ML19098A010

From kanterella
Jump to navigation Jump to search
Appendix H, Daily Report - UNC_Daily_Report_010_20160624
ML19098A010
Person / Time
Site: 07000371
Issue date: 03/01/2018
From:
Cabrera Services
To:
NRC Region 1
Shared Package
ml051740240 List: ... further results
References
Download: ML19098A010 (7)


Text

OP 359, Field Activity Documentation CABRERA DAILY REPORT

1. PROJECT INFORMATION PROJECT NAME/LOCATION: SUPPLEMENTAL RADIOLOGICAL SURVEY Former UNC Manufacturing Facility, New Haven, CT DATE: 06/24/16 REPORT NO. 010 CONTRACT #:

CABRERA PROJECT #: 10-1007.00 TASK #: 015 FIELD SITE MANAGER: Al Craig PROJECT MANAGER: Rob Flowers

2. WEATHER TEMPERATURE RANGE: 61-80 degrees F WIND SPEED/DIRECTION: East, 3 to 12 mph PRECIPITATION LAST 24 HOURS:

YES NO TYPE: none AMOUNT: N/A BAROMETRIC PRESSURE: 30.02-30.14 HUMIDITY: 37-81%

HEAT INDEX RANGE: N/A WEATHER DELAYS:

YES NO DELAY TIME (HOURS): N/A

3.

SUMMARY

OF WORK

1) Completed outdoor gamma walkover surveys of historically-used entry/exit points to both Building 3H/6H and the 71 Shelton Avenue site
2) Continued indoor gamma walkover surveys within western half of Building 6H
3) Gamma spec counts of items of interest
4. MATERIALS & EQUIPMENT BROUGHT ON-SITE 1 Canberra FALCON detector Receipt inspection required & completed?

Yes No

5. INSPECTIONS TYPE DESCRIPTION ACTION PREPARATORY INITIAL FOLLOW-UP ARE ANY DEFICIENCIES NOTED IN FOLLOW-UP INSPECTIONS?

YES NO - IF YES, EXPLAIN:

6. DEFICIENCIES CORRECTED DEFICIENCY #

REPORT REFERENCE DESCRIPTION ACTION

7. TESTS PERFORMED SPECIFICATION REFERENCE TYPE TEST & RESULT ARE TEST RESULTS ATTACHED?

YES NO NA - IF NO, EXPLAIN:

8. CABRERA PERSONNEL ON-SITE EMPLOYEE NAME TITLE TASK(S) PERFORMED Nicholas Berliner Site Radiation Safety Lead (SRSL)

Sections 3 for tasks (9 Hrs)

Alfred Craig Site Safety and Health Officer (SSHO)

Sections 3 for tasks (9 Hrs)

Michael Plonski Alternate SRSL Sections 3 for tasks (8 Hrs)

9. SUBCONTRACTOR PERSONNEL ON-SITE SUBCONTRACTOR NAME JOB DUTY TASK(S) PERFORMED
  1. OF PERSONNEL MAN-HOURS TOTALS 0

0

10. EQUIPMENT & MATERIALS ON-SITE VENDOR EQUIPMENT SERIAL #.

ACTIVE OR IDLE DATE RECEIVED DATE RETURNED ERG 1 Ludlum 2360 scaler/rate meter with 43-37 gas proportional probe and 239-1F floor monitor cart 145481 PR178371 Active 6/13/16 ERG 1 Ludlum 2360 scaler/rate meter with 43-93 zinc sulphide scintillation probe 184913 PR199839 Active 6/13/16 ERG 1 Ludlum 2929 scaler sample counter with 43-10-1 zinc sulphide scintillation probe 157320 PR157821 Active 6/13/16 ERG 1 Ludlum 2221 scaler/ digital rate meter with Bicron G-5 sodium iodide scintillation probe 108859 010807B Active 6/13/16 Cabrera 1 Th-230 check source 5205-04 Active 6/13/16 Cabrera 1 Tc-99 check source 5649-06 Active 6/13/16 Cabrera 1 Co-60 check source 277D161 Active 6/13/16 Cabrera 1 Cl-36 large-area calibration source AC-2449 Removed from Site 6/13/16 6/17/16 Cabrera 1 Sr-90 large-area calibration source AC-2450 Removed from Site 6/13/16 6/17/16 Cabrera 1 Tc-99 large-area calibration source AC-2448 Removed from Site 6/13/16 6/17/16 Cabrera 1 Th-230 large-area calibration source AC-2446 Removed from Site 6/13/16 6/17/16 ERG 1 Escort ELF lapel air sampler A2-32568 Idle 6/13/16 United Rentals 1 Honda EB 6500 generator EBLC-1020473 Idle 6/13/16 United Rentals 1 set of six foot by 30 inch rolling scaffold Idle 6/13/16 United Rentals 1 Skyjack SJIII 4626 electric scissor lift 10149481 Removed from Site 6/14/16 6/22/16 Cabrera 1 Ludlum 2360 scaler/rate meter with 43-93 zinc sulphide scintillation probe 227246 PR244549 Active 6/15/16 Cabrera 1 Ludlum 2221 scaler/ digital rate meter with Bicron G-5 sodium iodide scintillation probe 161580 061810A Active 6/15/16 Cabrera 1 Ludlum Model 3 rate meter with 44-9 Geiger-Mueller probe 218266 PR299268 Active 6/15/16 Cabrera 1 Bicron MicroRem meter 1844 Active 6/15/16 Cabrera 1 Canberra FALCON detector 13000012 Removed from Site 6/17/16 6/17/16 Active 6/24/16 Williams Scotsman 1 8 by 20 connex box Active 6/22/16

11. MATERIAL GENERATED/STORED ON-SITE MATERIAL ID SOLID, LIQUID, OR MIXED DESCRIPTION OF MATERIAL CONTAINER TYPE DISPOSITION OR LOCATION OF MATERIAL AMOUNT*

(CY OR TONS)

Totals ATTACH SEPARATE PAGES AS NEEDED. SEPARATE PAGES INCLUDED?

YES NO

12. SAMPLE COLLECTION & ANALYSIS Sample ID/Spectrum ID Media (Soil Water, Other)

Sampler Initials On-Site or Off-Site Lab Analyses / Type Count time (sec)

Does not include setup Photo File #

N/A Metallic item of interest #1 MP On-site Gamma spec 30 minutes N/A N/A Metallic item of interest #2 MP On-site Gamma spec 30 minutes N/A N/A Metallic item of interest #3 MP On-site Gamma spec 30 minutes N/A N/A Metallic item of interest #4 MP On-site Gamma spec 30 minutes N/A N/A Metallic item of interest #5 MP On-site Gamma spec 30 minutes N/A N/A Metallic item of interest #6 MP On-site Gamma spec 30 minutes N/A ATTACH SEPARATE PAGES AS NEEDED. SEPARATE PAGES INCLUDED?

YES NO

13. CHANGES/DELAYS/CONFLICTS ANY CHANGES IN SITE CONDITIONS OCCUR TODAY?

Yes No IF YES, EXPLAIN:

DID A DELAY OR WORK STOPPAGE OCCUR TODAY?

Yes No IF YES, EXPLAIN:

HAS ANYTHING DEVELOPED IN THE WORK WHICH MAY LEAD TO A CHANGE?

Yes No IF YES, EXPLAIN:

14. VERBAL INSTRUCTIONS RECEIVED:
15. HEALTH & SAFETY

SUMMARY

SAFETY BRIEFINGS WAS A SAFETY MEETING HELD?

YES NO TOPIC DISCUSSED: Safe completion of tasks described in Section 3 SAFETY INSPECTIONS WAS A SAFETY INSPECTION CONDUCTED?

YES NO DEFICIENCIES NOTED:

YES NO DESCRIBE:

CORRECTIVE ACTIONS TAKEN:

YES NO DESCRIBE:

SUMMARY

OF WORK PERFORMED TYPE OF WORK:

Refer to description provided in Section 3 CHEMICALS USED:

None PPE LEVEL:

Safety shoes, hard hats, and eye protection INCIDENT & NEAR MISS/OBSERVATION REPORTING ANY INCIDENTS ON-SITE TODAY?

YES NO DESCRIPTION:

CABRERA INCIDENT REPORTING FORM ATTACHED:

YES NO CLIENT SPECIFIC INCIDENT REPORTING FORM ATTACHED:

YES NO ANY NEAR MISSES/OBSERVATIONS ON-SITE TODAY?

YES NO DESCRIPTION:

H&S RECOMMENDATIONS

16. REMARKS The items of interest were counted to provide accurate information for shipping and inventory purposes.
17. VERIFICATION STATEMENT This report is complete and correct and all materials and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.

NAME/TITLE: Nicholas Berliner, SRSL SIGNATURE:

DATE: 06/24/16

18. PROJECT MANAGER REVIEW & ACCEPTANCE REMARKS AND/OR EXCEPTIONS TO REPORT:

ACCEPTANCE NAME/TITLE: Greg Bright, Deputy Project Manager SIGNATURE:

DATE: 06/24/16

OP 555,.. Safety Meetings

-SIX QUESTIONS FOR SUCCESS - Take two minutes to think through and answer these questions:

1.

What are we about to do?

2.

What equipment are we going to use?

3.

Have I/we been trained to use this equipment?

4.

Have I/we been trained to do this job?

5.

How can I/we be hurt?

6.

How can I/we prevent this incident?

N you and your team aren't prepared to do the assigned work, STOP WORK. and take time to properly prepare.

This sign-in log documents the topics of the safety meeting and individual attendance. Personnel who perfonn work operations onsite are required to attend and acknowledge their ability to ask questions and receipt of such briefings daily. Please provide a brief narrative of the selected topics as applicable to the Project in the comment box (ex. Name of AHA reviewed).

PROJECT NAME & LOCATION UNC New Haven CT 10-1007.00 Today's Scope of Work (All tasks)

Schedule I New Work I Scope Changes Reviewed Procedures, AHA, etc.

Emergency Action Plan & Procedures Communications Protocol Required PPE Required Monitoring / Instruments Site Control / Work Zones I Security DATEfTIME WEATHER CONDmONS 6-24-2016 Topic Discussion - check one xO yes 0 n/a Access I Egress I Slips, Trips, & Falls Dyes On1a Smoking, Ealing, & Drinking Dyes Onla Washroom I Facilities Location Dyes On1a Heat/Cold Stress Dyes 0 n/a Exclusion Areas Barricades I Cones Dyes Onla Required Permits, Passes, Keys, etc.

Dyes D nla Decon Procedures/ IDW Mgmt Dyes Onla Eqpmt Inspections/Safety Checklists Dyes Dyes Dyes Dyes Dyes Dyes Dyes Dyes OTHER/COMMENTS Building access Surveys Print Name tJ K.k Q 0V LV#

Safety Meeting Leader Al Craig I SSHO Print Name Onla Onla Onla Onla Onla Onla On/a On/a