OP 359, Field Activity Documentation CABRERA DAILY REPORT

1. PROJECT INFORMATION PROJECT NAME/LOCATION: SUPPLEMENTAL RADIOLOGICAL SURVEY Former UNC Manufacturing Facility, New Haven, CT DATE: 03/28/17 REPORT NO. 025 CONTRACT #:

CABRERA PROJECT #: 10-1007.00 TASK #: 016 FIELD SITE MANAGER: Mike Plonski PROJECT MANAGER: Rob Flowers

2. WEATHER TEMPERATURE RANGE: 39-44 degrees F WIND SPEED/DIRECTION: 5-14 mph ENE PRECIPITATION LAST 24 HOURS:

YES NO TYPE: Rain AMOUNT: 0.38 INCHES BAROMETRIC PRESSURE: 29.96 HUMIDITY: 89-100%

HEAT INDEX RANGE: N/A WEATHER DELAYS:

YES NO DELAY TIME (HOURS): N/A

3.

SUMMARY

OF WORK Conducted safety meeting prior to beginning field activities.

AIG continued construction of the third and fourth containments.

Cabrera completed daily quality control checks on gamma spec and other radiological counting instrumentation.

Cabrera continued to provide radiological support during ACM abatement activities, including air monitoring and general contamination control monitoring.

Cabrera counted two samples for IMC 2120. Results pending review.

Cabrera conducted rad worker training for nine additional AIG employees.

4. MATERIALS & EQUIPMENT BROUGHT ON-SITE Receipt inspection required & completed?

Yes No

5. INSPECTIONS TYPE DESCRIPTION ACTION PREPARATORY INITIAL FOLLOW-UP ARE ANY DEFICIENCIES NOTED IN FOLLOW-UP INSPECTIONS?

YES NO - IF YES, EXPLAIN:

6. DEFICIENCIES CORRECTED DEFICIENCY #

REPORT REFERENCE DESCRIPTION ACTION

7. TESTS PERFORMED SPECIFICATION REFERENCE TYPE TEST & RESULT ARE TEST RESULTS ATTACHED?

YES NO NA - IF NO, EXPLAIN:

8. CABRERA PERSONNEL ON-SITE EMPLOYEE NAME TITLE TASK(S) PERFORMED Mike Plonski Site Radiation Safety Lead (SRSL)

See Section 3 Summary of Work (8 Hrs)

Ann Jacobs Site Safety and Health Officer (SSHO)

See Section 3 Summary of Work (8 Hrs)

9. SUBCONTRACTOR PERSONNEL ON-SITE SUBCONTRACTOR NAME JOB DUTY TASK(S) PERFORMED
  1. OF PERSONNEL MAN-HOURS AIG Asbestos abatement Asbestos abatement 13 95 TOTALS 13 95
10. EQUIPMENT & MATERIALS ON-SITE VENDOR EQUIPMENT SERIAL #.

ACTIVE OR IDLE DATE RECEIVED DATE RETURNED ERG 1 Ludlum 2360 scaler/rate meter with 43-93 Zinc sulphide scintillation probe 184909/

PR298426 Active 02/21/2017 ERG 1 Ludlum 2360 scaler/rate meter with 43-93 zinc sulphide scintillation probe 193638/

PR199836 Active 02/21/2017 ERG 1 Ludlum 2360 scaler/rate meter 220242 Active 02/21/2017 ERG 1 Ludlum 2221 scaler/ digital rate meter with FIDLER sodium iodide scintillation probe 190205/

PR01807D Active 02/21/2017 ERG 1 Ludlum 2929 scaler sample counter with 43-10-1 zinc sulphide scintillation probe 200051/

PR215948 Active 02/21/2017 ERG 1 Ludlum model 12 meter with 44-9 Geiger-Mueller probe 276863/

PR147787 Active 02/21/2017 ERG Escort ELF Lapel Air sampler A3-48588 02/21/2017 ERG 1 MircoRem meter 2079 02/21/2017 ERG 1 Low volume air sampler 02/21/2017 ERG 1 Low volume air sampler 02/21/2017 Cabrera 1 Th-230 check source 5648-06 Active 02/21/2017 Cabrera 1 Tc-99 check source 5634-05 Active 02/21/2017 Cabrera 1 Co-60 check source 267D21 Active 02/21/2017 Cabrera 1 Ludlum model 2224-1 scaler/rate meter with 43-93 Zinc sulphide scintillation probe 227246/

PR244549 Active 02/21/2017 Cabrera 1 Ludlum Model 3 rate meter with 44-9 Geiger-Mueller probe 219266/

PR Active 02/21/2017 Canberra Gamma Spectroscopy Instrument (Canberra REGe)

SN 8381 Active 03/06/2017 United Rentals 1 Bobcat T5 90 Skid Steer Active 02/21/2017 United Rentals 1 set of forks, and 1 grapple bucket for Skid Steer Active 02/21/2017 United Rentals 1 Magnum 130 tow behind generator 02/21/2017 NEMF Wheel Scale 02/21/2017 Williams Scotsman 1 8 by 20 connex box Active 06/22/2016 United Rentals Scaffold 03/23/2017 United Rentals 2 heaters 03/23/2017

11. MATERIAL GENERATED/STORED ON-SITE MATERIAL ID SOLID, LIQUID, OR MIXED DESCRIPTION OF MATERIAL CONTAINER TYPE DISPOSITION OR LOCATION OF MATERIAL AMOUNT*

(CY OR TONS)

BFLU000011 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~8 Tons GFLU001451 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~8 Tons GFLU002021 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~8 Tons GFLU002008 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~8 Tons GFLU002079 Solid Soil/ Garbage/ Debris/

ACM Intermodal Building 6H

~8 Tons Totals

~40 Tons ATTACH SEPARATE PAGES AS NEEDED. SEPARATE PAGES INCLUDED?

YES NO

12. SAMPLE COLLECTION & ANALYSIS Sample ID/Spectrum ID Media (Soil Water, Other)

Sampler Initials On-Site or Off-Site Lab Analyses / Type Count time (min)

Does not include setup Photo File #

W6H-IMC-2120-S-P-2 Other/ Debris CP On-Site Gamma-Spec 30 N/A W6H-IMC-2120-S-P-3 Other/ Debris CP On-Site Gamma-Spec 30 N/A ATTACH SEPARATE PAGES AS NEEDED. SEPARATE PAGES INCLUDED?

YES NO

13. CHANGES/DELAYS/CONFLICTS ANY CHANGES IN SITE CONDITIONS OCCUR TODAY?

Yes No IF YES, EXPLAIN:

DID A DELAY OR WORK STOPPAGE OCCUR TODAY?

Yes No IF YES, EXPLAIN:

HAS ANYTHING DEVELOPED IN THE WORK WHICH MAY LEAD TO A CHANGE?

Yes No IF YES, EXPLAIN:

14. VERBAL INSTRUCTIONS RECEIVED:
15. HEALTH & SAFETY

SUMMARY

SAFETY BRIEFINGS WAS A SAFETY MEETING HELD?

YES NO TOPIC DISCUSSED: PPE, machine safety (skid steer, scissor lift), slips-trips-falls, slippery conditions SAFETY INSPECTIONS WAS A SAFETY INSPECTION CONDUCTED?

YES NO DEFICIENCIES NOTED:

YES NO DESCRIBE:

CORRECTIVE ACTIONS TAKEN:

YES NO DESCRIBE:

SUMMARY

OF WORK PERFORMED TYPE OF WORK:

Refer to description provided in Section 3 CHEMICALS USED:

None PPE LEVEL:

Safety shoes, hard hats, and eye protection, safety vest INCIDENT & NEAR MISS/OBSERVATION REPORTING ANY INCIDENTS ON-SITE TODAY?

YES NO DESCRIPTION:

CABRERA INCIDENT REPORTING FORM ATTACHED:

YES NO CLIENT SPECIFIC INCIDENT REPORTING FORM ATTACHED:

YES NO ANY NEAR MISSES/OBSERVATIONS ON-SITE TODAY?

YES NO DESCRIPTION:

H&S RECOMMENDATIONS

16. REMARKS Rain throughout the day has delayed the ability to survey the floors.

The rains have caused the roof of the second containment to fail. The second containment was cleared by clearance sampling on Monday.

17. VERIFICATION STATEMENT This report is complete and correct and all materials and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.

NAME/TITLE: Ann Jacobs SIGNATURE:

DATE: 03/29/17

18. PROJECT MANAGER REVIEW & ACCEPTANCE REMARKS AND/OR EXCEPTIONS TO REPORT:

ACCEPTANCE NAME/TITLE: Greg Bright, Deputy Project Manager SIGNATURE:

DATE: 03/29/17 Ann Jacobs Digitally signed by Ann Jacobs DN: cn=Ann Jacobs, o=Cabrera Services, ou, email=ajacobs@cabreraservices.com, c=US Date: 2017.03.29 10:33:48 -04'00' Digitally signed by Gregory Bright DN: cn=Gregory Bright, o=Cabrera Services Inc., ou, email=gbright@cabreraservices.com, c=US Date: 2017.03.29 11:42:21 -04'00'

oP 555 -

Meetings Aa c,eeRERA sERvrcEs

'H#

n^o,o.*rcAL ENGTNELRTHG ' REMEoia I IoN StX SUESTlONS FOR SUCCESS - Take two minutes to think through and answer these questions:

1.

What are ue about to do?

2.

What equipment are ure going to use?

3.

Have lftire been trained to use this equipment?

n"r" rGi*,t*inJtodothisjob?'

5.

How can lr@ k hurt?

6.

How can lArue prevent this incident?

lf you and your team aren't prcpared to do the assrgned wor*, SISF, Iff$frii, and take time tu properly prepare.

This sign-in log documents the topics of the safety meeting and individual attendance. Personnel who perform work operations onsite are required to aftend and acknowledge their ability to ask queslions and receipt of such bdefings daily. Please provide a brief narrative of the selecled topics as applicable to the Project in the comment box (ex. Name of AHA reviewed).

PROJECT NAME & LOCATION UNC New Haven, New Haven, CT PROJECT NO.

10-1007.00

'^'gfzr/r j WEATHER CONDITIONS

(^?,,v1-! ftt a I Topic Oiscussr'or, - check one Tdays Scope of Work (All tasks)

E yes E nla Scheclule I New Work 1 Scope Chaqges fl yes E rya Reviewed Procedures, AHA, tc.

E yes E n/a Ennergency Action Plen & Procedures E yes EI rya Communications Protocol E yes E nfa Required PPE E yes E n/a Required Monitoring / Instruments E yes E nfa Site Control / Wo* Zones / Sed.rity E yes il nta Acdess / Egress / Slips, Tdps, & Falls M

fl n/a Srnoking, Eating, & Ddnking E yes E nla Washroom / Facilities Localion il yes ff n/a l-leaUCold Stress E yes fl rva Exclusion fueas Barricades / Cores E yes E rya Required Permits, PasEes, Keys, etc.

E yes fi nla Decon Procedures / lI)1A/ Mgmt.

D yes fl nla Eqpmt" lnspections/Safety Checklhts E yes ff nla OTHERYCOMMENTS:

Safety Meetinq Attendees Safety Meeting Leader sA,l.. ?\\** <l-,