|
---|
Category:Letter
MONTHYEARML24270A0652024-09-26026 September 2024 ABWR Design Certification Annual 10 CFR 50.46 Report for 2024 ML23277A1692023-10-0404 October 2023 GE-Hitachi Nuclear Energy Americas, LLC, ABWR Design Certification Annual 10 CFR 50.46 Report for 2023 ML20269A1842020-09-25025 September 2020 ABWR Design Certification Annual 10 CFR 50.46 Report for 2020 ML20076D9632020-03-16016 March 2020 GE Hitachi Nuclear Energy, Transmittal of ABWR Standard Plant Design Certification Renewal Application Design Control Document Revision 7, Chapter 5 ML20129J8972019-10-31031 October 2019 ABWR DC Renewal Supplemental FSER Appendix E Report by Advisory Committee on Reactor Safeguards ML19171A2912019-06-27027 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 18b for Section 9.1.2.2 New and SFP Racks Seismic Structural Analysis ML19171A2932019-06-27027 June 2019 ABWR DC Renewal Issue 18b Section 9.1.2.2 New and SFP Racks Seismic Structural Analysis Rev 4 ML19164A0352019-06-20020 June 2019 Letter to Applicant - GEH ABWR DC Renewal Section 1 Introduction and General Discussion ML19162A0802019-06-19019 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 09 Section 6.2.1.9 ECCS Strainers ML19113A1732019-06-19019 June 2019 ABWR DC Renewal SER Section 3.2.3 Safety Classifications Pointer SER Rev 4 ML19114A3532019-06-19019 June 2019 ABWR DC Renewal SER Section 9.1.3 Fuel Pool Cooling and Cleanup System Pointer SER Rev 4 ML19148A4632019-06-19019 June 2019 ABWR DC Renewal Issue 26 SER for Section 16 Technical Specifications Revision 3 ML19148A7802019-06-19019 June 2019 ABWR DC Renewal Issue 26 Section 7.4.1.4.4 Shutdown Panel Inst Rev 4 ML19148A4612019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 16 Technical Specifications ML19155A2102019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 38 Section 6.3 Emergency Core Cooling Systems ML19156A1512019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 18a for Section 4.2 Rx LOCA and Seismic Load ML19156A1802019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 19 & 20 for Section 9.1.2.1 New and Spent Fuel Storage ML19141A3712019-06-0606 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SE for Section 22 Fukushima Design Related Changes ML19113A1762019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 3.2.3 Safety Classifications Revision 0 ML19148A5152019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 5.4.7 Residual Heat Removal System ML19148A5932019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 5.4.7.1.1.10 Aciwa ML19148A7782019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 7.4.1.4.4 Shutdown Panel ML19149A3152019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 8.3.4.4 Class 1E Bus Isolation ML19114A3512019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 9.1.3 Fuel Pool Cooling and Cleanup System Revision 0 ML19114A3382019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 7.5.2.1 Post Accident Monitoring Revision 0 ML19142A1862019-05-31031 May 2019 GE Hitachi Nuclear Energy U. S. Advanced Boiling Water Reactor Design Certification Renewal Schedule Letter, May 2019 ML18164A1092019-02-0404 February 2019 Letter to Applicant - GEH ABWR DC Renewal SE for Subsection 6.2.1 ML18234A4312019-02-0404 February 2019 Letter Safety Evaluation with No Open Items GEH ABWR DC Renewal Subsection 6.2.1.6 ML19002A3912019-01-15015 January 2019 Letter to Applicant - GEH ABWR DC Renewal SE for Subsections 8.2.5 and 8.3.3.17 ML19002A3932019-01-11011 January 2019 Memo to ACRS - GEH Advanced Boiling Water Reactor DC Renewal Safety Evaluation for Subsections 8.2.5 and 8.3.3.17 ML18346A5612018-12-19019 December 2018 Letter to Applicant - GEH ABWR DC Renewal Issue 10 SE for Section 5.4.8 ML18312A1632018-12-0404 December 2018 Letter to Applicant - ABWR DC Renewal Safety Evaluation, Section 19.1, Probabilistic Risk Assessment ML18312A1622018-12-0404 December 2018 Safety Evaluation - ABWR DC Renewal Safety Evaluation, Section 19.1, Probabilistic Risk Assessment ML18275A1772018-11-15015 November 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 19.5 ML18200A3192018-07-26026 July 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Subsection 3.7.3 ML18183A4322018-07-12012 July 2018 Advanced Boiling-Water Reactor Design Certification Renewal Application - Safety Evaluation with No Open Items for Section 9.1.4, Light Load Handling System ML18183A3712018-07-12012 July 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 9.1.1 ML18183A4172018-07-12012 July 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 9.1.5 ML18176A1442018-06-28028 June 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 13 ML18176A1432018-06-27027 June 2018 Memo to ACRS - GEH ABWR DC Renewal SE for Section 13.5 ML18155A2122018-06-13013 June 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 2.3 Meteorology ML18155A2352018-06-13013 June 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 3.3 Severe Wind and Extreme Wind (Tornado and Hurricane) Loadings ML18155A2902018-06-13013 June 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 3.5.1.4 Missiles Generated by Natural Phenomena ML18114A0362018-05-0202 May 2018 Letter - Advanced boiling-Water Reactor Design Certification Renewal Application Safety Evaluation with No Open Items for Section 5.2.5, Reactor Coolant Pressure Boundary Leakage Detection ML18088A2222018-04-10010 April 2018 Letter Safety Evaluation with No Open Items for Section 13.3, Emergency Planning. ML18059A3422018-03-0808 March 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 9.5.1 Final ML17097A4702018-02-0202 February 2018 GE Hitachi Nuclear Energy - U.S. Advanced Boiling-Water Reactor Design Certification Renewal Application, Closure of Design Items 14, 15, 16, 21, 24 and 25 ML18029A2602018-02-0101 February 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 12 ML16341A8122016-12-0606 December 2016 GE Hitachi Advanced Boiling Water Reactor Design Certification Renewal Application, Actions Regarding Resolution of Item #26; Fukushima Recommendation 4.2, Mitigating Strategies ML16299A1472016-10-25025 October 2016 GE-Hitachi Nuclear Energy - Supplement 1 to Proposed Resolution of Items #18b, 19 and 20 of NRC Suggested U.S. Advanced Boiling Water Reactor Design Changes 2024-09-26
[Table view] |
Text
OFFICIAL USE ONLY - PROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 12, 2019 Ms. Michelle P. Catts Senior Vice President, Regulatory Affairs GE Hitachi Nuclear Energy 3901 Castle Hayne Road MC A-18 Wilmington, NC 28401
SUBJECT:
ADVANCED BOILING-WATER REACTOR DESIGN CERTIFICATION RENEWAL APPLICATION SAFETY EVALUATION WITH NO OPEN ITEMS FOR SECTION 6.3, EMERGENCY CORE COOLING SYSTEMS
Dear Ms. Catts:
The U.S. Nuclear Regulatory Commission (NRC) staff is preparing a safety evaluation (SE) with no open items to supplement the final safety evaluation report associated with the staffs review of the advanced boiling-water reactor (ABWR) design that was documented in NUREG-1503, Final Safety Evaluation Report Related to the Certification of the Advanced Boiling Water Reactor Design, and NUREG-1503, Supplement 1. This SE will document the staffs review of your application dated December 7, 2010, to renew the ABWR design certification.
The staffs SE for Section 6.3, Emergency Core Cooling Systems, is being provided to the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee to support a future meeting of the ACRS Subcommittee.
The enclosed SE is being provided only to GE-Hitachi Nuclear Energy for review of proprietary information pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 2.390 Public Inspections, Exemptions, Requests for Withholding. The staff concludes that the enclosed SE does not contain any information for which exemption from public disclosure has been sought or approved or any factual errors. However, the NRC will withhold the enclosed SE from public disclosure for ten business days from the date of this letter to allow you the opportunity to verify the staffs conclusion that the SE contains no such exempt information or any factual errors. If within that ten-day period, you do not request that all or portions of the SE be withheld from public disclosure, the enclosure will be made available for public inspection through the NRC Public Document Room and the Publicly Available Records component of NRCs Agencywide Documents Access and Management System and placed on the NRCs public Web page for this application.
Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is DECONTROLLED.
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
OFFICIAL USE ONLY - PROPRIETARY INFORMATION M. Catts If you have any questions or comments concerning this matter, I can be reached at 301-415-4093 or via e-mail address at James.Shea@nrc.gov.
Sincerely,
/RA/
James Shea, Lead Project Manager Licensing Branch 3 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors Docket No.: 52-045
Enclosure:
As stated cc w/o encl.: See next page OFFICIAL USE ONLY - PROPRIETARY INFORMATION
ML19155A210 *via e-mail NRO-002 OFFICE LPM:NRO:DLSE LA:NRO:DLSE LPM:NRO:DLSE NAME JShea SGreen* JShea (sign)
DATE 06/04/2019 06/04/2019 6/12/2019 DC GEH - ABWR Mailing List (Revised 06/21/2019)
Email APH@NEI.org (Adrian Heymer) awc@nei.org (Anne W. Cottingham) brianr.johnson@ge.com (R. R. Johnson)
Christopher.Powell@ge.com (Christopher Powell) cschlaseman@mpr.com (Caroline Schlaseman)
CumminWE@Westinghouse.com (Edward W. Cummins) cwaltman@roe.com (C. Waltman) david.lewis@pillsburylaw.com (David Lewis)
F.Shahrokhi@areva.com (Farshid Shahrokhi)
George_Stramback@Charter.net (George Stramback)
GovePA@BV.com (Patrick Gove)
Joseph_Hegner@dom.com (Joseph Hegner)
Kenichi.Sato.sz@hitachi.com (Kenichi Sato)
KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) lon.burnam@house.state.tx.us (Lon Burnam) media@nei.org (Scott Peterson)
MSF@nei.org (Marvin Fertel) nirsnet@nirs.org (Michael Mariotte)
Nuclaw@mindspring.com (Robert Temple)
Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette)
RJB@NEI.org (Russell Bell) rtrench@mpr.com (Randy Trench) sabinski@suddenlink.net (Steve A. Bennett) stephen.burdick@morganlewis.com (Stephen Burdick) tom.miller@hq.doe.gov (Tom Miller) trsmith@winston.com (Tyson Smith)
Vanessa.quinn@dhs.gov (Vanessa Quinn) walter.schumitsch@ge.com (Walter Schumitsch) wayne.marquino@gmail.com (Wayne Marquino)
Page 1 of 1