ML19163A320

From kanterella
Jump to navigation Jump to search
20190415_UNC New Haven Racr, Appendix K Soil Boring Logs, Utility Trench Soil Sampling Raw Data
ML19163A320
Person / Time
Site: 07000371
Issue date: 11/30/2018
From:
Cabrera Services
To:
NRC Region 1
Shared Package
ML051740240, ML19095A008 List: ... further results
References
Download: ML19163A320 (3)


Text

UNC New Haven Preliminary Utility Trench Soil Sampling Analytical Data Notes:

Sample Designation Description U-234 (pCi/g)

U-235 [pCi/g (italics indicate a non-detect red indicates MDA used as result or a value <MDA)]

U-238 [pCi/g (italics indicate a non-detect red indicates MDA used as result or a value <MDA)]

U-Total (pCi/g)

UNC-INV-TR-001 (1)

South Trench section 2, Drain #9 (b/w columns 44 & 45) sludge 1671.84 61.92 7.28 1741.04 UNC-INV-TR-002 (1)

South Trench section 2, Drain #6 (b/w columns 43 & 44) sludge 1059.48 39.24 0.74 1099.46 UNC-INV-TR-003 (1)

Collected from Drainage Hole, in Section 3 of South Trench 435.25 16.12 17.68 469.05 UNC-INV-TR-004 (1)

Investigation drainage hole sample, Sec 3 of South Trench, Grid #21-22, South wall floor 385.42 14.27 18.13 417.82 UNC-INV-TR-005 (1)

Investigation drainage hole sample, Sec 3 of South Trench, Grid #25 271.73 10.06 11.81 293.61 UNC-INV-TR-006 (1)

Investigation drainage hole sample, Sec 3 of South Trench, Grid #26 434.07 16.08 19.10 469.25 UNC-INV-TR-007 (1)

Section 2 grid 25, Comosite 2' bgs 55.76 2.07 2.53 60.36 UNC-INV-TR-008 (1) 1'bgs South Trench behind X-Ray room, Grid 25 511.37 18.94 3.88 534.19 UNC-INV-TR-009 (1)

Column 43 - 44 area, 2'bgs 155.41 5.76 6.29 167.46 UNC-INV-TR-011 (1) 8" Pipe Contents, Section 3 South Trench (re-sampled, QC Error) 320.47 11.87 8.52 340.86 UNC-INV-TR-010 (1)

Section 3, South Trench Cutout, Hand Grab 6" Column 32 0.00 0.00 2.05 2.05 UNC-INV-TR-012 (1)

Section 1, South Trench 3ft West of Entrance Ladder, Center of Trench Floor, Composite of 1'6" bgs 2.78 0.10 0.89 3.78 UNC-INV-TR-013 (1)

Pipe Contents Section 3 South Trench Column 29 0.00 0.00 0.48 0.48 UNC-INV-TR-014 (1)

Phase #4 Sample #3 End of Tunnel 66.99 2.48 2.62 72.10 UNC-INV-TR-015 (1)

Phase #4 Sample #2 Middle of Tunnel 63.73 2.36 2.14 68.23 UNC-INV-TR-016 (1)

Phase #4 Down Spout Column #19 0.00 0.00 10.60 10.60 UNC-INV-TR-017 (1)

Phase #4 Down Spout Column #11 0.00 0.00 1.25 1.25 UNC-INV-TR-018 (1)

Phase #4 Down Spout Column #28 0.00 0.00 0.83 0.83 UNC-INV-TR-019 (1)

Column 17/18 Lateral Trench, Phase #4 Sample #4 40 ft 107.22 3.97 5.42 116.60 UNC-INV-TR-020 (1)

Column 17/18 Lateral Trench, Phase #4 Sample #2 20 ft 98.55 3.65 4.64 106.84 UNC-INV-TR-021 (1)

Column 17/18 Lateral Trench, Phase #4 Sample #3 30 ft 83.04 3.08 1.22 87.34 UNC-INV-TR-022 (1)

Column 17/18 Lateral Trench, Phase #4 50 ft 35.87 1.33 2.27 39.47 UNC-INV-TR-023 (1)

Column 17/18 Lateral Trench, Phase #4 60 ft 33.73 1.25 2.33 37.32 UNC-INV-TR-024 (1)

Column 17/18 Lateral Trench, Phase #4 70 ft 35.46 1.31 1.82 38.60 UNC-INV-TR-025 (1)

Phase #4 80 ft South Trench 63.79 2.36 2.78 68.93 UNC-INV-TR-026 (1)

Main Tunnel, Column #6 Floor 70.76 2.62 3.08 76.46 UNC-INV-TR-027 (1)

Branch Off Area #2, Middle Sample Perpindicular to Main Tunnel Floor 61.38 2.27 2.81 66.46 UNC-INV-TR-028 (1)

Batch Area #2, West Sample Street Side Floor 31.33 1.16 1.97 34.46 UNC-INV-TR-029 (1)

Batch Area #2, East Sample Street Side Floor 42.53 1.58 1.92 46.02 UNC-INV-TR-030 (1)

Column #1 Building Towards End of Street 0.00 0.00 0.88 0.88 UNC-INV-TR-031 Drainage Hole Soil, South Trench, Adjacent to Column 2 102.54 3.80 3.98 110.31 UNC-INV-TR-032 Drainage Hole Soil, South Trench, Adjacent to Column 3 69.99 2.59 1.21 73.79 UNC-INV-TR-033 Drainage Hole Soil, South Trench, Adjacent to Column 4 92.18 3.41 3.07 98.66 UNC-INV-TR-034 Drainage Hole Soil, South Trench, Adjacent to Column 5 23.21 0.86 1.00 25.07 UNC-INV-DH-001 south trench drainage hole btwn 45/41 467.22 17.30 1.95 486.47 UNC-INV-DH-002 south trench drainage hole btwn 45/41 454.10 16.82 2.28 473.20 UNC-INV-DH-003 south trench drainage hole btwn 45/41 371.35 13.75 1.65 386.75 UNC-INV-DH-004 south trench drainage hole btwn 45/41 395.55 14.65 1.60 411.80 UNC-INV-DH-005 south trench drainage hole btwn 45/41 840.65 31.14 2.49 874.28

UNC New Haven Preliminary Utility Trench Soil Sampling Analytical Data Notes:

Sample Designation Description U-234 (pCi/g)

U-235 [pCi/g (italics indicate a non-detect red indicates MDA used as result or a value <MDA)]

U-238 [pCi/g (italics indicate a non-detect red indicates MDA used as result or a value <MDA)]

U-Total (pCi/g)

UNC-INV-DH-007 south trench drainage hole btwn 45/41 680.17 25.19 2.21 707.57 UNC-INV-DH-010 south trench drainage hole btwn 45/41 380.67 14.10 2.18 396.95 UNC-INV-DH-012 south trench drainage hole btwn 45/41 674.41 24.98 1.98 701.37 UNC-INV-DH-013 south trench drainage hole btwn 41/32 143.69 5.32 12.40 161.41 UNC-INV-DH-014 south trench drainage hole btwn 41/32 164.03 6.08 6.16 176.26 UNC-INV-DH-015 south trench drainage hole btwn 41/32 51.04 1.89 1.30 54.23 UNC-INV-DH-016 south trench drainage hole btwn 41/32 137.87 5.11 5.12 148.10 UNC-INV-DH-017 south trench drainage hole btwn 41/32 600.44 22.24 2.49 625.17 UNC-INV-DH2-001 South Trench Drainage Holes, Columns 27-41 0.00 0.00 1.10 1.10 UNC-INV-DH2-003 South Trench Drainage Holes, Columns 27-41 0.00 0.00 1.07 1.07 UNC-INV-DH2-004 South Trench Drainage Holes, Columns 27-41 0.00 0.00 1.05 1.05 UNC-INV-DH2-007 South Trench Drainage Holes, Columns 27-41 0.00 0.00 2.59 2.59 UNC-INV-DH2-009 South Trench Drainage Holes, Columns 27-41 0.00 0.00 0.81 0.81 UNC-INV-DH2-010 South Trench Drainage Holes, Columns 27-41 0.00 0.00 1.10 1.10 UNC-INV-DH2-012 South Trench Drainage Holes, Columns 27-41 0.00 0.00 2.35 2.35 UNC-INV-DH2-013 South Trench Drainage Holes, Columns 27-41 0.00 0.00 1.92 1.92 UNC-INV-NDH-001 North trench column 15 50.86 1.88 0.68 53.43 UNC-INV-NDH-002 North trench column 19 112.12 4.15 2.94 119.21 UNC-INV-South Trench DH12-2430 South Trench Columns 39-40, DH12 CENTER 24"-30" 38.13 1.41 2.02 41.56 UNC-INV-South Trench DH12-1FS2430 South Trench Columns 39-40, DH12 1' SOUTH 24"-30" 14.34 0.53 1.60 16.47 UNC-INV-South Trench DH12-1FW2430 South Trench Columns 39-40, DH12 1' WEST 24"-30" 43.35 1.13 1.81 46.28 UNC-INV-South Trench DH12-1FE2430 South Trench Columns 39-40, DH12 1' EAST 24"-30" 12.65 0.47 1.15 14.27 UNC-INV-South Trench DH12-2FE2430 South Trench Columns 39-40, DH12 2' EAST 24"-30" 12.49 0.46 1.59 14.54 UNC-INV-South Trench DH12-2FS2430 South Trench Columns 39-40, DH12 2' SOUTH 24"-30" 7.04 0.26 0.93 8.23 UNC-INV-South Trench DH12-2FW2430 South Trench Columns 39-40, DH12 2' WEST 24"-30" 19.45 0.72 1.27 21.44 UNC-INV-South Trench DH12-1FW3036 South Trench Columns 39-40, DH12 1' WEST 30"-36" 12.18 0.45 1.32 13.95 UNC-INV-South Trench DH12-2FW1218 South Trench Columns 39-40, DH12 2' WEST 12"-18" 19.78 0.73 1.06 21.57 UNC-INV-South Trench DH12-2FW1824 South Trench Columns 39-40, DH12 2' WEST 18"-24" 27.73 1.03 1.89 30.65 UNC-INV-South Trench DH12-2FW612 South Trench Columns 39-40, DH12 2' WEST 6"-12" 166.92 6.18 4.84 177.94 UNC-INV-South Trench DH12-2FW06 South Trench Columns 39-40, DH12 2' WEST 0"-6" 431.21 15.97 2.20 449.38 UNC-INV-South Trench DH12-VOID South Trench Columns 39-40, DH12 1'-3' WEST 12" 399.69 14.80 1.98 416.47 UNC-INV-South Trench DH12-2FS1824 South Trench Columns 39-40, DH12 2' SOUTH 18"-24" 14.23 0.33 1.36 15.93 UNC-INV-South Trench DH12-2FE1824 South Trench Columns 39-40, DH12 2' EAST 18"-24" 17.54 0.65 1.84 20.03 UNC-INV-South Trench DH12-2FE1218 South Trench Columns 39-40, DH12 2' EAST 12"-18" 44.67 1.65 0.74 47.07 UNC-INV-South Trench DH12-2FE612 South Trench Columns 39-40, DH12 2' EAST 6"-12" 45.94 1.70 2.79 50.43 UNC-INV-South Trench DH12-2FE06 South Trench Columns 39-40, DH12 2' EAST 0"-6" 527.79 19.55 2.29 549.62 UNC-INV-South Trench DH12-2FS1218 South Trench Columns 39-40, DH12 2' SOUTH 12"-18" 9.06 0.34 0.83 10.23 UNC-INV-South Trench DH12-2FS612 South Trench Columns 39-40, DH12 2' SOUTH 6"-12" 54.27 2.01 2.88 59.16 UNC-INV-South Trench DH12-2FS06 South Trench Columns 39-40, DH12 2' SOUTH 6" 14.42 0.53 1.92 16.87 UNC-INV-South Trench DH12-1FW1824 South Trench Columns 39-40, DH12 1' WEST 18"-24" 47.79 1.77 1.31 50.87 UNC-INV-South Trench DH12-1FE06 South Trench Columns 39-40, DH12 1' EAST 0"-6" 626.40 23.20 3.14 652.74

UNC New Haven Preliminary Utility Trench Soil Sampling Analytical Data Notes:

Sample Designation Description U-234 (pCi/g)

U-235 [pCi/g (italics indicate a non-detect red indicates MDA used as result or a value <MDA)]

U-238 [pCi/g (italics indicate a non-detect red indicates MDA used as result or a value <MDA)]

U-Total (pCi/g)

UNC-INV-South Trench DH12-1FE612 South Trench Columns 39-40, DH12 1' EAST 6"-12" 161.19 5.97 5.61 172.77 UNC-INV-South Trench DH12-1FE1824 South Trench Columns 39-40, DH12 1' EAST 18"-24" 20.03 0.74 1.02 21.80 UNC-INV-South Trench DH12-1FS1824 South Trench Columns 39-40, DH12 1' SOUTH 18"-24" 17.47 0.65 1.82 19.94 UNC-INV-South Trench DH12-1FE1218 South Trench Columns 39-40, DH12 1' EAST 12"-18" 18.90 0.70 1.47 21.07 UNC-INV-South Trench DH12-1FW06 South Trench Columns 39-40, DH12 1' WEST 0"-6" 513.54 19.02 2.27 534.83 UNC-INV-South Trench DH12-1FW612 South Trench Columns 39-40, DH12 1' WEST 6"-12" 405.27 15.01 2.23 422.51 UNC-INV-South Trench DH12-1FW1218 South Trench Columns 39-40, DH12 1' WEST 12"-18" 104.76 3.88 5.00 113.64 UNC-INV-South Trench DH12-06 South Trench Columns 39-40, DH12 0"-6" 393.66 14.58 2.49 410.73 UNC-INV-South Trench DH12-612 South Trench Columns 39-40, DH12 6"-12" 639.90 23.70 2.39 665.99 UNC-INV-South Trench DH12-1218 South Trench Columns 39-40, DH12 12"-18" 532.17 19.71 2.26 554.14 UNC-INV-South Trench DH12-1824 South Trench Columns 39-40, DH12 18"-24" 106.65 3.95 4.55 115.15 UNC-INV-South Trench DH12-1FS06 South Trench Columns 39-40, DH12 1' SOUTH 0"-6" 11.61 0.43 1.37 13.41 UNC-INV-South Trench DH12-1FS612 South Trench Columns 39-40, DH12 1' SOUTH 6"-12" 119.61 4.43 5.33 129.37 UNC-INV-South Trench DH12-1FS1218 South Trench Columns 39-40, DH12 1' SOUTH 12"-18" 20.84 0.77 2.01 23.63 UNC-INV-South Trench DH12-3FW06 South Trench Columns 39-40, DH12 3' WEST 0"-6" 100.71 3.73 3.86 108.30 UNC-INV-South Trench DH12-3FW612 South Trench Columns 39-40, DH12 3' WEST 6"-12" 261.90 9.70 1.70 273.30 UNC-INV-South Trench DH12-3FW1218 South Trench Columns 39-40, DH12 3' WEST 12"-18" 8.75 0.32 1.56 10.63 UNC-INV-South Trench DH12-4FW06 South Trench Columns 39-40, DH12 4' WEST 0"-6" 96.66 3.58 3.21 103.45 UNC-INV-South Trench DH12-4FW612 South Trench Columns 39-40, DH12 4' WEST 6"-12" 23.49 0.87 2.25 26.61 UNC-INV-South Trench DH12-2436 South Trench Columns 39-40, DH12 24"-36" 49.95 1.85 3.18 54.98 UNC-INV-DH3-001 (1)

South Trench Drainage Holes, Columns 1-5 6.48 0.24 2.11 8.83 UNC-INV-DH3-003 (1)

South Trench Drainage Holes, Columns 1-5 0.00 0.00 4.23 4.23 UNC-INV-DH3-004 (1)

South Trench Drainage Holes, Columns 1-5 0.00 0.00 2.54 2.54 UNC-INV-DH3-002-2 (1)

South Trench Drainage Holes, Columns 1-5 3.43 0.13 1.06 4.62