Appendix H, Daily Reports - UNC_Daily_Report_027_20170330
ML19098A051
Person / Time
Site: 07000371
Issue date: 03/01/2018
From:
Cabrera Services
To:
NRC Region 1
Shared Package
ml051740240 List: ... further results
References
Download: ML19098A051 (10)


Text

OP 359, Field Activity Documentation CABRERA DAILY REPORT

1. PROJECT INFORMATION PROJECT NAME/LOCATION: SUPPLEMENTAL RADIOLOGICAL SURVEY Former UNC Manufacturing Facility, New Haven, CT DATE: 03/30/17 REPORT NO. 027 CONTRACT #:

CABRERA PROJECT #: 10-1007.00 TASK #: 016 FIELD SITE MANAGER: Mike Plonski PROJECT MANAGER: Rob Flowers

2. WEATHER TEMPERATURE RANGE: 33-48 degrees F WIND SPEED/DIRECTION: 6-14 mph W PRECIPITATION LAST 24 HOURS:

YES NO TYPE: N/A AMOUNT: N/A BAROMETRIC PRESSURE: 30.19 HUMIDITY: 32-70%

HEAT INDEX RANGE: N/A WEATHER DELAYS:

YES NO DELAY TIME (HOURS): N/A

3.

SUMMARY

OF WORK Conducted safety meeting prior to beginning field activities.

AIG continued construction of the fifth containment.

Cabrera completed daily quality control checks on gamma spec and other radiological counting instrumentation.

Cabrera continued to provide radiological support during ACM abatement activities, including air monitoring and general contamination control monitoring.

Cabrera counted two samples for IMC 2079. Results pending review.

Cabrera completed moving the cars from in the building to the back of the building.

4. MATERIALS & EQUIPMENT BROUGHT ON-SITE Receipt inspection required & completed?

Yes No

5. INSPECTIONS TYPE DESCRIPTION ACTION PREPARATORY INITIAL FOLLOW-UP ARE ANY DEFICIENCIES NOTED IN FOLLOW-UP INSPECTIONS?

YES NO - IF YES, EXPLAIN:

6. DEFICIENCIES CORRECTED DEFICIENCY #

REPORT REFERENCE DESCRIPTION ACTION

7. TESTS PERFORMED SPECIFICATION REFERENCE TYPE TEST & RESULT ARE TEST RESULTS ATTACHED?

YES NO NA - IF NO, EXPLAIN:

8. CABRERA PERSONNEL ON-SITE EMPLOYEE NAME TITLE TASK(S) PERFORMED Mike Plonski Site Radiation Safety Lead (SRSL)

See Section 3 Summary of Work (8 Hrs)

Ann Jacobs Site Safety and Health Officer (SSHO)

See Section 3 Summary of Work (8 Hrs)

9. SUBCONTRACTOR PERSONNEL ON-SITE SUBCONTRACTOR NAME JOB DUTY TASK(S) PERFORMED
  1. OF PERSONNEL MAN-HOURS AIG Asbestos abatement Asbestos abatement 5

40 TOTALS 5

40

10. EQUIPMENT & MATERIALS ON-SITE VENDOR EQUIPMENT SERIAL #.

ACTIVE OR IDLE DATE RECEIVED DATE RETURNED ERG 1 Ludlum 2360 scaler/rate meter with 43-93 Zinc sulphide scintillation probe 184909/

PR298426 Active 02/21/2017 ERG 1 Ludlum 2360 scaler/rate meter with 43-93 zinc sulphide scintillation probe 193638/

PR199836 Active 02/21/2017 ERG 1 Ludlum 2360 scaler/rate meter 220242 Active 02/21/2017 ERG 1 Ludlum 2221 scaler/ digital rate meter with FIDLER sodium iodide scintillation probe 190205/

PR01807D Active 02/21/2017 ERG 1 Ludlum 2929 scaler sample counter with 43-10-1 zinc sulphide scintillation probe 200051/

PR215948 Active 02/21/2017 ERG 1 Ludlum model 12 meter with 44-9 Geiger-Mueller probe 276863/

PR147787 Active 02/21/2017 ERG Escort ELF Lapel Air sampler A3-48588 02/21/2017 ERG 1 MircoRem meter 2079 02/21/2017 ERG 1 Low volume air sampler 02/21/2017 ERG 1 Low volume air sampler 02/21/2017 Cabrera 1 Th-230 check source 5648-06 Active 02/21/2017 Cabrera 1 Tc-99 check source 5634-05 Active 02/21/2017 Cabrera 1 Co-60 check source 267D21 Active 02/21/2017 Cabrera 1 Ludlum model 2224-1 scaler/rate meter with 43-93 Zinc sulphide scintillation probe 227246/

PR244549 Active 02/21/2017 Cabrera 1 Ludlum Model 3 rate meter with 44-9 Geiger-Mueller probe 219266/

PR Active 02/21/2017 Canberra Gamma Spectroscopy Instrument (Canberra REGe)

SN 8381 Active 03/06/2017 United Rentals 1 Bobcat T5 90 Skid Steer Active 02/21/2017 United Rentals 1 set of forks, and 1 grapple bucket for Skid Steer Active 02/21/2017 United Rentals 1 Magnum 130 tow behind generator 02/21/2017 NEMF Wheel Scale 02/21/2017 Williams Scotsman 1 8 by 20 connex box Active 06/22/2016 United Rentals Scaffold 03/23/2017 United Rentals 2 heaters 03/23/2017

11. MATERIAL GENERATED/STORED ON-SITE MATERIAL ID SOLID, LIQUID, OR MIXED DESCRIPTION OF MATERIAL CONTAINER TYPE DISPOSITION OR LOCATION OF MATERIAL AMOUNT*

(CY OR TONS)

BFLU000011 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~8 Tons GFLU001451 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~8 Tons GFLU002021 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~8 Tons GFLU002008 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~8 Tons GFLU002079 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~8 Tons Totals

~40 Tons ATTACH SEPARATE PAGES AS NEEDED. SEPARATE PAGES INCLUDED?

YES NO

12. SAMPLE COLLECTION & ANALYSIS Sample ID/Spectrum ID Media (Soil Water, Other)

Sampler Initials On-Site or Off-Site Lab Analyses / Type Count time (min)

Does not include setup Photo File #

W6H-GFLU-2079-S-P-1 Other/ Debris CP On-Site Gamma-Spec 30 N/A W6H-GFLU-2079-S-P-2 Other/ Debris CP On-Site Gamma-Spec 30 N/A ATTACH SEPARATE PAGES AS NEEDED. SEPARATE PAGES INCLUDED?

YES NO

13. CHANGES/DELAYS/CONFLICTS ANY CHANGES IN SITE CONDITIONS OCCUR TODAY?

Yes No IF YES, EXPLAIN:

DID A DELAY OR WORK STOPPAGE OCCUR TODAY?

Yes No IF YES, EXPLAIN:

HAS ANYTHING DEVELOPED IN THE WORK WHICH MAY LEAD TO A CHANGE?

Yes No IF YES, EXPLAIN:

14. VERBAL INSTRUCTIONS RECEIVED:
15. HEALTH & SAFETY

SUMMARY

SAFETY BRIEFINGS WAS A SAFETY MEETING HELD?

YES NO TOPIC DISCUSSED: PPE, machine safety (skid steer, scissor lift), slips-trips-falls, slippery conditions SAFETY INSPECTIONS WAS A SAFETY INSPECTION CONDUCTED?

YES NO DEFICIENCIES NOTED:

YES NO DESCRIBE:

CORRECTIVE ACTIONS TAKEN:

YES NO DESCRIBE:

SUMMARY

OF WORK PERFORMED TYPE OF WORK:

Refer to description provided in Section 3 CHEMICALS USED:

None PPE LEVEL:

Safety shoes, hard hats, and eye protection, safety vest INCIDENT & NEAR MISS/OBSERVATION REPORTING ANY INCIDENTS ON-SITE TODAY?

YES NO DESCRIPTION:

CABRERA INCIDENT REPORTING FORM ATTACHED:

YES NO CLIENT SPECIFIC INCIDENT REPORTING FORM ATTACHED:

YES NO ANY NEAR MISSES/OBSERVATIONS ON-SITE TODAY?

YES NO DESCRIPTION:

H&S RECOMMENDATIONS

16. REMARKS Rain earlier in the week has delayed the ability to survey the floors; floor surveys cannot occur until floors are dry.

Another winter storm is possible for Friday, 3/31; depending on severity of winter weather, there is potential that site work could be delayed.

Katherine Warner and Mark Roberts from NRC visited the site. They reviewed instrumentation paperwork, the foot print of former buildings (9H, 10H, 11H), gamma spec reports, QC reports, and MBA ledger. The NRC met briefly with the building owner Mr. Katz.

Asbestos containment was constructed In the former X-ray Read Room. After containment was constructed, workers relayed that they noticed fishy odor in the containment. Cabrera investigated the odor by inspecting all the drums in the area. It was determined that the likely suspect is the cyclohexylamine and corrosive inhibitor contained in 55-gallon steel drums that are in various states of decay. Currently it can not be determined if any of the drums are leaking, since floors were saturated by rain events earlier in the week. The asbestos workers are currently working in a different location, setting up the fifth containment area and are not impacted by the odor in this area. Cabrera will survey the X-Ray Read Room on Friday, 3/31, with a PID meter to determine whether or not there is any potential safety risk for workers; determination will be made based on concentrations detected. Cabrera will restrict access to the drums and has contacted our drum management subcontractor to mobilize to the site within the next couple of weeks to properly package and store the drums.

17. VERIFICATION STATEMENT This report is complete and correct and all materials and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.

NAME/TITLE: Ann Jacobs SIGNATURE:

DATE: 03/31/17

18. PROJECT MANAGER REVIEW & ACCEPTANCE REMARKS AND/OR EXCEPTIONS TO REPORT:

ACCEPTANCE NAME/TITLE: Greg Bright, Deputy Project Manager SIGNATURE:

DATE: 03/31/17 Ann Jacobs Digitally signed by Ann Jacobs DN: cn=Ann Jacobs, o=Cabrera Services, ou, email=ajacobs@cabreraservices.com, c=US Date: 2017.03.31 11:29:13 -04'00' Digitally signed by Gregory Bright DN: cn=Gregory Bright, o=Cabrera Services Inc., ou, email=gbright@cabreraservices.com, c=US Date: 2017.03.31 11:50:25 -04'00'

PHOTOS

oP 5s5 -

Meetings Aa claRERA sERVrcEs

'H#

  • ^o,o.*tcaL EilGlNEERlrc ' REMEolarloM StX QUESTloHS FOR SUCCE$S - Take two minutes to think through and ansuer these questions:
1.

What are we about to do?

2.

What equipment are ue going to use?

3.

Have lfue been trained to use this equipment?

4.

Have l/ure been trained to do th'e iob?

5.

How can lAee be hurt?

6.

How can lArrre prevent this incident?

lf you and your team arcn't prepared to do tle assigned worlr, SFGP l,y#F?tr, and take time to prvperly prepare.

This sign-in log documents the topics of the safety meeting and individual attendance. Personnel who perform work operations onsite are required to attend and acknowledge their ability to ask questions and receipt of such briefings daily. Please provide a brief narrative of the selected topics as applicable to the Proiect in the comment box {ex. Name of AHA reviewed).

I.OJEGT NAME & LQCATION UNC New Haven, New Haven, CT PROJECT NO.

10-1007.00 "g/lbl,1 6?oD WEATHER, GONDITIONS 5 Urtitu-,t Topic Discussion-checkone

(

TodafsScopeofwork(Atllasks) fres Enla Schedule I New Work 1 Scope Charges

[f yes E rUa Reviewed Procedures, AFIA, etc.

E yes E nla Emergency Adion Plan & Procedures f] yes fl n/a Communications Protocol E yes E nfa Required PPE E yes D nta Required Monitoring / lnsiruments E yes E n/a Site Cantrol / Work Zones / Securfu E yes I rya Access / Egress / Slips, Tdps, & Falls EI yes I n/a Smoking, Eating, & Drinking D yes D n/a Washrocm / Faciliti* Location fl yes E rya Fleat/Cod Stress fl yes E nfa Exc{usionAreasBanicades/Con* E] yes E n/a Required Permits, Passes, Keys, etc.

fl yes I nla Decon Procedures I lE)l/V Mgmt.

[J yes [ *a Eqpmt. lnspections/Safety Checkliste E] yes fl n/a OTHER/COMMENTS:

Safetv Meetino Attendees

' 1.","- 4.), I (

Safety Meeting Leader xcJb,,,

Leader

No ' rv,o iNlu

' tsiB sSN rC{3 ' f Y3:90 1o:ov u ssclnuss vuEuIVC \\J\\/,

LIfQ, 1-s6u;1aary l$eleg - 999 dO