05000321/LER-1979-063-03, /03L-0:on 790812,during Cold Shutdown,Rhr Svc Water Pumps Found Incapable of Delivering Rated Flow of 4000 Gpm at 384 Psi.Caused by Normal Wear on Impeller Wear Rings & Bushings.Pumps Rebuilt & Reinstalled

From kanterella
(Redirected from ML19207C055)
Jump to navigation Jump to search
/03L-0:on 790812,during Cold Shutdown,Rhr Svc Water Pumps Found Incapable of Delivering Rated Flow of 4000 Gpm at 384 Psi.Caused by Normal Wear on Impeller Wear Rings & Bushings.Pumps Rebuilt & Reinstalled
ML19207C055
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/17/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19207C050 List:
References
LER-79-063-03L, LER-79-63-3L, NUDOCS 7909060378
Download: ML19207C055 (2)


LER-1979-063, /03L-0:on 790812,during Cold Shutdown,Rhr Svc Water Pumps Found Incapable of Delivering Rated Flow of 4000 Gpm at 384 Psi.Caused by Normal Wear on Impeller Wear Rings & Bushings.Pumps Rebuilt & Reinstalled
Event date:
Report date:
3211979063R03 - NRC Website

text

77gg U.S. NUCLE AR REGUL ATORY COYMISSION

1 Ill LICENSEE EVENT REPORT cONTRot OLOcK: l l

l l

1 1

l@

(PLE ASE PRINT OR TYPE ALL REQUIRED INFORM ATION) 1 6

3 lC l A lE l1 lH l1 l@k! 0 l 0 l 010 l'O l 010 l 0 l 0 l 0 l@ 4 l1 l1 (t l1 l@l l

lg 9

LICEP.5E E COOE 14 13 LICEN5E NLYoEH 23 20 uCENSE T1PE d

$1 C AI td r

CC..

s[nc l L j@l0 l 5 l 010 l 013 l 2 l 1 ('7)l 0 l 8 l 1 1217 l 9 l@l018 13 ll l7 l9 j@

0 1

8 6J ml COMET NVYSEq Od 49 EV ENT OATE Ja b

FESC AT D ATE 60 EVENT DESCRIPTION AND PROB ASLE CONSECUE*fCES h ioi2 l

With the reactor in cold shutdown, while perf orming the IGR Service Water Pump j

3 3

j Cperability Test, the RHR Service Water Pumps were found incapable of delivering a j

1 rated flcu f rom each pump of 4000 GPM at 384 psi as required by Technical Specifi-l io 4

cation 4. 5.C. l.b. The pumps and f ailure dates are: Ell-C001B and Ell-C001D on j

60is ;

[ August 12,1979, E11-C001A on August 16, 1979, and Ell-COOID c:. August 20, 1979.

g io s

.ol7 l

Public health and safety were not af fected by this incident.

[

l 4018 l

sa 7

8 9 S Y ! T E *.9

CAUSE

C A USE C O *.1 P vatvg CCDE CGCE SUBCO E COvPCNENT CODE SL 6 0:O E SUSCCOE 10to LC lP j@ l E l@ l B l@ lP l Ul Ml Pi Xl KQ j B l@ g Q T

8 9

10 11 12 13 3E IJ 20 SECUENTI AL OCCUS*DCI p!7 CAT AEVISION ggo ao EVENT YE AR R E703.T N O-CODE TYPE PJ O,

@ NUE'SE a l7[9l l_j l0 l613 j l/l J0l3l lL l jl l0l S E ac = T 21 22 23 24

a 27 23 3

Oc 31 3;

ACTICN FUTumE EFFECT swuTDOWN ATT AC w;ENT

.7 A ;-a es tv E ;OYo.

COY 8CNENT TANEN ACTION ON PL ANT PA E T H OD HOURS..

Sg5YlTTip

-27 '.* 3 L !.

SL F D Lt E R VANUFA!!bnER IBj@lGl@

lCl@

lz j@

l 0 l01010 l lY l@

JY l@

lNl@

lJl110l5l@

u s,

a, 3.

sa

p!

nF s; pip f t;N,

l iil7 lolol0j9lZ St.

NA J.

v 90 B

J t1 13 d *** U{ #I%O Gl ?

PEutCN ELN.: E5 4I e, po i a O E ;;n.p f iCN NA l

iil-

[ 010 l 0 Ql sa a s ii i:

bb 7,

l 3.g T q' ~ ~ =~

TUS( b";;,Ud@a 73 !

19090607 75 i

LG}; 0F 07 O AY AGE TO F ACILITV u

nni i

m nn: un ~v I'l"I W @ :,%.,n. @

,,,'? " '

l l

[fI!l]Ill tlI(5 hA ce o9 sa ;

d >

m R. T. Nix 912-367-7781

{

N AME OE PD(P ADE R

,,,,g

s S upplement tv LER 50-321/1979-063 On August 12, 1979, with the reactor in cold sh6tdown, while performing the RER service water pump operability procedure (kip-1-3167), RHR service i

water pumps Ell-C001B' and Ell-C001D were f ound to be incapable of delivering a rated flow of 4000 gpa at 384 psi as required by Technical Specifications 4.5.C.I.b.

The Ell-C001B pump id a flew of 3000 gpm at 384 psi and the Ell-C001D pump had a flow of 3340 gpm at 380 psi.

Af ter the discharge flow indicators were checked to insure proper calibration, the

'B' and 'D' pumps were pulled for inspection. The impeller wear rings, pump casing wear rings, and pump bushings were found to be worn; also, a section of a-cloth ynn; f ound in the

'B' pump. Due to the a-cloth being in the 'B' pump, maderwater divers were brought in and the intake cleaned of all debris.

On August 16, 1979, while the 'B' and 'D' RHR service water pumps were being repaired, the 'A' RHR service water pump failed to pass rated flow.

The 'A' pump, Ell-COO LA, had a flow of 3900 gpm at 385 psi.

Four days later on August 20, 1979, the 'C' RHR service water pump failed to pass rated flow.

The 'C' pump had previously passed due to the flew indicator reading high by 200 gpm.

The flow f or Ell-C001C, af ter recalibrat'.g the flow indicator, was 4000 gpa at 360 psi.

After the

'B' and 'D' pumps were repaired, they were reinstalled and passed the rated flow at the required pressure. The 'B ' pump was plac ed back in service on August 20, 1979 and the 'D' punp placed back in service on Augsut 21, 1979.

RHR service water pumps ' A' and 'C' were then pulled for inspection.

The

'A' pump had worn wear rings and the 'C' pump had a bushi a turning in the housing.

Both pumps were rebuilt and reinstalled.

The pumps then passed rated flow at the correct pressure.

The 'A' and

'C' pumps were re turned to service on August 24, 1979.

1r. addition to the pumps being repaired and the flow indicators being recalibrated, the flow transmitter in each RHR service water loop had a bad.Soard and_was required to_be repaired.

Also, the RHR service water instrumentation located b1 the Control Room was changed to provide mere accurate readings.

There were no ef f ects to public health and saf ety as the un i was already in cold shutdown.

The actual operatin;; time for these pumps are 2253.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> en Ell-C001 A.

2754.25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> on Ell-C031B, 1347.25 heurs oa Ell-C001C, and 104.'.73 h mrs on Ell-COO L D.

The pumps are designed for a performance curve with no allowances given for wear with a rated flow of 4000 gpn at 384 psi at the present river level.

They punp raw river water.

prov'ide bet ter service A study will be made to determine what can be done to from these pumps.

A follow-up report will be submitted as soon as the study is completed.

~