OP 359, Field Activity Documentation CABRERA DAILY REPORT

1. PROJECT INFORMATION PROJECT NAME/LOCATION: SUPPLEMENTAL RADIOLOGICAL SURVEY Former UNC Manufacturing Facility, New Haven, CT DATE: 05/09/17 REPORT NO. 055 CONTRACT #:

CABRERA PROJECT #: 10-1007.00 TASK #: 016 FIELD SITE MANAGER: Mike Plonski PROJECT MANAGER: Rob Flowers

2. WEATHER TEMPERATURE RANGE: 36-60 degrees F WIND SPEED/DIRECTION: 5-15 mph E PRECIPITATION LAST 24 HOURS:

YES NO TYPE:

AMOUNT:

BAROMETRIC PRESSURE: 29.92 HUMIDITY: 50-100%

HEAT INDEX RANGE: N/A WEATHER DELAYS:

YES NO DELAY TIME (HOURS): N/A

3.

SUMMARY

OF WORK Conducted safety meeting prior to beginning field activities.

Cabrera completed daily quality control checks on gamma spec and other radiological counting instrumentation.

Cabrera continued to provide radiological support during ACM abatement activities, including air monitoring and general contamination control monitoring.

Moved cars from east end of 3H to central area in 6H that was already surveyed in preparation of abatement.

Sample counting in on-site laboratory.

Drum surveys.

4. MATERIALS & EQUIPMENT BROUGHT ON-SITE Receipt inspection required & completed?

Yes No

5. INSPECTIONS TYPE DESCRIPTION ACTION PREPARATORY INITIAL FOLLOW-UP ARE ANY DEFICIENCIES NOTED IN FOLLOW-UP INSPECTIONS?

YES NO

6. DEFICIENCIES CORRECTED DEFICIENCY #

REPORT REFERENCE DESCRIPTION ACTION

7. TESTS PERFORMED SPECIFICATION REFERENCE TYPE TEST & RESULT ARE TEST RESULTS ATTACHED?

YES NO NA - IF NO, EXPLAIN:

8. CABRERA PERSONNEL ON-SITE EMPLOYEE NAME TITLE TASK(S) PERFORMED Mike Plonski Site Radiation Safety Lead (SRSL)

See Section 3 Summary of Work (8 Hrs)

Jon Cote HP TECH See Section 3 Summary of Work (8 Hrs)

9. SUBCONTRACTOR PERSONNEL ON-SITE SUBCONTRACTOR NAME JOB DUTY TASK(S) PERFORMED
  1. OF PERSONNEL MAN-HOURS AIG Asbestos abatement Asbestos abatement 2

16 TOTALS 2

16

10. EQUIPMENT & MATERIALS ON-SITE VENDOR EQUIPMENT SERIAL #.

ACTIVE OR IDLE DATE RECEIVED DATE RETURNED ERG 1 Ludlum 2360 scaler/rate meter with 43-93 Zinc sulphide scintillation probe 184909/

PR298426 Active 02/21/2017 ERG 1 Ludlum 2360 scaler/rate meter with 43-93 zinc sulphide scintillation probe 193638/

PR199836 Active 02/21/2017 ERG 1 Ludlum 2360 scaler/rate meter 220242 Active 02/21/2017 ERG 1 Ludlum 2221 scaler/ digital rate meter with FIDLER sodium iodide scintillation probe 190205/

PR01807D Active 02/21/2017 ERG 1 Ludlum 2929 scaler sample counter with 43-10-1 zinc sulphide scintillation probe 200051/

PR215948 Active 02/21/2017 ERG 1 Ludlum model 12 meter with 44-9 Geiger-Mueller probe 276863/

PR147787 Active 02/21/2017 ERG Escort ELF Lapel Air sampler A3-48588 02/21/2017 ERG 1 MircoRem meter 2079 02/21/2017 ERG 1 Low volume air sampler 02/21/2017 ERG 1 Low volume air sampler 02/21/2017 Cabrera 1 Th-230 check source 5648-06 Active 02/21/2017 Cabrera 1 Tc-99 check source 5634-05 Active 02/21/2017 Cabrera 1 Co-60 check source 267D21 Active 02/21/2017 Cabrera 1 Ludlum model 2224-1 scaler/rate meter with 43-93 Zinc sulphide scintillation probe 227246/

PR244549 Active 02/21/2017 Cabrera 1 Ludlum Model 3 rate meter with 44-9 Geiger-Mueller probe 219266/

PR Active 02/21/2017 Canberra Gamma Spectroscopy Instrument (Canberra REGe)

SN 8381 Active 03/06/2017 United Rentals 1 Bobcat T5 90 Skid Steer Active 02/21/2017 United Rentals 1 set of forks, and 1 grapple bucket for Skid Steer Active 02/21/2017 United Rentals 1 Magnum 130 tow behind generator 02/21/2017 NEMF Wheel Scale 02/21/2017 Williams Scotsman 1 8 by 20 connex box Active 06/22/2016 United Rentals Scaffold 03/23/2017 United Rentals 1 heater 03/23/2017

11. MATERIAL GENERATED/STORED ON-SITE MATERIAL ID SOLID, LIQUID, OR MIXED DESCRIPTION OF MATERIAL CONTAINER TYPE DISPOSITION OR LOCATION OF MATERIAL AMOUNT*

(CY OR TONS)

BFLU000011 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~12.35 Tons GFLU001451 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~10.05 Tons GFLU002120 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~ 12.4Tons GFLU002008 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~12.09 Tons GFLU001483 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~12.93 Tons GFLU002198 solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~7.83 Tons BFLU000074 solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~7.81 Tons ERRU000226 solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~7.34 Tons ERRU000312 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 3H

~8 Tons MHFU-002362 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 3H

~8 Tons GFLU-002165 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 3H

~8 Tons GFLU-002002 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 3H

~8 Tons GFLU002079 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~12.74 Tons Totals

~127.54 Tons ATTACH SEPARATE PAGES AS NEEDED. SEPARATE PAGES INCLUDED?

YES NO

12. SAMPLE COLLECTION & ANALYSIS Sample ID/Spectrum ID Media (Soil Water, Other)

Sampler Initials On-Site or Off-Site Lab Analyses / Type Count time (min)

Does not include setup Photo File #

ATTACH SEPARATE PAGES AS NEEDED. SEPARATE PAGES INCLUDED?

YES NO

13. CHANGES/DELAYS/CONFLICTS ANY CHANGES IN SITE CONDITIONS OCCUR TODAY?

Yes No IF YES, EXPLAIN:

DID A DELAY OR WORK STOPPAGE OCCUR TODAY?

Yes No IF YES, EXPLAIN:

HAS ANYTHING DEVELOPED IN THE WORK WHICH MAY LEAD TO A CHANGE?

Yes No IF YES, EXPLAIN:

14. VERBAL INSTRUCTIONS RECEIVED:
15. HEALTH & SAFETY

SUMMARY

SAFETY BRIEFINGS WAS A SAFETY MEETING HELD?

YES NO TOPIC DISCUSSED: PPE, machine safety (skid steer, scissor lift), slips-trips-falls, slippery conditions SAFETY INSPECTIONS WAS A SAFETY INSPECTION CONDUCTED?

YES NO DEFICIENCIES NOTED:

YES NO DESCRIBE:

CORRECTIVE ACTIONS TAKEN:

YES NO DESCRIBE:

SUMMARY

OF WORK PERFORMED TYPE OF WORK:

Refer to description provided in Section 3 CHEMICALS USED:

None PPE LEVEL:

Safety shoes, hard hats, and eye protection, safety vest INCIDENT & NEAR MISS/OBSERVATION REPORTING ANY INCIDENTS ON-SITE TODAY?

YES NO DESCRIPTION:

CABRERA INCIDENT REPORTING FORM ATTACHED:

YES NO CLIENT SPECIFIC INCIDENT REPORTING FORM ATTACHED:

YES NO ANY NEAR MISSES/OBSERVATIONS ON-SITE TODAY?

YES NO DESCRIPTION:

H&S RECOMMENDATIONS

16. REMARKS
17. VERIFICATION STATEMENT This report is complete and correct and all materials and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.

NAME/TITLE: Mike Plonski SIGNATURE:

DATE: 05/10/17

18. PROJECT MANAGER REVIEW & ACCEPTANCE REMARKS AND/OR EXCEPTIONS TO REPORT:

ACCEPTANCE NAME/TITLE: Greg Bright, Deputy Project Manager SIGNATURE:

DATE: 05/10/17 for Greg Bright mplonski@cabr eraservices.com Digitally signed by mplonski@cabreraservices.com DN:

cn=mplonski@cabreraservices.com Date: 2017.05.10 13:22:51 -04'00' Digitally signed by Robert E. Flowers DN: cn=Robert E. Flowers, o=Cabrera Services Inc.,

ou=Corporate, email=rflowers@cabreraservices.co m, c=US Date: 2017.05.10 13:47:06 -04'00'

PHOTOS Central portion of 3H pre abatement Central portion of 3H post abatement

. ilau.olo3lcAL

' EEG'tsER'H9' Fq:O:AiOI SlX OUESTIONS FOi SUCCESS - Take tri,o minutes to thiok through and ansrrrer these quesilons:

'1, What are rre about to do?

2.

what equipmerrt are ure going to use?

3.

Have lrure ben trained to use this equiPmsnt?

4.

Have lAar been trained io do thisiob?

5.

How cen lAre be hurt?

6, How can lfur prevent thts incident?

lf you and your taam aten,t pnparcd to do tie asslgned wor*, S'r. OP,it)t-lr(, and ta*e ttme to poperly preqare, This sign-in log doementE ths toplcs of the safety me.sting and lrdlvir,ual etondence. Petsonnelwho perform work operetions onsite ere required lo attend and acknowledge thetr abllity to ask quesfions and rceipt of such briefings daily. Ptease provide a briel nanative of the selecied loplcs q9 appllcable to the proiect h the cofiment box (ex, Name of AHA reviewed).

PROJECT NAME & LOEATON UNC New Haven, New Haven, CT PR.OJECT NO.

10-1007.00 DATETIilE 6-1^ tl s-7oa WEATHER COTTOITIONS Clnudo +al Topic OJecugslon - clreck one Today's Scope of Work (Au tasks) 6es fl nta Scheduls / New Work / Scope Changes E yes E nla Reviewed Procedures, AHA, etc.

E yes fl n/a Emergency Action Ptan & Procedures fl yes Q nla Communications Prolocol I yes f] n/a Required PPE Q yes I n/a ilequired Monitodng / lnstruments E yes E n/a Site Conlrol / Work Zones / Security E yes E n/a Aqbss / Egress / Slips, Trips, & Falls E yes O n/a Smoking, Eating, & Orinking E yes Q nla Washroom I Facilities Location E yes E n/a HeaUCold Slress El yes E n/a Exclusion Areas Banicades rr Cones E yes fl n/a Required Permils, Pass6s, Keys, etc.

El yes I n/a Decon Procedures / IDW Mgmt.

E yes D n/a Eqpmt. lnspections/Safely Chcklists E yes E] n/a OTHER/COMMENTS:

Safety tleetlng Attendees Prlnt Name Safety Meetlns Leader

';;lt

-1 :l r'!