Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML19171A293 | 27 June 2019 | ABWR DC Renewal Issue 18b Section 9.1.2.2 New and SFP Racks Seismic Structural Analysis Rev 4 | Earthquake |
ML19162A078 | 26 June 2019 | ABWR DC Renewal Issue 09 SE Section 6.2.1.9 ECCS Strainers Rev 5 | Boric Acid Mission time Coatings Incorporated by reference Fuel cladding |
ML19155A207 | 25 June 2019 | ABWR DC Renewal Issue 38 SE Section 6.3 ECCS Rev 3 | Probabilistic Risk Assessment |
ML19148A463 | 19 June 2019 | ABWR DC Renewal Issue 26 SER for Section 16 Technical Specifications Revision 3 | Reactor Vessel Water Level Earthquake |
ML19162A080 | 19 June 2019 | Letter to Applicant - GEH ABWR DC Renewal Issue 09 Section 6.2.1.9 ECCS Strainers | |
ML19148A780 | 19 June 2019 | ABWR DC Renewal Issue 26 Section 7.4.1.4.4 Shutdown Panel Inst Rev 4 | Safe Shutdown Earthquake |
ML19148A516 | 19 June 2019 | ABWR DC Renewal Issue 26 Section 5.4.7 RHR Rev 5 | Earthquake Fuel cladding |
ML19141A374 | 19 June 2019 | ABWR DC Renewal SER Section 22 Fukushima Design Related Changes Revision 5 | Post Accident Monitoring Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Earthquake Backfit |
ML19114A365 | 19 June 2019 | ABWR DC Renewal SER Section 7.5.2.1 Post Accident Monitoring System Pointer SER Rev 3 | Post Accident Monitoring Spent Fuel Pool Instrumentation |
ML19114A353 | 19 June 2019 | ABWR DC Renewal SER Section 9.1.3 Fuel Pool Cooling and Cleanup System Pointer SER Rev 4 | Spent Fuel Pool Instrumentation |
ML19113A173 | 19 June 2019 | ABWR DC Renewal SER Section 3.2.3 Safety Classifications Pointer SER Rev 4 | Spent Fuel Pool Instrumentation |
ML19148A461 | 12 June 2019 | Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 16 Technical Specifications | |
ML19141A371 | 6 June 2019 | Letter to Applicant - GEH ABWR DC Renewal Issue 26 SE for Section 22 Fukushima Design Related Changes | |
ML19148A515 | 5 June 2019 | Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 5.4.7 Residual Heat Removal System | |
ML19148A778 | 5 June 2019 | Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 7.4.1.4.4 Shutdown Panel | |
ML19149A315 | 5 June 2019 | Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 8.3.4.4 Class 1E Bus Isolation | |
ML19114A351 | 5 June 2019 | Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 9.1.3 Fuel Pool Cooling and Cleanup System Revision 0 | |
ML19114A338 | 5 June 2019 | Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 7.5.2.1 Post Accident Monitoring Revision 0 | Post Accident Monitoring |
ML19113A176 | 5 June 2019 | Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 3.2.3 Safety Classifications Revision 0 | |
ML18052A925 | 8 February 2019 | ABWR SER Subsection 6.2.1.3 | |
ML18324A747 | 7 February 2019 | GEH ABWR DC Renewal SE for Subsections 8.2.5 and 8.3.3 | Safe Shutdown Open Phase Condition |
ML18346A609 | 15 January 2019 | ABWR DC Renewal SE Section 5.4.8 Reactor Water Cleanup System | Fuel cladding |
ML19002A391 | 15 January 2019 | Letter to Applicant - GEH ABWR DC Renewal SE for Subsections 8.2.5 and 8.3.3.17 | |
ML19002A393 | 11 January 2019 | Memo to ACRS - GEH Advanced Boiling Water Reactor DC Renewal Safety Evaluation for Subsections 8.2.5 and 8.3.3.17 | |
ML18346A561 | 19 December 2018 | Letter to Applicant - GEH ABWR DC Renewal Issue 10 SE for Section 5.4.8 | |
ML18312A164 | 4 December 2018 | Memo - GEH ABWR DC Renewal Safety Evaluation for Section 19.1, Probabilistic Risk Assessment | Probabilistic Risk Assessment |
ML18312A162 | 4 December 2018 | Safety Evaluation - ABWR DC Renewal Safety Evaluation, Section 19.1, Probabilistic Risk Assessment | Probabilistic Risk Assessment |
ML18312A163 | 4 December 2018 | Letter to Applicant - ABWR DC Renewal Safety Evaluation, Section 19.1, Probabilistic Risk Assessment | Probabilistic Risk Assessment |
ML18275A351 | 15 November 2018 | ABWR DC Renewal SER Sect 19G-5 Aia Evaluation | Safe Shutdown Ultimate heat sink Fire Barrier Incorporated by reference |
ML18029A130 | 26 July 2018 | Chapter 3, Seismic Subsystem Analysis, Section 3.7.3, GEH Advanced Boiling Water Reactor DC Renewal | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML18096A046 | 23 July 2018 | ABWR DC Renewal SER Section 9.1.1 - New Fuel Storage | Earthquake |
ML18096A059 | 23 July 2018 | ABWR DC Renewal SER Section 9.1.5 - Heavy Load Cranes | Safe Shutdown Earthquake |
ML18096A120 | 23 July 2018 | ABWR DC Renewal SER Section 9.1.4 - Light Load Handling | Earthquake |
ML18046A992 | 2 July 2018 | Chapter 13, Plant Procedures, Section 13.5 Safety Evaluation with No Open Items, GEH Advanced Boiling Water Reactor DC Renewal | Severe Accident Management Guideline B.5.b Mitigating Strategies |
ML18057A480 | 21 June 2018 | ABWR DC Renewal SE Section 13.3 - Emergency Planning | Fukushima Dai-Ichi Earthquake |
ML18026A667 | 20 June 2018 | Advanced Boiling Water Reactor Safety Evaluation, Section 3.3 - Tornado and Hurricane Loadings | Tornado Generated Missile |
ML18026A750 | 20 June 2018 | Advanced Boiling Water Reactor DC Renewal Safety Evaluation Section 2.3 - Meteorology | Tornado Missile Tornado Generated Missile |
ML18052A137 | 7 May 2018 | ABWR DC Renewal SER Section 5.2.5 Low Level Reactor Coolant Leakage Rev 2 | Pressure Boundary Leakage |
ML17354A814 | 8 March 2018 | Chapter 9.5.1, Fire Protection System, Safety Evaluation with No Open Items, GEH Advanced Boiling Water Reactor DC Renewal | Safe Shutdown Multiple Spurious Operation Fire Protection Program |