05000333/LER-1979-061-03, /03L-0:on 790905,during HPCI Subsys Logic Functional Test,Switch 3 Associated W/Level Instrument 02-3-LIS-72D Did Not Properly Pick Up Follower Relay.Caused by Wiring Error During Installation of New Switch

From kanterella
(Redirected from ML19209B225)
Jump to navigation Jump to search
/03L-0:on 790905,during HPCI Subsys Logic Functional Test,Switch 3 Associated W/Level Instrument 02-3-LIS-72D Did Not Properly Pick Up Follower Relay.Caused by Wiring Error During Installation of New Switch
ML19209B225
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/03/1979
From: W. Verne Childs
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19209B224 List:
References
LER-79-061-03L, LER-79-61-3L, NUDOCS 7910090351
Download: ML19209B225 (2)


LER-1979-061, /03L-0:on 790905,during HPCI Subsys Logic Functional Test,Switch 3 Associated W/Level Instrument 02-3-LIS-72D Did Not Properly Pick Up Follower Relay.Caused by Wiring Error During Installation of New Switch
Event date:
Report date:
3331979061R03 - NRC Website

text

,,,,,,,,,,

u. s. WLat.Lt AH H tGULJ41 OH Y COMMISSION (7 77)

LICENSEE AVENT REPORT CONTROL BLOCK: l l

l l

l l

h (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) l Nl Yl J l Al F 1lgl0l0l- 0l0l0 0 l - l 0 [ 0 [ 0 lg 4 l 1 l 1 l 1 l 1 [g l lg O

i 7

8 9 LICENSEE CODE 14 15 LICENSE NUMBEH 25 26 LICENSE TYPE JO St CAT $8 CON'T lojij

,gOg lL lgl0 5 0l0l0l3l3l3]gl0l9 0 l5 [ / l9 gl l0 l0 3 l 7 l9 l@

R 7

8 60 61 COCKET NLv8ER 68 69 FiENT D ATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h o

2 1 Please See Attachment l

0 3 l l

0 4

l l

10Isl l

0 6

l l

0 7

l l

0 8

l l

7 8 9 80 SY STF '.1

CAUSE

CAUSE COYP.

VA LV E CODE CCOE SU8 CODE COYPONENT CODE SU8 CODE SUBCODE

((@ [ Dj@

B lg ll lN lS lT [R lU lQ ]g ]g o

9 7

8 9

10 11 12 13 18 19 20 SEQUENTI AL OCCU R R E NCE REPORT REVISION

_EVINT *"aR REPO TNO.

CODE T PE N

@ a'E R AOl7[

l l-1 0l l1l jfl l 0l 3l l }' l

[_J l.

L us"g r l

m21 22 23 24 26 27 29 29 30 31 32 TAKE A TO O PLANT T

HOURS 22 S 6YT FOR N @8.

O SUPP E MANUFACTURER I x ;g z lg

5zi@

LJO I

I I

I L _J @

l I

l l@

Ll 01 i l 33 34 3

36 3/

40 43 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS i

O l

Please See Attachment i

i i

I i

2 l

i 3

i l

11 141 I l

7 8 9 80

  • PCWE R STA 'S OTwEd STA TUS iSC HY DISC VERY DESCRIPTION Surve Ilance est C lg l 0l 0l 2 g l

l l

N i

s A TlVITY CON TE NT RetEASED OF RELE ASE AMOUNT OF ACTIVITY LOCATION OF RELEASE y @ l Zlgl NA l

NA

[

i 6

7 8 9 10 11 44 45 80 PtRSO%EL EXPOSURES NU'.9B E R TYPE

DESCRIPTION

] O l 0 l 0 l@l Z l@l t4

[

i 7

' nRSOma'imu'At$

l cEsCnieriON@

nu,eE R l0 0l0l@[

NA i

a 7

8 9 11 12 80 L OSS OF CR D A** AGE TO F ACILITY j j 4 4 r-TY9E DESCRtPTION I l l/I g

NA f

l s

7 8 9 10 80 ESCRiniONh 791009035/

'sgEf@l i

Illill fittil:;.

NA i

2

.0 7

a 9 10 68 69 80 &

W. Verne Childs 315-342-3840 o

NAME OF PREPARER PHONE:

POL'ER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT DCCKET NO. 50-333 ATTACHMENT TO LER 79-061/03L-0 Page 1

of I

During normal startup operations, while conducting F-ST-4E titled "HPCI Sub-system Logic Functional Test" to satisfy the requirements of Technical Specifications Appendix A, Table 3.2-2, i t was noted that Swi tch No. 3 associ-ated with level instrument 02-3-LIS-72D did not properly pick up i ts follower relay when the state of Switch No. 3 was changed as a part of F-ST-4E.

The other three switches (including the redundant channel) associated with the same parameter were verified operable therefore, the event did not represent any signi ficant hazard to the public health and safety.

Investigation revealed a wiring error had occurred during the installation of a new switch in June, 1979 When the new switch was installed its proper operat ion was veri fied utilizing F-ISP-3-2 ti tled " Reactor Low-Low / Low-Low-Low Water Level."

Review of F-ISP-3-2 revealed that the procedure did not require verification of proper switch actior by observation of the follower relay associ-ated with the switch.

The wi ring error w. s corrected and proper operation demonstrated on the following day.

To preclude events o'f this nature in the future, F-ISP-3-2 has been revised to requi re veri ficat ion of proper operation of the follower relay.

'1

/

j j 'i d

I i

'y-