OP 359, Field Activity Documentation CABRERA DAILY REPORT
- 1. PROJECT INFORMATION PROJECT NAME/LOCATION: SUPPLEMENTAL RADIOLOGICAL SURVEY Former UNC Manufacturing Facility, New Haven, CT DATE: 03/15/17 REPORT NO. 016 CONTRACT #:
CABRERA PROJECT #: 10-1007.00 TASK #: 016 FIELD SITE MANAGER: Mike Plonski PROJECT MANAGER: Rob Flowers
- 2. WEATHER TEMPERATURE RANGE: 19-28 degrees F WIND SPEED/DIRECTION: 10-16 mph W PRECIPITATION LAST 24 HOURS:
YES NO TYPE: N/A AMOUNT: N/A BAROMETRIC PRESSURE: 29.55 HUMIDITY: 51-72%
HEAT INDEX RANGE: N/A WEATHER DELAYS:
YES NO DELAY TIME (HOURS): 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />
- 3.
SUMMARY
OF WORK Conducted safety meeting prior to beginning field activities.
AIG checked the containments after winter storm Stella. Both the first and the second containments were damaged due to the storm. AIG will not fix the first containment area as IH air testing has already confirmed asbestos abatement was completed. AIG worked on repairing the second containment area.
Cabrera completed daily quality control checks on gamma spec and other radiological counting instrumentation.
Cabrera continued to provide radiological support during ACM abatement activities, including air monitoring and general contamination control monitoring.
14 March 2017 no work occurred due to winter storm Stella.
- 4. MATERIALS & EQUIPMENT BROUGHT ON-SITE Receipt inspection required & completed?
Yes No
- 5. INSPECTIONS TYPE DESCRIPTION ACTION PREPARATORY INITIAL FOLLOW-UP ARE ANY DEFICIENCIES NOTED IN FOLLOW-UP INSPECTIONS?
YES NO - IF YES, EXPLAIN:
- 6. DEFICIENCIES CORRECTED DEFICIENCY #
REPORT REFERENCE DESCRIPTION ACTION
- 7. TESTS PERFORMED SPECIFICATION REFERENCE TYPE TEST & RESULT ARE TEST RESULTS ATTACHED?
YES NO NA - IF NO, EXPLAIN:
- 8. CABRERA PERSONNEL ON-SITE EMPLOYEE NAME TITLE TASK(S) PERFORMED Mike Plonski Site Radiation Safety Lead (SRSL)
See Section 3 Summary of Work (8 Hrs)
Stephan Owe Site Safety and Health Officer (SSHO)
See Section 3 Summary of Work (8 Hrs)
Ann Jacobs Environmental Scientist See Section 3 Summary of Work (8 Hrs)
- 9. SUBCONTRACTOR PERSONNEL ON-SITE SUBCONTRACTOR NAME JOB DUTY TASK(S) PERFORMED
- OF PERSONNEL MAN-HOURS AIG Asbestos abatement Asbestos abatement 5
40 TOTALS 5
40
- 10. EQUIPMENT & MATERIALS ON-SITE VENDOR EQUIPMENT SERIAL #.
ACTIVE OR IDLE DATE RECEIVED DATE RETURNED ERG 1 Ludlum 2360 scaler/rate meter with 43-93 Zinc sulphide scintillation probe 184909/
PR298426 Active 02/21/2017 ERG 1 Ludlum 2360 scaler/rate meter with 43-93 zinc sulphide scintillation probe 193638/
PR199836 Active 02/21/2017 ERG 1 Ludlum 2360 scaler/rate meter 220242 Active 02/21/2017 ERG 1 Ludlum 2221 scaler/ digital rate meter with FIDLER sodium iodide scintillation probe 190205/
PR01807D Active 02/21/2017 ERG 1 Ludlum 2929 scaler sample counter with 43-10-1 zinc sulphide scintillation probe 200051/
PR215948 Active 02/21/2017 ERG 1 Ludlum model 12 meter with 44-9 Geiger-Mueller probe 276863/
PR147787 Active 02/21/2017 ERG Escort ELF Lapel Air sampler A3-48588 02/21/2017 ERG 1 MircoRem meter 2079 02/21/2017 ERG 1 Low volume air sampler 02/21/2017 ERG 1 Low volume air sampler 02/21/2017 Cabrera 1 Th-230 check source 5648-06 Active 02/21/2017 Cabrera 1 Tc-99 check source 5634-05 Active 02/21/2017 Cabrera 1 Co-60 check source 267D21 Active 02/21/2017 Cabrera 1 Ludlum model 2224-1 scaler/rate meter with 43-93 Zinc sulphide scintillation probe 227246/
PR244549 Active 02/21/2017 Cabrera 1 Ludlum Model 3 rate meter with 44-9 Geiger-Mueller probe 219266/
PR Active 02/21/2017 Canberra Gamma Spectroscopy Instrument (Canberra REGe)
SN 8381 Active 03/06/2017 United Rentals 1 Bobcat T5 90 Skid Steer Active 02/21/2017 United Rentals 1 set of forks, and 1 grapple bucket for Skid Steer Active 02/21/2017 United Rentals 1 Magnum 130 tow behind generator 02/21/2017 NEMF Wheel Scale 02/21/2017 Williams Scotsman 1 8 by 20 connex box Active 06/22/2016
- 11. MATERIAL GENERATED/STORED ON-SITE MATERIAL ID SOLID, LIQUID, OR MIXED DESCRIPTION OF MATERIAL CONTAINER TYPE DISPOSITION OR LOCATION OF MATERIAL AMOUNT*
(CY OR TONS)
BFLU000011 Solid Soil/ Garbage/ Debris/
ACM Intermodal Building 6H
~8 Tons GFLU001451 Solid Soil/ Garbage/ Debris/
ACM Intermodal Building 6H
~8 Tons GFLU002021 Solid Soil/ Garbage/ Debris/
ACM Intermodal Building 6H
~8 Tons GFLU002008 Solid Soil/ Garbage/ Debris/
ACM Intermodal Building 6H
~8 Tons Totals
~32 Tons ATTACH SEPARATE PAGES AS NEEDED. SEPARATE PAGES INCLUDED?
YES NO
- 12. SAMPLE COLLECTION & ANALYSIS Sample ID/Spectrum ID Media (Soil Water, Other)
Sampler Initials On-Site or Off-Site Lab Analyses / Type Count time (min)
Does not include setup Photo File #
ATTACH SEPARATE PAGES AS NEEDED. SEPARATE PAGES INCLUDED?
YES NO
- 13. CHANGES/DELAYS/CONFLICTS ANY CHANGES IN SITE CONDITIONS OCCUR TODAY?
Yes No IF YES, EXPLAIN: There is approximately seven inches of snow and ice on site and inside the building in places.
DID A DELAY OR WORK STOPPAGE OCCUR TODAY?
Yes No IF YES, EXPLAIN:
The first containment collapsed. Clearance samples have been previously obtained for the first containment area; therefore, floor surveys will be done without the containment being in place. Asbestos abatement in the second containment could not be done due to the storm damage. The second containment has to be repaired before abatement can take place. Work was done to repair the second containment.
HAS ANYTHING DEVELOPED IN THE WORK WHICH MAY LEAD TO A CHANGE?
Yes No IF YES, EXPLAIN:
- 14. VERBAL INSTRUCTIONS RECEIVED:
- 15. HEALTH & SAFETY
SUMMARY
SAFETY BRIEFINGS WAS A SAFETY MEETING HELD?
YES NO TOPIC DISCUSSED: PPE, machine safety (skid steer, scissor lift), slips-trips-falls, slippery conditions SAFETY INSPECTIONS WAS A SAFETY INSPECTION CONDUCTED?
YES NO DEFICIENCIES NOTED:
YES NO DESCRIBE:
CORRECTIVE ACTIONS TAKEN:
YES NO DESCRIBE:
SUMMARY
OF WORK PERFORMED TYPE OF WORK:
Refer to description provided in Section 3 CHEMICALS USED:
None PPE LEVEL:
Safety shoes, hard hats, and eye protection, safety vest INCIDENT & NEAR MISS/OBSERVATION REPORTING ANY INCIDENTS ON-SITE TODAY?
YES NO DESCRIPTION:
CABRERA INCIDENT REPORTING FORM ATTACHED:
YES NO CLIENT SPECIFIC INCIDENT REPORTING FORM ATTACHED:
YES NO ANY NEAR MISSES/OBSERVATIONS ON-SITE TODAY?
YES NO DESCRIPTION:
H&S RECOMMENDATIONS
- 16. REMARKS 14 March 2017 no work occurred due to winter storm Stella.
- 17. VERIFICATION STATEMENT This report is complete and correct and all materials and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.
NAME/TITLE: Ann Jacobs SIGNATURE:
DATE: 03/16/17 Ann Jacobs Digitally signed by Ann Jacobs DN: cn=Ann Jacobs, o=Cabrera Services, ou, email=ajacobs@cabreraservices.com, c=US Date: 2017.03.16 09:36:42 -04'00'
- 18. PROJECT MANAGER REVIEW & ACCEPTANCE REMARKS AND/OR EXCEPTIONS TO REPORT:
ACCEPTANCE NAME/TITLE: Greg Bright, Deputy Project Manager SIGNATURE:
DATE: 03/16/17 for Greg Bright Digitally signed by Robert E. Flowers DN: cn=Robert E. Flowers, o=Cabrera Services Inc., ou=Corporate, email=rflowers@cabreraservices.com
, c=US Date: 2017.03.16 12:12:48 -04'00'
Photos
OP 555 - Safety Meetings nA cnenERe SeRvtces R^DIoLGIcAL.
ENGINEERING. REMEOIAIION SIX QUESTIONS FOR SUCCESS - Take two minutes to think through and answer these questions:
- 1.
What are we about to do?
- 2.
What equipment are we going to use?
- 3.
Have l/we been trained to use this equipment?
- 4.
Have l/we been trained to do this iob?
- 5.
How can l/we be hurt?
- 6.
How can llwe prevent this incident?
It you and your team aten't prepared ta do tlre assrgned wor&.$?"#F eVAi#${" and take time to properly prepare.
This sign-in log documents the topics of the safety meeting and individual attendance. Personnel who perform work operations onsite are required to attend and acknowledge their ability to ask questions and receipt of such brie{ings daily. Please provide a brief narrative of the selected topics as applicable to the Project in the comment box (ex. Name of AHA reviewed).
PROJECT NAME & LOCATION UNC New Haven
- t0,1"007.CIo DATE/TlME !_-r S_r)cr -(
- 10-20ffi WEATHER CONDITIONS bd *Suu^ u Topic Discussioa-ch*kone Today's Scope of Work (All tasks)
D yes E n/a Schedule 1 New Work / Scope Changes D yes E n/a Reviewed Procedures, AHA, etc.
D yes E nla Emergency Action Plan & Procedures E yes D nla Communications Protocol f] yes D nla Required PPE D yes E n1a Required Monitoring / lnstruments D yes D rla Site Control / Work Zones I Security I yes f] n/a Access I Egress I Slips, Trips, & Falls F y" E n/a Smoking, Eating, & Drinking D yes n n/a Washroom / Facilities Location fl yes D n/a HeaUCold Stress D yes E n/a Exclusion Areas Banicades I Cones f] yes E n/a Required Pennits, Passes, Keys, etc.
fl yes E n/a Decon Procedures / IDW Mgmt.
D yes D nla Eqpmt. lnspections/Safety Checklists U yes f] n/a OTHER/COMMENTS Sign RWP for daily access remaining areas at the entrance. lnspect any ladders before use. lnspections of Arial lift and fall protection must be performed daily.
Safety Meetinq Attendees LF,
), r' 14 llR.D.
F/n./ z-'\\
Safety MeetingEila:der Al Craig / SSHO Prinf Name Sionatrlre
Aa caeRERA sERvrcEs t
n^.,o,oa,rcaL.ENGrNLFRrNC.ReME-orarroN OP 555 - Safety Meetings