OP 359, Field Activity Documentation CABRERA DAILY REPORT

1. PROJECT INFORMATION PROJECT NAME/LOCATION: SUPPLEMENTAL RADIOLOGICAL SURVEY Former UNC Manufacturing Facility, New Haven, CT DATE: 04/4/17 REPORT NO. 030 CONTRACT #:

CABRERA PROJECT #: 10-1007.00 TASK #: 016 FIELD SITE MANAGER: Mike Plonski PROJECT MANAGER: Rob Flowers

2. WEATHER TEMPERATURE RANGE: 35-45 degrees F WIND SPEED/DIRECTION: 5-30 mph E PRECIPITATION LAST 24 HOURS:

YES NO TYPE: RAIN AMOUNT: 1.86 BAROMETRIC PRESSURE: 30.03 HUMIDITY: 70-100%

HEAT INDEX RANGE: N/A WEATHER DELAYS:

YES NO DELAY TIME (HOURS): N/A

3.

SUMMARY

OF WORK Conducted safety meeting prior to beginning field activities.

AIG continued abatement in the fifth containment.

Cabrera completed daily quality control checks on gamma spec and other radiological counting instrumentation.

Cabrera continued to provide radiological support during ACM abatement activities, including air monitoring and general contamination control monitoring.

Brightfields environmental completed inventory and packaging of waste chemical drums.

4. MATERIALS & EQUIPMENT BROUGHT ON-SITE Receipt inspection required & completed?

Yes No

5. INSPECTIONS TYPE DESCRIPTION ACTION PREPARATORY INITIAL FOLLOW-UP ARE ANY DEFICIENCIES NOTED IN FOLLOW-UP INSPECTIONS?

YES NO - IF YES, EXPLAIN:

6. DEFICIENCIES CORRECTED DEFICIENCY #

REPORT REFERENCE DESCRIPTION ACTION

7. TESTS PERFORMED SPECIFICATION REFERENCE TYPE TEST & RESULT ARE TEST RESULTS ATTACHED?

YES NO NA - IF NO, EXPLAIN:

8. CABRERA PERSONNEL ON-SITE EMPLOYEE NAME TITLE TASK(S) PERFORMED Mike Plonski Site Radiation Safety Lead (SRSL)

See Section 3 Summary of Work (8 Hrs)

Jon Cote HP Tech See Section 3 Summary of Work (8 Hrs)

9. SUBCONTRACTOR PERSONNEL ON-SITE SUBCONTRACTOR NAME JOB DUTY TASK(S) PERFORMED
  1. OF PERSONNEL MAN-HOURS AIG Asbestos abatement Asbestos abatement 8

56 BRIGHTFIELDS Chemical drum waste Overpack and inventory of drums 2

16 TOTALS 10 72

10. EQUIPMENT & MATERIALS ON-SITE VENDOR EQUIPMENT SERIAL #.

ACTIVE OR IDLE DATE RECEIVED DATE RETURNED ERG 1 Ludlum 2360 scaler/rate meter with 43-93 Zinc sulphide scintillation probe 184909/

PR298426 Active 02/21/2017 ERG 1 Ludlum 2360 scaler/rate meter with 43-93 zinc sulphide scintillation probe 193638/

PR199836 Active 02/21/2017 ERG 1 Ludlum 2360 scaler/rate meter 220242 Active 02/21/2017 ERG 1 Ludlum 2221 scaler/ digital rate meter with FIDLER sodium iodide scintillation probe 190205/

PR01807D Active 02/21/2017 ERG 1 Ludlum 2929 scaler sample counter with 43-10-1 zinc sulphide scintillation probe 200051/

PR215948 Active 02/21/2017 ERG 1 Ludlum model 12 meter with 44-9 Geiger-Mueller probe 276863/

PR147787 Active 02/21/2017 ERG Escort ELF Lapel Air sampler A3-48588 02/21/2017 ERG 1 MircoRem meter 2079 02/21/2017 ERG 1 Low volume air sampler 02/21/2017 ERG 1 Low volume air sampler 02/21/2017 Cabrera 1 Th-230 check source 5648-06 Active 02/21/2017 Cabrera 1 Tc-99 check source 5634-05 Active 02/21/2017 Cabrera 1 Co-60 check source 267D21 Active 02/21/2017 Cabrera 1 Ludlum model 2224-1 scaler/rate meter with 43-93 Zinc sulphide scintillation probe 227246/

PR244549 Active 02/21/2017 Cabrera 1 Ludlum Model 3 rate meter with 44-9 Geiger-Mueller probe 219266/

PR Active 02/21/2017 Canberra Gamma Spectroscopy Instrument (Canberra REGe)

SN 8381 Active 03/06/2017 United Rentals 1 Bobcat T5 90 Skid Steer Active 02/21/2017 United Rentals 1 set of forks, and 1 grapple bucket for Skid Steer Active 02/21/2017 United Rentals 1 Magnum 130 tow behind generator 02/21/2017 NEMF Wheel Scale 02/21/2017 Williams Scotsman 1 8 by 20 connex box Active 06/22/2016 United Rentals Scaffold 03/23/2017 United Rentals 2 heaters 03/23/2017

11. MATERIAL GENERATED/STORED ON-SITE MATERIAL ID SOLID, LIQUID, OR MIXED DESCRIPTION OF MATERIAL CONTAINER TYPE DISPOSITION OR LOCATION OF MATERIAL AMOUNT*

(CY OR TONS)

BFLU000011 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~8 Tons GFLU001451 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~8 Tons GFLU002021 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~8 Tons GFLU002008 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~8 Tons GFLU002079 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~8 Tons Totals

~40 Tons ATTACH SEPARATE PAGES AS NEEDED. SEPARATE PAGES INCLUDED?

YES NO

12. SAMPLE COLLECTION & ANALYSIS Sample ID/Spectrum ID Media (Soil Water, Other)

Sampler Initials On-Site or Off-Site Lab Analyses / Type Count time (min)

Does not include setup Photo File #

ATTACH SEPARATE PAGES AS NEEDED. SEPARATE PAGES INCLUDED?

YES NO

13. CHANGES/DELAYS/CONFLICTS ANY CHANGES IN SITE CONDITIONS OCCUR TODAY?

Yes No IF YES, EXPLAIN:

DID A DELAY OR WORK STOPPAGE OCCUR TODAY?

Yes No IF YES, EXPLAIN:

HAS ANYTHING DEVELOPED IN THE WORK WHICH MAY LEAD TO A CHANGE?

Yes No IF YES, EXPLAIN:

14. VERBAL INSTRUCTIONS RECEIVED:
15. HEALTH & SAFETY

SUMMARY

SAFETY BRIEFINGS WAS A SAFETY MEETING HELD?

YES NO TOPIC DISCUSSED: PPE, machine safety (skid steer, scissor lift), slips-trips-falls, slippery conditions SAFETY INSPECTIONS WAS A SAFETY INSPECTION CONDUCTED?

YES NO DEFICIENCIES NOTED:

YES NO DESCRIBE:

CORRECTIVE ACTIONS TAKEN:

YES NO DESCRIBE:

SUMMARY

OF WORK PERFORMED TYPE OF WORK:

Refer to description provided in Section 3 CHEMICALS USED:

None PPE LEVEL:

Safety shoes, hard hats, and eye protection, safety vest INCIDENT & NEAR MISS/OBSERVATION REPORTING ANY INCIDENTS ON-SITE TODAY?

YES NO DESCRIPTION:

CABRERA INCIDENT REPORTING FORM ATTACHED:

YES NO CLIENT SPECIFIC INCIDENT REPORTING FORM ATTACHED:

YES NO ANY NEAR MISSES/OBSERVATIONS ON-SITE TODAY?

YES NO DESCRIPTION:

H&S RECOMMENDATIONS

16. REMARKS Rain today has delayed the ability to survey the floors; floor surveys cannot occur until floors are dry.

Call to discuss plan for items found in East Haven residence. Meeting between stakeholders was held and will again be discussed in bi-weekly call on 4/5.

A fuel smell was detected in the drum room of Bldg 6H. AIG stopped work and Brightfields investigated.

No liquids were encountered and no elevated readings were detected;the smell was determined to be a result of residual venting from drums that have not been moved in years. As a precaution, AIG will add organic vapor protection to the cartridge stack in their respirators when working around the drums.

17. VERIFICATION STATEMENT This report is complete and correct and all materials and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.

NAME/TITLE: Mike Plonski SIGNATURE:

DATE: 04/05/17

18. PROJECT MANAGER REVIEW & ACCEPTANCE REMARKS AND/OR EXCEPTIONS TO REPORT:

ACCEPTANCE NAME/TITLE: Rob Flowers, Project Manager SIGNATURE:

DATE: 04/05/17 mplonski@cabr eraservices.com Digitally signed by mplonski@cabreraservices.com DN:

cn=mplonski@cabreraservices.com Date: 2017.04.05 15:58:03 -04'00' Digitally signed by Gregory Bright DN: cn=Gregory Bright, o=Cabrera Services Inc., ou, email=gbright@cabreraservices.com, c=US Date: 2017.04.05 16:03:06 -04'00'

OP 555 - Safety Meetings 41. g *g,Ts F*" gfi r Yi.gfi.s. -

StX QUESTIONS FOR SUCCESS - Take two minutes to think through and answer these questions:

1.

What are we about to do?

2.

What equipment are we going to use?

3.

Have llwe been trained to use this equipment?

4.

Have l/we been trained to do this job?

5.

How can l^ile be hurt?

6.

How can llwe prevent this incident?

lf you and your team aran't prcpared to do tlrc asslgned wotl<, STAP ViARK, and take time to properly prcparc.

This sign-in log documents the topics of the safety meeting and indivt,ual attendance. Personnel who perform work operations onsile are required to attend and acknowledge their ability to ask questions and receipt of such briefings daily. Please provide a brief narrative of the seleted topics as applicable to the Project in the comment box (ex. Name of AHA reviewed).

]JECT NAME & LOCATION UNC New Haven, New Haven, CT PROJECT NO.

10-1007.00 DATE/TIME q-L{- 1?

a 7@

WEATHER CONDITIOHS

&nin /,i*a>

Topic Discussron-checkone Today'sScopeofwork(Alltasks) dyes Enla Schedule / New Work / Scope Changes E yes B n/a Reviewed Procedures, AFA, etc.

E yes fl n/a Emergency Aclion Plan & Procedures E yes E nla Communications Prolocol E yes E n/a Required PPE E yes fl n/a Required Monitoring I lnstruments EI yes E] n/a Site Control I Work Zones / Security fi yes I n/a Aciess / Egress / Slips, Trips, & Falls E yes D n/a Smoking, Eating, & Drinking El yes D n/a Washroom / Facilities Location E yes E n/a HeaUCold Stress E yes I n/a Exclusion Areas Banicades / Cones E yes I n/a Required Permits, Passes, Keys, etc.

E yes E n/a Decon Procedures / IDW Mgmt.

E yes fl n/a Eqpmt. lnspections/Safety Checklists E yes fl n/a OTHER/COMMENTS:

Safety Meeting Attendees Prlnt Name J.,'. A C *1t-

. / Signature

-(ff Safety Meeting Leader

{Y tl,,-? 1a... st.

/t Signatd Name of Meeting Leader