ML19095A014
Text
3H 6H (Fabrication Shop) 6H ARGYLE STREET SHELTON AVENUE Figure 40 0714-02 Pipe Floor Debris Figure 41 0714-09 Wipe Sample Figure 38 0714-03 Floor Debris 6H Drum Room 0714-06 Floor Debris Figure 54 0714-01 Floor Debris Figure 74 0714-10 Wipe Sample X-Ray - SE Corner 0714-08 Floor Debris X-Ray - NW Corner 0714-07 Floor Debris 6H - In Front of Drum Room 0714-05 Floor Debris 6H - Car Area 0714-04 Floor Muck Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community 0
80 160 Scale (feet)
PROJECT No. 10-1007.00 10/2017 FIGURE 5-1 FORMER UNC FACILITY NEW HAVEN, CONNECTICUT BUILDING 3H/ 6H ACM ABATEMENT Legend ACM Abatement ACM Abatement Required ACM Abatement Not Required Existing Building Demolished Building p
Sample ID Sample Location Suspect Material Result 0714-01 Figure 54 Floor Debris None Detected 30% Chrysotile 10% Amosite 0714-03 Figure 38 Floor Debris 25% Chrysotile 0714-04 6H - Car Area Floor Muck 50% Chrysotile 0714-05 6H - In Front of Drum Room Floor Debris 75% Chrysotile 0714-06 6H - Drum Room Floor Debris 50% Chrysotile 0714-07 X-Ray - SE Corner Floor Debris 75% Chrysotile 0714-08 X-Ray - NW Corner Floor Debris 75% Chrysotile 0714-09 Figure 41 Wipe sample Asbestos Present 0714-10 Figure 74 Wipe sample Asbestos Present 0714-02 Figure 40 Pipe Floor Debris