Appendix H, Daily Report - UNC_Daily_Report_050_20170502
ML19098A075
Person / Time
Site: 07000371
Issue date: 03/01/2018
From:
Cabrera Services
To:
NRC Region 1
Shared Package
ml051740240 List: ... further results
References
Download: ML19098A075 (10)


Text

OP 359, Field Activity Documentation CABRERA DAILY REPORT

1. PROJECT INFORMATION PROJECT NAME/LOCATION: SUPPLEMENTAL RADIOLOGICAL SURVEY Former UNC Manufacturing Facility, New Haven, CT DATE: 05/02/17 REPORT NO. 050 CONTRACT #:

CABRERA PROJECT #: 10-1007.00 TASK #: 016 FIELD SITE MANAGER: Mike Plonski PROJECT MANAGER: Rob Flowers

2. WEATHER TEMPERATURE RANGE: 43-77 degrees F WIND SPEED/DIRECTION: 5-40 mph E PRECIPITATION LAST 24 HOURS:

YES NO TYPE:

AMOUNT:

BAROMETRIC PRESSURE: 30.07 HUMIDITY: 50-100%

HEAT INDEX RANGE: N/A WEATHER DELAYS:

YES NO DELAY TIME (HOURS): N/A

3.

SUMMARY

OF WORK Conducted safety meeting prior to beginning field activities.

Cabrera completed daily quality control checks on gamma spec and other radiological counting instrumentation.

Cabrera continued to provide radiological support during ACM abatement activities, including air monitoring and general contamination control monitoring.

AIG continued abatement in containment #7 in the western portion of Bldg. 3H Floor survey of western portion of 6H. Survey of drums and larger debris items.

Fence contractor on-site for door quote.

4. MATERIALS & EQUIPMENT BROUGHT ON-SITE Receipt inspection required & completed?

Yes No

5. INSPECTIONS TYPE DESCRIPTION ACTION PREPARATORY INITIAL FOLLOW-UP ARE ANY DEFICIENCIES NOTED IN FOLLOW-UP INSPECTIONS?

YES NO

6. DEFICIENCIES CORRECTED DEFICIENCY #

REPORT REFERENCE DESCRIPTION ACTION

7. TESTS PERFORMED SPECIFICATION REFERENCE TYPE TEST & RESULT ARE TEST RESULTS ATTACHED?

YES NO NA - IF NO, EXPLAIN:

8. CABRERA PERSONNEL ON-SITE EMPLOYEE NAME TITLE TASK(S) PERFORMED Mike Plonski Site Radiation Safety Lead (SRSL)

See Section 3 Summary of Work (8 Hrs)

Mark Mihalo HP Tech See Section 3 Summary of Work (8 Hrs)

Jon Cote HP Tech See Section 3 Summary of Work (8 Hrs)

9. SUBCONTRACTOR PERSONNEL ON-SITE SUBCONTRACTOR NAME JOB DUTY TASK(S) PERFORMED
  1. OF PERSONNEL MAN-HOURS AIG Asbestos abatement Asbestos abatement 5

40 TOTALS 5

40

10. EQUIPMENT & MATERIALS ON-SITE VENDOR EQUIPMENT SERIAL #.

ACTIVE OR IDLE DATE RECEIVED DATE RETURNED ERG 1 Ludlum 2360 scaler/rate meter with 43-93 Zinc sulphide scintillation probe 184909/

PR298426 Active 02/21/2017 ERG 1 Ludlum 2360 scaler/rate meter with 43-93 zinc sulphide scintillation probe 193638/

PR199836 Active 02/21/2017 ERG 1 Ludlum 2360 scaler/rate meter 220242 Active 02/21/2017 ERG 1 Ludlum 2221 scaler/ digital rate meter with FIDLER sodium iodide scintillation probe 190205/

PR01807D Active 02/21/2017 ERG 1 Ludlum 2929 scaler sample counter with 43-10-1 zinc sulphide scintillation probe 200051/

PR215948 Active 02/21/2017 ERG 1 Ludlum model 12 meter with 44-9 Geiger-Mueller probe 276863/

PR147787 Active 02/21/2017 ERG Escort ELF Lapel Air sampler A3-48588 02/21/2017 ERG 1 MircoRem meter 2079 02/21/2017 ERG 1 Low volume air sampler 02/21/2017 ERG 1 Low volume air sampler 02/21/2017 Cabrera 1 Th-230 check source 5648-06 Active 02/21/2017 Cabrera 1 Tc-99 check source 5634-05 Active 02/21/2017 Cabrera 1 Co-60 check source 267D21 Active 02/21/2017 Cabrera 1 Ludlum model 2224-1 scaler/rate meter with 43-93 Zinc sulphide scintillation probe 227246/

PR244549 Active 02/21/2017 Cabrera 1 Ludlum Model 3 rate meter with 44-9 Geiger-Mueller probe 219266/

PR Active 02/21/2017 Canberra Gamma Spectroscopy Instrument (Canberra REGe)

SN 8381 Active 03/06/2017 United Rentals 1 Bobcat T5 90 Skid Steer Active 02/21/2017 United Rentals 1 set of forks, and 1 grapple bucket for Skid Steer Active 02/21/2017 United Rentals 1 Magnum 130 tow behind generator 02/21/2017 NEMF Wheel Scale 02/21/2017 Williams Scotsman 1 8 by 20 connex box Active 06/22/2016 United Rentals Scaffold 03/23/2017 United Rentals 1 heater 03/23/2017

11. MATERIAL GENERATED/STORED ON-SITE MATERIAL ID SOLID, LIQUID, OR MIXED DESCRIPTION OF MATERIAL CONTAINER TYPE DISPOSITION OR LOCATION OF MATERIAL AMOUNT*

(CY OR TONS)

BFLU000011 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~12.35 Tons GFLU001451 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~10.05 Tons GFLU002120 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~ 12.4Tons GFLU002008 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~12.09 Tons GFLU001483 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~12.93 Tons GFLU002198 solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~7.83 Tons BFLU000074 solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~7.81 Tons ERRU000226 solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~7.34 Tons ERRU000312 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~8 Tons GFLU002079 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~12.74 Tons Totals

~103.54 Tons ATTACH SEPARATE PAGES AS NEEDED. SEPARATE PAGES INCLUDED?

YES NO

12. SAMPLE COLLECTION & ANALYSIS Sample ID/Spectrum ID Media (Soil Water, Other)

Sampler Initials On-Site or Off-Site Lab Analyses / Type Count time (min)

Does not include setup Photo File #

ATTACH SEPARATE PAGES AS NEEDED. SEPARATE PAGES INCLUDED?

YES NO

13. CHANGES/DELAYS/CONFLICTS ANY CHANGES IN SITE CONDITIONS OCCUR TODAY?

Yes No IF YES, EXPLAIN:

DID A DELAY OR WORK STOPPAGE OCCUR TODAY?

Yes No IF YES, EXPLAIN:

HAS ANYTHING DEVELOPED IN THE WORK WHICH MAY LEAD TO A CHANGE?

Yes No IF YES, EXPLAIN:

14. VERBAL INSTRUCTIONS RECEIVED:
15. HEALTH & SAFETY

SUMMARY

SAFETY BRIEFINGS WAS A SAFETY MEETING HELD?

YES NO TOPIC DISCUSSED: PPE, machine safety (skid steer, scissor lift), slips-trips-falls, slippery conditions SAFETY INSPECTIONS WAS A SAFETY INSPECTION CONDUCTED?

YES NO DEFICIENCIES NOTED:

YES NO DESCRIBE:

CORRECTIVE ACTIONS TAKEN:

YES NO DESCRIBE:

SUMMARY

OF WORK PERFORMED TYPE OF WORK:

Refer to description provided in Section 3 CHEMICALS USED:

None PPE LEVEL:

Safety shoes, hard hats, and eye protection, safety vest INCIDENT & NEAR MISS/OBSERVATION REPORTING ANY INCIDENTS ON-SITE TODAY?

YES NO DESCRIPTION:

CABRERA INCIDENT REPORTING FORM ATTACHED:

YES NO CLIENT SPECIFIC INCIDENT REPORTING FORM ATTACHED:

YES NO ANY NEAR MISSES/OBSERVATIONS ON-SITE TODAY?

YES NO DESCRIPTION:

H&S RECOMMENDATIONS

16. REMARKS
17. VERIFICATION STATEMENT This report is complete and correct and all materials and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.

NAME/TITLE: Mike Plonski SIGNATURE:

DATE: 05/3/17

18. PROJECT MANAGER REVIEW & ACCEPTANCE REMARKS AND/OR EXCEPTIONS TO REPORT:

ACCEPTANCE NAME/TITLE: Greg Bright, Deputy Project Manager SIGNATURE:

DATE: 05/3/17 mplonski@cabr eraservices.com Digitally signed by mplonski@cabreraservices.com DN:

cn=mplonski@cabreraservices.com Date: 2017.05.03 08:46:01 -04'00'

PHOTOS Truck after contacting the door.

The door after contact with the truck.

Bottom boards were previously broken and repaired prior to Cabrera being on-site.

OP 555 - Safety Meetings r11 g *E.BE F"s-F""=*F Y.r*c. "Ht, SIX QUESTIONS FOR SUCCESS - Take two minutes to think through and ansuer these questions:

1.

What are we about to do?

2.

What equipment are rrve going to use?

3.

Have l/we been trained to use this equipment?

4.

Have tlwe been trained to do this job?

5.

How can lrlre be hurt?

6.

How can lArre prevent this incident?

lf you and your teem aten't prcpared to do the asslgned wo*,.SIOfi lyOJ:tiC and take time to property prcparc.

This sign-in log documents the topics of the safety meeting and individuat attendance. Personnal who perform work operations onsite are required to attend and acknowledge their abllity to ask questlons and receipt of such briefngs daily. Please provide a brief narrative of the selecied topics as ?pplicabte to lhe Proiecl in lhe comment box (ex. Name of AHA reviewed).

PROJECT NAi'E & LOCATION UNC New Haven, New Haven, CT PROJECT NO.

10-1007.00 WEATHER CONDITIONS CJ{ tU.*97.t-,r.,} y' 7Ot' DATE/NME,

A g/"a/ r z Topic Discusslon-checkooe Today's Scope of Work (All tasks)

ElGs E nla Schedule 1 New Work I Scope Changes fl yes El nta Reviewed Procdures, AHA, etc.

E yes E n/a Emergency Action Plan & Procedures E yes E nla Communications Prolocol E yes E nla Required PPE E yes E da Required Monitoring / lnstruments tl yes E n/a Sile Control / Work Zones / Security t] yes E nla Rqbss I Egress / Slips, Trips, & Falls E yes fl n/a Smoking, Eating, & Orinking E yes I nla Washroom / Facilities Location E yes E n/a HeaUCold Stress E yes I nta Exclusion Areas Barricades / Cones El yes E nia Required Permits, Passes, Keys, etc.

fl yes E n/a Decon Pr@edures / IDW Mgmt.

fl yes fl n/a Eqpmt. lnspeclionslSafety Checklists E yes E nla OTHERYCOMMENTS:

Safety i/lgeting Attendees Safety Meeting Leader /

v lh,k< ?(*-"<.,

Name of Meeting Leader Print Name

OP 555 - Safety Meetings CRsRsRn Senvtces R^DroLo61c.L.

Etct!aa,xG.

RvDialio!