ML19209C409

From kanterella
Jump to navigation Jump to search
Forwards LER 79-014/03L-0
Date released: 08/11/2019 Download: ML19209C409


LER 79-014/03L-0:on 790912,charging Pump 1-P2B Found to Have Cylinder Block Crack.Caused by Pressure Spiking During Compression Stroke Following Hydrogen Separation During Suction Stroke.Cracked Block Replaced
ML19209C419
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 09/26/1979
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19209C419 (1)
Forwards LER 79-014/03L-0
ML19209C408
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 09/26/1979
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19209C408 (1)