05000333/LER-1979-067-03, /03L-0:on 790908,required Differential Pressure Was Not Established within Specified Time Requirements of 22-h.Cause Not Given.Operations Personnel Were Counseled in Importance of Time Requirements in Completing Activities

From kanterella
(Redirected from ML19209B611)
Jump to navigation Jump to search
/03L-0:on 790908,required Differential Pressure Was Not Established within Specified Time Requirements of 22-h.Cause Not Given.Operations Personnel Were Counseled in Importance of Time Requirements in Completing Activities
ML19209B611
Person / Time
Site: FitzPatrick 
Issue date: 10/04/1979
From: W. Verne Childs
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19209B599 List:
References
LER-79-067-03L, LER-79-67-3L, NUDOCS 7910100222
Download: ML19209B611 (2)


LER-1979-067, /03L-0:on 790908,required Differential Pressure Was Not Established within Specified Time Requirements of 22-h.Cause Not Given.Operations Personnel Were Counseled in Importance of Time Requirements in Completing Activities
Event date:
Report date:
3331979067R03 - NRC Website

text

NHC POHM lbo U. b. NUCLc AH HEGul.A IOHY COMMlbSION (7 77)

LICENSEE EVENT REPORT TONTROL BLOCK: l l

l l

l l

lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

I ti l0 l0 l0 l@l4 l 1 l 1 l 1 l 1 l@l l

l@

l N l Y l J l A l F l 1 l@l 0 l0 l-l0 l0 0 l0 o i 7

8 9 LICENSEE CODE 14 15 LICENSE NuMBEH 25 26 LICENSE TYPE 30 5 7 C A T 58 CON'T 3{,c l L l@ 0 l 5 l 0 l 0 l0 l 3 l 3 l 3 l@l0 19 I 0 l 8l 7 l 9 l@l 110 l 0 I 4 I 7 l 9 l@

o i

7 8

60 61 DOCKET NUMB ER 68 63 EVENT DATE 14 75 REPORT DATE 80 EVENT DESCRIPTION AND PROB A8LE CONSEQUENCES h o

2 l Please See Attachment 1

oja 1 o

4 l

]

o s !

I I

o e

o 7

I I

o a i I

80 7

8 9 C DE CODE SUBCO E CCVPONENT CODE SUBC DE S

E o

9 lS lH @ lA l@ l Al@ l Z l Z Z l Z l Z l Z l@ lZ l@ W @

7 8

9 10 t1 12 13 18 13 20 SEQUENil AL OCCU R R E NCE REPORT REVISION

,,. EVENT YEAR REPORT NO.

CCDE TYPE N O.

@,a'ERAO l7 9l l-l l0l6l7l l/l l0 l3 l lL l l-l l 0l L

U gar

,,,,, 2 1 22 23 4+

26 27 28 29 30 31 32 TAKEf ACT O ON PL T

TET HOURS 22 SB IT D FOR B.

SUPPLIE MAN ACTURER jX lgl34Z jg l35 Z [g lZjg l0l0l0l

[

]g l Nlg lZl@

lZ [9 l9 [9 [g 33 36 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS i

o l Please See Attachment l

i i

l I

i12 I i

3 l

I i

4 i

l 7

8 9 80

, POWER OTHER STATUS IS OV RY DISCOVERY DESCRIPTION STA S i s lE @[0 2 3l@l NA l

[A[@l Operator Observation l

A TIVITY CO TENT RELE ASED OF RELE ASE AMOUNT OF ACTivlTY LOCATION OF RELEASE NA l

l NA l

l Z l @ l Z lgl i

6 7

8 9 10 11 44 45 80 PERSONNEL E XPOSURES NUMBER TYPE

DESCRIPTION

l 0 l 0 l 0 l@l Z l@l 1A j

i 7

2

,ERSONNE L,N;u'n,ES oESCniPTiON@

NuvBER l 0 l 0 l 0 lgl' NA l

i a

7 8 9 11 12 80

=

=PU '^ "" @

1126 083 NA l

l 119 ] l Z lgl

[(/

80 7

8 9 to 7910@ 0 1 }

j ESCRIMlON

'pE NA g

7 8 9 10 68 63 80 ;

NAYE OF PREPARER PHONE-

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333 ATTACHMENT TC ' ER 79-067/03L-0 Page 1

of 1

During normal operation following plant startup and while establishing the drywell to torus differential pressure required by Technical Specifications Appendi: A, Pa agraph 3.7.A.7.a, the required differential pressure was not established wi.51n the specified time requirements (wi thin twenty-four hours of placing the mode switch in the run position).

The establishnent af this differential pressure was completed wi thin twenty-four hours and fif teen minutes of placing the mode switch in the run position.

Thus the event did not represent any significant hazard to the public health and safety.

The Operations personnel were counseled in the importance of commencing evolutions of this type at a point in time which would allow completeness of the activity within the prescribed time l imi ta t ions.