23 24 26 27 28 N

30 31 32 TAKER A T ON ON PLANT 1E T HOURS S B IT ED FOR 5 B.

SUPPLIE MANUFA TURER l X l@l F l@

l Z l@

lZ l@

l0 l0 0 l0 l W@

Nl@

W@

lS 4l2 0l@

33 34 35 36 3/

40 41 42 43 44 47 CAUSE OESCRIPTION AND CORRECTIVE ACTIONS i

O l

SEE ATTACHMENT

.J i i l

l l i 171 l I i 131 l

_.l l i 14 I [

__ l 7

a 9 80

. POWER OTHER STATUS DISCOV RY DISCOVERY DESCRIPTION ST S

W@ l1 l0 0 l@l NA l

lD l@l ARCHITECT ENGINEER

_j i 5 AC rivi TV CO TENT RELE ASED OF RE LE ASE AYOUNT OF ACTIVITY LOCATION OF RELEASE NA l

l NA l

['iTil W @ O@l 7

8 9 10 11 44 45 80 PERSONNil E X POSUR ES NUVSER TYPE

DESCRIPTION

l0l0l0l@lZl@l NA j

i 7

PtRSONNE L iN;u' dies DESCniP r10Nh NoveER NA l

lolo10l@l i a l}

80 7

8 9 11 12 LOSS OF OH DAMAGE TO FACILITY Q TYPE

DESCRIPTION

v W @l NA l

i 9 7

8 9 10 g

80 [Qo_J bSUE @DESCRIPTIONO79111303(/

~ P c "s < ~ -

l NA l

l l l l l l l 1 l 1 l l l :*g IS s

7 8 9 10 68 69 80 V. V. Childs (315) 342-3840

{

NAME OF PREPAPER PHONE:

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333 ATTACHMENT TO LET 79-086/01T-0 Page 1 of 1 The Architect-Engineer notified the Plant Staff that as the result of the Pipe Stress Reanalysis, six supports were inoperable when considered against the criteria of the 14 August 1979 letter lifting the Show Cause Order of 13 March 1979.

One of these supports, H66-62, on the Standby Gas Treatment System, because of its presence, caused system overstress. This support has been removed. The Standby Gas Treatment is now considered fully operable. The other five supports listed below are on the common return line from services components to the lake.

Since the cooling water has served its function prior to reaching the affected piping, the RHR Service Water, Service Water, and Emergency Service Water Systems are considered operable. Based upon preliminary load information, H46-1, H46-2, and H46-3 were upgraded, and are now fully acceptable.

Based upon preliminary loads, H46-267A (new) has been installed which relieves the stresses on H46-267A.

H46-267A is now fully acceptable.

Based upon preliminary load information, new support H10-175-new was installed and H10-175-existing upgraded.

This support system is now fully acceptable. A new support H10-177-new was installed to relieve the loading on H10-177-existing. With this new support installed, H10-177-existing is operable but will require further modification to be permanently acceptable. This further modification to H10-177-existing will be performed in conjunction with the continuing effort to correct the remaining program deficiencies.

All six (6) pipe supports were upgraded within the seven day time frame required by the August 14, 1979 letter and the event did not represent a significant hazard to the public health and safety.

When modifications are complete, a follow up report will be submitted.