OP 359, Field Activity Documentation CABRERA DAILY REPORT

1. PROJECT INFORMATION PROJECT NAME/LOCATION: SUPPLEMENTAL RADIOLOGICAL SURVEY Former UNC Manufacturing Facility, New Haven, CT DATE: 08/28/17 REPORT NO. 116 CONTRACT #:

CABRERA PROJECT #: 10-1007.00 TASK #: 016 FIELD SITE MANAGER: Mike Plonski PROJECT MANAGER: Rob Flowers

2. WEATHER TEMPERATURE RANGE: 57-76 degrees F WIND SPEED/DIRECTION: 5-15 mph E PRECIPITATION LAST 24 HOURS:

YES NO TYPE: NA AMOUNT: 0.00 BAROMETRIC PRESSURE: 30.04 HUMIDITY: 70-100%

HEAT INDEX RANGE: N/A WEATHER DELAYS:

YES NO DELAY TIME (HOURS): N/A

3.

SUMMARY

OF WORK Conducted safety meeting prior to beginning field activities.

Completed daily quality control checks on radiological counting instrumentation.

Completed wall/overhead surveys in of 3H.

Completed wall surveys in 6H south rooms including the chemistry labs.

Started overhead surveys in central corridor of 6H.

Site visit from R. Powell (NRC) and J. Semancik (CTDEEP).

Manifest waste shipping for final 7 IMCs.

Surveyed, labeled and prepped IMCs for shipping.

4. MATERIALS & EQUIPMENT BROUGHT ON-SITE Receipt inspection required & completed?

Yes No

5. INSPECTIONS TYPE DESCRIPTION ACTION PREPARATORY INITIAL FOLLOW-UP ARE ANY DEFICIENCIES NOTED IN FOLLOW-UP INSPECTIONS?

YES NO

6. DEFICIENCIES CORRECTED DEFICIENCY #

REPORT REFERENCE DESCRIPTION ACTION

7. TESTS PERFORMED SPECIFICATION REFERENCE TYPE TEST & RESULT ARE TEST RESULTS ATTACHED?

YES NO NA - IF NO, EXPLAIN:

8. CABRERA PERSONNEL ON-SITE EMPLOYEE NAME TITLE TASK(S) PERFORMED Mike Plonski SRSL/OSLM See Section 3 Summary of Work (8 Hrs)

Bethany Galivon HPT See Section 3 Summary of Work (8 Hrs)

Ginger Sparks HPT See Section 3 Summary of Work (8 Hrs)

Rob Gionfriddo HPT See Section 3 Summary of Work (8 Hrs)

Wade Fillingame WASTE BROKER See Section 3 Summary of Work (8 Hrs)

Al Craig HPT See Section 3 Summary of Work (8 Hrs)

9. SUBCONTRACTOR PERSONNEL ON-SITE SUBCONTRACTOR NAME JOB DUTY TASK(S) PERFORMED
  1. OF PERSONNEL MAN-HOURS TOTALS
10. EQUIPMENT & MATERIALS ON-SITE VENDOR EQUIPMENT SERIAL #.

ACTIVE OR IDLE DATE RECEIVED DATE RETURNED ERG 1 Ludlum 2360 scaler/rate meter with 43-93 Zinc sulphide scintillation probe 184909/

PR298426 Active 02/21/2017 ERG 1 Ludlum 2360 scaler/rate meter with 43-93 zinc sulphide scintillation probe 193638/

PR199836 Active 02/21/2017 ERG 1 Ludlum 2360 scaler/rate meter 220242 Active 02/21/2017 ERG 1 Ludlum 2221 scaler/ digital rate meter with FIDLER sodium iodide scintillation probe 190205/

PR01807D Active 02/21/2017 ERG 1 Ludlum 2929 scaler sample counter with 43-10-1 zinc sulphide scintillation probe 200051/

PR215948 Active 02/21/2017 ERG 1 Ludlum model 12 meter with 44-9 Geiger-Mueller probe 276863/

PR147787 Active 02/21/2017 ERG Escort ELF Lapel Air sampler A3-48588 02/21/2017 ERG 1 MircoRem meter 2079 02/21/2017 Cabrera 1 Th-230 check source 5648-06 Active 02/21/2017 Cabrera 1 Tc-99 check source 5634-05 Active 02/21/2017 Cabrera 1 Co-60 check source 267D21 Active 02/21/2017 Cabrera 1 Ludlum model 2224-1 scaler/rate meter with 43-93 Zinc sulphide scintillation probe 227246/

PR244549 Active 02/21/2017 Cabrera 1 Ludlum Model 3 rate meter with 44-9 Geiger-Mueller probe 219266/

PR Active 03/06/2017 Canberra Gamma Spectroscopy Instrument (Canberra REGe)

SN 8381 Active 02/21/2017 United Rentals 1 Bobcat T5 90 Skid Steer Active 02/21/2017 United Rentals 1 set of forks, and 1 grapple bucket for Skid Steer Active Williams Scotsman 1 8 by 20 connex box Active Cabrera 1 heater United Rentals 2 Scissor Lifts N80011/N8 9812 Active 8/14/2017

11. MATERIAL GENERATED/STORED ON-SITE MATERIAL ID SOLID, LIQUID, OR MIXED DESCRIPTION OF MATERIAL CONTAINER TYPE DISPOSITION OR LOCATION OF MATERIAL AMOUNT*

(CY OR TONS)

ERRU000312 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 3H

~12.34 Tons MHFU-002362 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 3H

~11.38 Tons GFLU002079 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~12.74 Tons GFLU-001032 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 3H

~11.26 Tons EERU-000310 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 3H

~12.09 Tons GFLU-001742 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 3H

~9.79 Tons GFLU-002123 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 3H

~10.93 Tons Totals

~80.53 Tons ATTACH SEPARATE PAGES AS NEEDED. SEPARATE PAGES INCLUDED?

YES NO

12. SAMPLE COLLECTION & ANALYSIS Sample ID/Spectrum ID Media (Soil Water, Other)

Sampler Initials On-Site or Off-Site Lab Analyses / Type Count time (min)

Does not include setup Photo File #

ATTACH SEPARATE PAGES AS NEEDED. SEPARATE PAGES INCLUDED?

YES NO

13. CHANGES/DELAYS/CONFLICTS ANY CHANGES IN SITE CONDITIONS OCCUR TODAY?

Yes No IF YES, EXPLAIN:

DID A DELAY OR WORK STOPPAGE OCCUR TODAY?

Yes No IF YES, EXPLAIN:

HAS ANYTHING DEVELOPED IN THE WORK WHICH MAY LEAD TO A CHANGE?

Yes No IF YES, EXPLAIN:

14. VERBAL INSTRUCTIONS RECEIVED:
15. HEALTH & SAFETY

SUMMARY

SAFETY BRIEFINGS WAS A SAFETY MEETING HELD?

YES NO TOPIC DISCUSSED: Slips-trips-falls, slippery conditions SAFETY INSPECTIONS WAS A SAFETY INSPECTION CONDUCTED?

YES NO DEFICIENCIES NOTED:

YES NO DESCRIBE:

CORRECTIVE ACTIONS TAKEN:

YES NO DESCRIBE:

SUMMARY

OF WORK PERFORMED TYPE OF WORK:

Refer to description provided in Section 3 CHEMICALS USED:

None PPE LEVEL:

Safety shoes, hard hats, and eye protection, safety vest INCIDENT & NEAR MISS/OBSERVATION REPORTING ANY INCIDENTS ON-SITE TODAY?

YES NO DESCRIPTION:

CABRERA INCIDENT REPORTING FORM ATTACHED:

YES NO CLIENT SPECIFIC INCIDENT REPORTING FORM ATTACHED:

YES NO ANY NEAR MISSES/OBSERVATIONS ON-SITE TODAY?

YES NO DESCRIPTION:

H&S RECOMMENDATIONS

16. REMARKS
17. VERIFICATION STATEMENT This report is complete and correct and all materials and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.

NAME/TITLE: Mike Plonski SIGNATURE:

DATE: 08/29/17 Mike Plonski Digitally signed by Mike Plonski DN: cn=Mike Plonski, o=Cabrera Services, ou, email=mplonski@cabreraservices.com

, c=US Date: 2017.08.29 12:28:32 -04'00'

18. PROJECT MANAGER REVIEW & ACCEPTANCE REMARKS AND/OR EXCEPTIONS TO REPORT:

ACCEPTANCE NAME/TITLE: Greg Bright, Deputy Project Manager SIGNATURE:

DATE: 08/29/17 Digitally signed by Gregory Bright DN: cn=Gregory Bright, o=Cabrera Services Inc., ou, email=gbright@cabreraservices.com, c=US Date: 2017.08.29 12:41:54 -04'00'

oP 555 -

7)3 craRERA SeRvlces fu(f,ei RAolOLo6lCAL. ENOINEEEING. REBEO!ATION SIX Ot E$TIONS FqR $UGCESS -Take two minutes to think through and ansvter these questions:

1.

VYhat are we about to do?

2.

L{r}at egubment are u.e goiRg to use?

3.

Have lAne been trained to use ttris equipnEnf?

4.

Have l ile been trainedto do thbjob?

5.

How can lrlne be hurt?

6.

Hoar can lA,rle pterrent this incident?

lfyouandyourteamaren'tprcparedtodotheassignedwo*,..,,:.;rr::.,:,,andtaketimetoprcperlyprepare.

This sign-in log documents the topics of the safety meeting and individual attendance. Personnel who perform work operations onsite are required to attend and acknowledge their ability to ask questions and receipt of such briefings daily. Please provide a brief narrative of the selected topics as applicable to the Project in the comment box (ex. Name of AHA reviewed).

PROJECT NAME & LOCATION

( lvtC - fl e*, t{ c,.,n-.r-r PROJECT NO.

tC " t c';1 *u DATE/TII$E6lzsltt I'VEATHER CONDITIONS 7 a') $u*ny Topic Discussion - check one Todafs Scopc ot Work {All tasks) p&s tr *a Schedule / New Work / Scope Changes I yes E nla Reviewed Procedures, AfdA, etc.

E yes EI r*a EmergencyA{:tion Plan & Proedures E fs E nla Communications Protocol tl yes E nla Required PPE E yes E nla Required Monitorir I lnstrunents

[J yes il Va Site Control / Work Zones I Seorrity E yes E nla Access I Egress I Slips, Trips, & Falls E yes fl nla Smoking, Eating, & Drinking El yes E n/a Wa$hroom I Facililies Location E yes [J rya l-leaUCold Stress E yes E nla ExdusionAreasBanicades/Cones Eyes Erra Required Permits, Passes, Keys, etc.

E yes I n/a Decon Procedurcs / lDl / h&mt, E yes E] nla Eqpmt. lnspectionslSafety Checklists E yes E] n/a OTHERICOiNMENTS:

Safety Meeting Attendees Print Name Safety Meeting Leader a

y'lA*rce F(*-sh.

Name of Meeting Leader