|
---|
Category:Letter
MONTHYEARML23277A1692023-10-0404 October 2023 GE-Hitachi Nuclear Energy Americas, LLC, ABWR Design Certification Annual 10 CFR 50.46 Report for 2023 ML20269A1842020-09-25025 September 2020 ABWR Design Certification Annual 10 CFR 50.46 Report for 2020 ML20076D9632020-03-16016 March 2020 GE Hitachi Nuclear Energy, Transmittal of ABWR Standard Plant Design Certification Renewal Application Design Control Document Revision 7, Chapter 5 ML20129J8972019-10-31031 October 2019 ABWR DC Renewal Supplemental FSER Appendix E Report by Advisory Committee on Reactor Safeguards ML19171A2912019-06-27027 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 18b for Section 9.1.2.2 New and SFP Racks Seismic Structural Analysis ML19171A2932019-06-27027 June 2019 ABWR DC Renewal Issue 18b Section 9.1.2.2 New and SFP Racks Seismic Structural Analysis Rev 4 ML19164A0352019-06-20020 June 2019 Letter to Applicant - GEH ABWR DC Renewal Section 1 Introduction and General Discussion ML19162A0802019-06-19019 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 09 Section 6.2.1.9 ECCS Strainers ML19113A1732019-06-19019 June 2019 ABWR DC Renewal SER Section 3.2.3 Safety Classifications Pointer SER Rev 4 ML19114A3532019-06-19019 June 2019 ABWR DC Renewal SER Section 9.1.3 Fuel Pool Cooling and Cleanup System Pointer SER Rev 4 ML19148A4632019-06-19019 June 2019 ABWR DC Renewal Issue 26 SER for Section 16 Technical Specifications Revision 3 ML19148A7802019-06-19019 June 2019 ABWR DC Renewal Issue 26 Section 7.4.1.4.4 Shutdown Panel Inst Rev 4 ML19148A4612019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 16 Technical Specifications ML19155A2102019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 38 Section 6.3 Emergency Core Cooling Systems ML19156A1512019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 18a for Section 4.2 Rx LOCA and Seismic Load ML19156A1802019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 19 & 20 for Section 9.1.2.1 New and Spent Fuel Storage ML19141A3712019-06-0606 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SE for Section 22 Fukushima Design Related Changes ML19148A7782019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 7.4.1.4.4 Shutdown Panel ML19114A3382019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 7.5.2.1 Post Accident Monitoring Revision 0 ML19149A3152019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 8.3.4.4 Class 1E Bus Isolation ML19113A1762019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 3.2.3 Safety Classifications Revision 0 ML19148A5932019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 5.4.7.1.1.10 Aciwa ML19148A5152019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 5.4.7 Residual Heat Removal System ML19114A3512019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 9.1.3 Fuel Pool Cooling and Cleanup System Revision 0 ML19142A1862019-05-31031 May 2019 GE Hitachi Nuclear Energy U. S. Advanced Boiling Water Reactor Design Certification Renewal Schedule Letter, May 2019 ML18164A1092019-02-0404 February 2019 Letter to Applicant - GEH ABWR DC Renewal SE for Subsection 6.2.1 ML18234A4312019-02-0404 February 2019 Letter Safety Evaluation with No Open Items GEH ABWR DC Renewal Subsection 6.2.1.6 ML19002A3912019-01-15015 January 2019 Letter to Applicant - GEH ABWR DC Renewal SE for Subsections 8.2.5 and 8.3.3.17 ML19002A3932019-01-11011 January 2019 Memo to ACRS - GEH Advanced Boiling Water Reactor DC Renewal Safety Evaluation for Subsections 8.2.5 and 8.3.3.17 ML18346A5612018-12-19019 December 2018 Letter to Applicant - GEH ABWR DC Renewal Issue 10 SE for Section 5.4.8 ML18312A1632018-12-0404 December 2018 Letter to Applicant - ABWR DC Renewal Safety Evaluation, Section 19.1, Probabilistic Risk Assessment ML18312A1622018-12-0404 December 2018 Safety Evaluation - ABWR DC Renewal Safety Evaluation, Section 19.1, Probabilistic Risk Assessment ML18275A1772018-11-15015 November 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 19.5 ML18200A3192018-07-26026 July 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Subsection 3.7.3 ML18183A4322018-07-12012 July 2018 Advanced Boiling-Water Reactor Design Certification Renewal Application - Safety Evaluation with No Open Items for Section 9.1.4, Light Load Handling System ML18183A3712018-07-12012 July 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 9.1.1 ML18183A4172018-07-12012 July 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 9.1.5 ML18176A1442018-06-28028 June 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 13 ML18176A1432018-06-27027 June 2018 Memo to ACRS - GEH ABWR DC Renewal SE for Section 13.5 ML18155A2902018-06-13013 June 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 3.5.1.4 Missiles Generated by Natural Phenomena ML18155A2122018-06-13013 June 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 2.3 Meteorology ML18155A2352018-06-13013 June 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 3.3 Severe Wind and Extreme Wind (Tornado and Hurricane) Loadings ML18114A0362018-05-0202 May 2018 Letter - Advanced boiling-Water Reactor Design Certification Renewal Application Safety Evaluation with No Open Items for Section 5.2.5, Reactor Coolant Pressure Boundary Leakage Detection ML18088A2222018-04-10010 April 2018 Letter Safety Evaluation with No Open Items for Section 13.3, Emergency Planning. ML18059A3422018-03-0808 March 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 9.5.1 Final ML17097A4702018-02-0202 February 2018 GE Hitachi Nuclear Energy - U.S. Advanced Boiling-Water Reactor Design Certification Renewal Application, Closure of Design Items 14, 15, 16, 21, 24 and 25 ML18029A2602018-02-0101 February 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 12 ML16341A8122016-12-0606 December 2016 GE Hitachi Advanced Boiling Water Reactor Design Certification Renewal Application, Actions Regarding Resolution of Item #26; Fukushima Recommendation 4.2, Mitigating Strategies ML16299A1472016-10-25025 October 2016 GE-Hitachi Nuclear Energy - Supplement 1 to Proposed Resolution of Items #18b, 19 and 20 of NRC Suggested U.S. Advanced Boiling Water Reactor Design Changes ML19031C8512016-08-19019 August 2016 MFN-16-059 - Peak Cladding Temperature of GE Hitachi Nuclear Energy Advanced Boiling Water Reactor Design Certification Rule Renewal Application 2023-10-04
[Table view] Category:Memoranda
MONTHYEARML19171A2932019-06-27027 June 2019 ABWR DC Renewal Issue 18b Section 9.1.2.2 New and SFP Racks Seismic Structural Analysis Rev 4 ML19136A2812019-05-29029 May 2019 Regulatory Audit Results Summary Report for the Advanced Boiling-Water Reactor Design Certification Renewal Peak Cladding Temperature Increase ML18234A4322019-02-0404 February 2019 Memo SE with No Open Items GEH ABWR Subsection 6.2.1.6 ML18164A1102019-02-0404 February 2019 Memo - GEH ABWR DC Renewal SE for Subsection 6.2.1.3 ML18354B1672019-01-24024 January 2019 ABWR DC Renewal - ECCS Suction Strainer Design Audit Report ML19002A3932019-01-11011 January 2019 Memo to ACRS - GEH Advanced Boiling Water Reactor DC Renewal Safety Evaluation for Subsections 8.2.5 and 8.3.3.17 ML18312A1642018-12-0404 December 2018 Memo - GEH ABWR DC Renewal Safety Evaluation for Section 19.1, Probabilistic Risk Assessment ML18312A1622018-12-0404 December 2018 Safety Evaluation - ABWR DC Renewal Safety Evaluation, Section 19.1, Probabilistic Risk Assessment ML18312A1632018-12-0404 December 2018 Letter to Applicant - ABWR DC Renewal Safety Evaluation, Section 19.1, Probabilistic Risk Assessment ML18200A3202018-07-26026 July 2018 Memo to ACRS - GEH ABWR DC Renewal SE for Subsection 3.7.3 ML18199A2732018-07-25025 July 2018 GEH ABWR DC Renewal Audit Plan - PCT Increase ML18176A1432018-06-27027 June 2018 Memo to ACRS - GEH ABWR DC Renewal SE for Section 13.5 ML18157A2152018-06-11011 June 2018 Summary of Teleconference to Discuss Open Items Associated with the Review of the Advanced Boiling Water Reactor Certification Renewal ML18088A2242018-04-0909 April 2018 Memo - Safety Evaluation with No Open Items GEH Advanced Boiling Water Reactor Section 13.3, Emergency Planning ML18029A2592018-01-31031 January 2018 Memo to ACRS - GEH ABWR DC Renewal SE for Section 12 2019-06-27
[Table view] Category:NRO Safety Evaluation Report (SER)-Delayed
MONTHYEARML19171A2932019-06-27027 June 2019 ABWR DC Renewal Issue 18b Section 9.1.2.2 New and SFP Racks Seismic Structural Analysis Rev 4 ML19162A0782019-06-26026 June 2019 ABWR DC Renewal Issue 09 SE Section 6.2.1.9 ECCS Strainers Rev 5 ML19155A2072019-06-25025 June 2019 ABWR DC Renewal Issue 38 SE Section 6.3 ECCS Rev 3 ML19148A4632019-06-19019 June 2019 ABWR DC Renewal Issue 26 SER for Section 16 Technical Specifications Revision 3 ML19162A0802019-06-19019 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 09 Section 6.2.1.9 ECCS Strainers ML19148A7802019-06-19019 June 2019 ABWR DC Renewal Issue 26 Section 7.4.1.4.4 Shutdown Panel Inst Rev 4 ML19148A5162019-06-19019 June 2019 ABWR DC Renewal Issue 26 Section 5.4.7 RHR Rev 5 ML19141A3742019-06-19019 June 2019 ABWR DC Renewal SER Section 22 Fukushima Design Related Changes Revision 5 ML19114A3652019-06-19019 June 2019 ABWR DC Renewal SER Section 7.5.2.1 Post Accident Monitoring System Pointer SER Rev 3 ML19114A3532019-06-19019 June 2019 ABWR DC Renewal SER Section 9.1.3 Fuel Pool Cooling and Cleanup System Pointer SER Rev 4 ML19113A1732019-06-19019 June 2019 ABWR DC Renewal SER Section 3.2.3 Safety Classifications Pointer SER Rev 4 ML19148A4612019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 16 Technical Specifications ML19141A3712019-06-0606 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SE for Section 22 Fukushima Design Related Changes ML19148A5152019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 5.4.7 Residual Heat Removal System ML19148A7782019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 7.4.1.4.4 Shutdown Panel ML19149A3152019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 8.3.4.4 Class 1E Bus Isolation ML19114A3512019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 9.1.3 Fuel Pool Cooling and Cleanup System Revision 0 ML19114A3382019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 7.5.2.1 Post Accident Monitoring Revision 0 ML19113A1762019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 3.2.3 Safety Classifications Revision 0 ML18052A9252019-02-0808 February 2019 ABWR SER Subsection 6.2.1.3 ML18324A7472019-02-0707 February 2019 GEH ABWR DC Renewal SE for Subsections 8.2.5 and 8.3.3 ML18346A6092019-01-15015 January 2019 ABWR DC Renewal SE Section 5.4.8 Reactor Water Cleanup System ML19002A3912019-01-15015 January 2019 Letter to Applicant - GEH ABWR DC Renewal SE for Subsections 8.2.5 and 8.3.3.17 ML19002A3932019-01-11011 January 2019 Memo to ACRS - GEH Advanced Boiling Water Reactor DC Renewal Safety Evaluation for Subsections 8.2.5 and 8.3.3.17 ML18346A5612018-12-19019 December 2018 Letter to Applicant - GEH ABWR DC Renewal Issue 10 SE for Section 5.4.8 ML18312A1642018-12-0404 December 2018 Memo - GEH ABWR DC Renewal Safety Evaluation for Section 19.1, Probabilistic Risk Assessment ML18312A1622018-12-0404 December 2018 Safety Evaluation - ABWR DC Renewal Safety Evaluation, Section 19.1, Probabilistic Risk Assessment ML18312A1632018-12-0404 December 2018 Letter to Applicant - ABWR DC Renewal Safety Evaluation, Section 19.1, Probabilistic Risk Assessment ML18275A3512018-11-15015 November 2018 ABWR DC Renewal SER Sect 19G-5 Aia Evaluation ML18029A1302018-07-26026 July 2018 Chapter 3, Seismic Subsystem Analysis, Section 3.7.3, GEH Advanced Boiling Water Reactor DC Renewal ML18096A0462018-07-23023 July 2018 ABWR DC Renewal SER Section 9.1.1 - New Fuel Storage ML18096A0592018-07-23023 July 2018 ABWR DC Renewal SER Section 9.1.5 - Heavy Load Cranes ML18096A1202018-07-23023 July 2018 ABWR DC Renewal SER Section 9.1.4 - Light Load Handling ML18046A9922018-07-0202 July 2018 Chapter 13, Plant Procedures, Section 13.5 Safety Evaluation with No Open Items, GEH Advanced Boiling Water Reactor DC Renewal ML18057A4802018-06-21021 June 2018 ABWR DC Renewal SE Section 13.3 - Emergency Planning ML18026A6672018-06-20020 June 2018 Advanced Boiling Water Reactor Safety Evaluation, Section 3.3 - Tornado and Hurricane Loadings ML18026A7502018-06-20020 June 2018 Advanced Boiling Water Reactor DC Renewal Safety Evaluation Section 2.3 - Meteorology ML18052A1372018-05-0707 May 2018 ABWR DC Renewal SER Section 5.2.5 Low Level Reactor Coolant Leakage Rev 2 ML17354A8142018-03-0808 March 2018 Chapter 9.5.1, Fire Protection System, Safety Evaluation with No Open Items, GEH Advanced Boiling Water Reactor DC Renewal 2019-06-06
[Table view] |
Text
9.0 Auxiliary Systems 9.1.2.2 Fuel Racks 9.1.2.2.1 Regulatory Criteria In the GE-Hitachi Nuclear Energy (GEH), U.S. Advanced Boiling Water Reactor (ABWR) Design Control Document (DCD), Revision 6, the applicant proposed changes to the accident load combinations and the fuel rack support description, along with changes to two combined license (COL) license information items.
In a letter dated July 20, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12125A385), the U.S. Nuclear Regulatory Commission (NRC) staff identified 28 items for GEHs consideration as part of its application to renew the ABWR Design Certification (DC). In Item No. 18 Part B of the letter, the applicant was requested to provide structural, dynamic, and impact analysis of new and spent fuel racks (ABWR DCD Tier 2, Section 9.1.6.2, Dynamic and Impact Analysis of New Fuel Storage Racks, and Section 9.1.6.7, Spent Fuel Racks Structural Evaluation).
The originally certified ABWR DCD identifies that the fuel racks in the spent fuel pool (SFP) are seismic Category I structures. The staff evaluation documented in Section 9.1.2, Spent Fuel Storage, of NUREG-1503, Final Safety Evaluation Report Related to Certification of the Advanced Boiling Water Reactor Design, dated July 13, 1994 (ADAMS Accession No. ML080670592), approved the fuel storage racks in the SFP as described in the DCD.
In response to the staffs July 20, 2012 letter, GEH submitted proposed changes to the accident load combinations and fuel racks support description, along with a revised COL license information item in DCD Tier 2, Section 9.1.6.7, in a letter dated August 11, 2015 (ADAMS Accession No. ML15223B139). These changes have the effect of deferring the structural, dynamic, and impact analysis of the spent fuel racks to the COL applicant. In addition, the applicant deleted the COL license information item related to the dynamic and impact analysis of the new fuel storage racks described in DCD Tier 2, Revision 5, Section 9.1.6.2, Dynamic and Impact Analyses of New Fuel Storage Racks, as part of the removal of the new fuel storage vault evaluated by the staff in Section 9.1.1, New Fuel Storage, of this supplemental safety evaluation report (SER).
Because the changes do not fit within the definition of a modification and because the pertinent spent fuel rack analyses will be performed by the COL applicant in accordance with the regulations in effect during the COL application review, these proposed changes are amendments, as defined in Chapter 1 of this supplement. Therefore, in accordance with Title 10 Code of Federal Regulations (10 CFR) 52.59(c), these design analysis changes are amendments, and will correspondingly be evaluated using the regulations in effect at renewal.
9.1.2.2-1
The relevant requirements of the NRCs regulations for this area of review, and the associated acceptance criteria, are described in Section 9.1.2, Spent Fuel Storage, of NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants, LWR Edition, Revision 4, and Appendix D to Standard Review Plan (SRP) Section 3.8.4, Other Seismic Category I Structures of SRP, Revision 4. The applicable requirement for this review is:
10 CFR Part 50, Appendix A, General Design Criterion (GDC) 2, Design Bases for Protection Against Natural Phenomena, requires that structures housing the facility and the facility itself can withstand the effects of natural phenomena such as earthquakes, tornados, hurricanes, and appropriate combinations of all loads.
9.1.2.2.2 Summary of Technical Information GEH submitted the proposed markups to ABWR DCD, Revision 5, in Enclosure 2 (ADAMS Accession No. ML15223B141) in the letter dated August 11, 2015. In Enclosure 1 (ADAMS Accession No. ML15223B140) of this letter, GEH described that structural, dynamic, and impact analyses of fuel racks are more appropriately addressed as a COL information item since these analyses are highly dependent on the specific rack design. The staff confirmed that the proposed Revision 5 DCD markups were included in the ABWR DCD, Revision 6.
9.1.2.2.3 Technical Evaluation The staff reviewed the proposed changes in GEH ABWR DCD Tier 2, Revision 6, Section 9.1.2.1.3, Mechanical and Structural Design, Section 9.1.2.3.2, Structural Design and Material Compatibility Requirements, and Section 9.1.6.7, Spent Fuel Racks Structural Evaluation, to ensure that the effects of natural phenomena such as earthquakes, tornadoes, and hurricanes on the fuel racks in the GEH ABWR design are considered, as required by GDC 2, using the guidance in SRP Section 9.1.2, Revision 4, and Appendix D to SRP Section 3.8.4, Revision 4.
Revision 5 to the GEH ABWR DCD did not provide the structural, dynamic, and impact analyses of the fuel racks. In its August 11, 2015 letter, GEH addressed these analyses through a COL information item and provided additional details regarding the structural, dynamic, and impact analyses of the fuel racks for the SFP. The applicant did not address the new fuel racks because the applicant proposes to remove these racks and store new fuel in the SFP; this change is evaluated in Section 9.1.1, New Fuel Storage, of this supplemental SER. Therefore, only the structural, dynamic, and impact analyses of fuel racks in the SFP were evaluated as part of this ABWR supplemental SER section.
In GEH ABWR DCD Tier 2, Revision 6, Section 9.1.2.1.3, GEH replaced the list of load combinations previously specified with a reference to the load combinations in Appendix D to SRP Section 3.8.4. These revisions are acceptable to the staff because GEH followed the guidance of Appendix D to Section 3.8.4 of SRP Revision 4. GEH also deleted language regarding the use of linear elastic design methods in the structural evaluation of the fuel racks.
This deletion is also acceptable because (a) the structural, dynamic, and impact analyses of fuel racks is a COL license information item, (b) design methods can be determined by the COL applicant, and (c) the localized nonlinear plastic regime may occur due to postulated loading 9.1.2.2-2
cases as proposed by a future COL applicant. In addition, GEH changed the dynamic method to an acceptable dynamic analysis method, which is acceptable because the COL applicant will identify the dynamic analysis method, and the acceptability of the method will be determined during the COL application review. GEH deleted the statement Compressive stability will be calculated according to the American Iron and Steel Institute (AISI) code for light gauge structures, which is also acceptable to the staff because light gauge structures are no longer used as part of fuel rack fabrication and the AISI code is not referenced for acceptable fuel rack design in Appendix D to Section 3.8.4 of SRP Revision 4.
In GEH ABWR DCD Tier 2, Revision 6, Section 9.1.2.3.2, GEH revised the sentence related to an older SFP rack design that utilized a sub-structure with the description of updated designs that are considered Freestanding as follows:
The fuel storage racks are designed to be supported vertically by the fuel floor. The support structure allows sufficient pool water flow for natural convection cooling of the stored fuel. The fuel rack modules are freestanding (i.e., not attached to the floor and can be removed).
The staff reviewed the proposed change and found it acceptable because GEH accurately described the boundary conditions of the SFP fuel racks. In addition, GEH deleted the statement Lead-in guides at the top of the storage spaces provide guidance of the fuel during insert, which is acceptable to the staff because it is not related to the structural design and material compatibility requirements of the fuel racks.
In GEH ABWR DCD Tier 2, Revision 6, Section 9.1.6.7, GEH added the following italicized language to a COL license information item:
The COL applicant shall provide the NRC a confirmatory structural evaluation of the spent fuel racks, as outlined in Subsection 9.1.2.1.3. This evaluation is dependent on a vendor specific design and the as-built configuration of spent fuel storage racks.
Structural integrity of the racks will be demonstrated for the load combinations described in SRP 3.8.4 Appendix D. The fuel storage racks meet seismic Category I requirements.
The staff reviewed the proposed changes and found them acceptable because GEH provided additional details related to the COL license information for the fuel racks structural evaluation, and GEH refers to the guidance of Appendix D to SRP Section 3.8.4.
9.1.2.2.4 Conclusion The staffs review concludes that the applicants proposed changes related to the fuel racks for GEH ABWR design comply with GDC 2 in Appendix A to 10 CFR Part 50, and the detailed structural evaluations of the fuel racks will be provided by the COL applicant in accordance with the guidance of Appendix D to SRP Section 3.8.4, which is acceptable.
9.1.2.2-3