ML19114A184
Text
PBAPS UFSAR APPENDIX F F-i REV. 22, APRIL 2009 APPENDIX F - INTERACTION OF UNITS 2 AND 3 TABLE OF CONTENTS SECTION TITLE F.1
SUMMARY
DESCRIPTION F.2 SHARED SITE FACILITIES F.2.1 Facilities Shared Between Units 2 and 3 F.2.1.1 Communications F.2.1.2 Offices and Administration F.2.1.3 Shops, Laboratories, and Storerooms F.2.1.4 Cooling Water Intake and Discharge F.2.1.5 Control Room, Cable Spreading Room, and Turbine Hall F.2.1.6 Independent Spent Fuel Storage Installation (ISFSI)
F.3 SHARED SYSTEMS AND EQUIPMENT F.3.1 Criteria for Shared Systems and Equipment F.3.2 Systems Shared Between Units 2 and 3 F.3.2.1 Auxiliary Power System F.3.2.2 Standby Diesel Generators F.3.2.3 125/250 V Batteries F.3.2.4 Deleted F.3.2.5 Liquid and Solid Radioactive Waste Systems F.3.2.6 Gaseous Radioactive Waste F.3.3 Standby Gas Treatment System F.3.4 Service Water Systems F.3.5 Emergency Heat Sink F.3.6 Fuel Pool Filter-Demineralizer System F.3.7 Miscellaneous F.4 INTERACTION OF UNITS 2 AND 3 FOLLOWING AN ACCIDENT