ML19095A024
Jump to navigation
Jump to search
Text
BUILDING 6H CENTER Upper Pipe Light Railing/ Wall Behind Railing Conduit Railing Ceiling Duct and Beam Braces and Railings 31 16 22 30 18 25 24 17 23 27 32 19 26 28 21 29 20 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 p
0 20 40 Scale (feet)
PROJECT No. 10-1007.00 10/2017 FIGURE 8-9 FORMER UNC FACILITY NEW HAVEN, CONNECTICUT ALPHA-BETA WALL/ CEILING SCAN SURVEY RESULTS Legend Wall/ Ceiling Scan Results (Alpha + Beta dpm/100 cm2)
< 99.9 100 - 2,499.9 2,500 - 4,999.9
> 5,000 Building 3H Building 6H Wall (Fold-out)
")
Building Columns Note: Survey performed with Ludlum 2360/ 43-37 and Ludlum 2360/ 43-93. All measurements are 1-min integrated scans.