05000266/LER-1979-014-03, /03L-0:on 790912,charging Pump 1-P2B Found to Have Cylinder Block Crack.Caused by Pressure Spiking During Compression Stroke Following Hydrogen Separation During Suction Stroke.Cracked Block Replaced

From kanterella
(Redirected from ML19209C419)
Jump to navigation Jump to search
/03L-0:on 790912,charging Pump 1-P2B Found to Have Cylinder Block Crack.Caused by Pressure Spiking During Compression Stroke Following Hydrogen Separation During Suction Stroke.Cracked Block Replaced
ML19209C419
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 09/26/1979
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19209C409 List:
References
LER-79-014-03L, LER-79-14-3L, NUDOCS 7910150546
Download: ML19209C419 (1)


LER-1979-014, /03L-0:on 790912,charging Pump 1-P2B Found to Have Cylinder Block Crack.Caused by Pressure Spiking During Compression Stroke Following Hydrogen Separation During Suction Stroke.Cracked Block Replaced
Event date:
Report date:
2661979014R03 - NRC Website

text

A.

NRC FORM 366 U. S. NUCLEAR REdULATORY COMMISSION (7 77)

LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l

lh (PLEASE PRtf4T OR TYPE ALL REOUIRED INFORMATION) i e

lWlIlP BlH 1l@l 0 l 0 l - l 0 l 0 l 0 l 0 l 0 l -

0] 0 l@l 4 1l 1l 1l 1l@l l

l@

o 1

F 8 9 LICENSEE CODE 14 15 LICENSE NUMBER 2h 26 LICENSE TYPE

.50 57 CA r 58 CON'T I L l@ 01 Sl 0] 0 l 0 ] 21 616 @l O l 9 11 2 7l 9 @l O l 9 l 2 l 6 l 7 l 9 @

"E" "'

O i

3O s;

?

4 60 61 DOCKET NUMBER 68 ti9 EVENT DATE 14

'S HEPORT DATE 80 EVENT DESCRIPTION AND PROBA8LE CONSEQUENCES h cyli W rl 10 2

10n 9-12-79 the 1-P2B charcinq oumo (1 of 3) was found to have a l block crack between the No. 2 cylinder and its suction port.

Althouah o

3 the limiting conditions were met, this constitutes an abnormal degra-O 4

o s I dation of a system designed to contain radioactive material o

e l(T.S. 15.6.9.2.B.4).

This event is similar to LER's 78-004/03L-0 and i

l78-007/03L-0.

Safety significance of this event was minimal.

J O

7 o

e I l

00 7

8 9 DE CODE SueCO E COMPON ENT CODE SU6 CODE S

E O ?j l P I C l@ [E_j@ W @ l P l U l M l P l X l X I@

E l@ ( Z_j @

7 8

9 10 tt 12 13 18 19

.'O SEQUENTI AL OCCURRENCE REPORT R EVIS'ON EVENT YE AR REPORT NO.

CODE TYPE N O.

@ LER POl7l9l l-l 01 11 4 l l/l l0l3l lLl l-l l_0J u'"S E 21 22 23 24 26 27 IS 29 30 J1 J2 T KN AC ON ON PL NT VE HOURS S8 iT FOR b 8.

SUPPLIE MANUFACTURER lAl@lFl@

l Z l@

lZl@

l0l0l0l0l

(_NJ @

l Yl@

(_N,j @

!Al1l5 Ol@

3J 34 35 34 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS lThe charging pump is a variable caoacity Aiax Iron Works Tv~ T-125. TheI i

O t eracked block was replaced with a new spare.

Pressure spiking durina thel i

i

compression stroke following hydrogen separation during the suction l

l stroke is suspected to have caused the cracking.

Installation of l

suction stabilizers is planned.

Discharge dampeners were installed 10 75 7

8 3 80 ST

% POWER OTHER STATUS dis O RY OtSCOVERY DESCRIPTION

[,E_J@ l 1 0 l 0l@l N/A l

l A l@l Observation of minor leakace l

i s

ACTWITY CO TENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCAff 0N OF RELEASE l Z l @ l Zl@l N/A l

N/A l

1 6

7 3 3 to it 44 45 30 PERSCNNEL EXPOSURES NUMBER TYPE O ESCRIPTION [1]_?J l 0 0 l 0 l@l Z l@l N/A PERSONNEL NJURIES aESCn > TION @

NUveeR l 0 l 0 l 0 l@l N/A 11AE i?7 l

1 3

S 9 11 12 1 1 7/

J

60 LOSS OF OR DAMAGE TO FACILITY YYPE

DESCRIPTION

l Z i@l N/A i

3 7

8 9

!O 60 ISSUE 7@DElCR PTiON@

7 91015 0.5 ft

(.N_J lN/A l

llll llll ll ll l; 2

o 7

8 9 10 68 69 30 5 414/277-2811 2,

C.

W.

Fav PHON E:

NAME OF PREPARER