ML19098A002
| ML19098A002 | |
| Person / Time | |
|---|---|
| Site: | 07000371 |
| Issue date: | 03/01/2018 |
| From: | Cabrera Services |
| To: | NRC Region 1 |
| Shared Package | |
| ml051740240 | List:
|
| References | |
| Download: ML19098A002 (16) | |
Text
OP 359, Field Activity Documentation CABRERA DAILY REPORT
- 1. PROJECT INFORMATION PROJECT NAME/LOCATION: SUPPLEMENTAL RADIOLOGICAL SURVEY Former UNC Manufacturing Facility, New Haven, CT DATE: 06/13/16 REPORT NO. 001 CONTRACT #:
CABRERA PROJECT #: 10-1007.00 TASK #: 015 FIELD SITE MANAGER: Al Craig PROJECT MANAGER: ROB FLOWERS
- 2. WEATHER TEMPERATURE RANGE: 54-73 WIND SPEED/DIRECTION: Northwest, 6-15, gusts to 28 mph PRECIPITATION LAST 24 HOURS:
YES NO TYPE: NONE AMOUNT: N/A BAROMETRIC PRESSURE: 29.74-29.83 HUMIDITY: 41-67%
HEAT INDEX RANGE: N/A WEATHER DELAYS:
YES NO DELAY TIME (HOURS): N/A
- 3.
SUMMARY
OF WORK
- 1) Mobilization
- 2) Equipment and instrument deliveries
- 3) Instrument set-up and initial quality control measurements
- 4) Building walk-through and inspection
- 4. MATERIALS & EQUIPMENT BROUGHT ON-SITE 1 Ludlum 2360 scaler/rate meter with 43-37 gas proportional probe and 239-1F floor monitor cart 1 Ludlum 2360 scaler/rate meter with 43-93 zinc sulphide scintillation probe 1 Ludlum 2929 scaler sample counter with 43-10-1 zinc sulphide scintillation probe 1 Ludlum 2221 scaler/ digital rate meter with Bicron G-5 sodium iodide scintillation probe 1 Th-230 check source 1 Tc-99 check source 1 Co-60 check source 1 Th-230 large-area calibration source 1 Tc-99 large-area calibration source 1 Cl-36 large-area calibration source 1 Sr-90 large-area calibration source 1 Escort ELF lapel air sampler 1 Honda EB 6500 generator 1 set of six foot by 30 inch rolling scaffold miscellaneous hand tools and consumable supplies Receipt inspection required & completed?
Yes No
- 5. INSPECTIONS TYPE DESCRIPTION ACTION PREPARATORY INITIAL FOLLOW-UP ARE ANY DEFICIENCIES NOTED IN FOLLOW-UP INSPECTIONS?
YES NO - IF YES, EXPLAIN:
- 6. DEFICIENCIES CORRECTED DEFICIENCY #
REPORT REFERENCE DESCRIPTION ACTION
- 7. TESTS PERFORMED SPECIFICATION REFERENCE TYPE TEST & RESULT ARE TEST RESULTS ATTACHED?
YES NO NA - IF NO, EXPLAIN:
- 8. CABRERA PERSONNEL ON-SITE EMPLOYEE NAME TITLE TASK(S) PERFORMED Nicholas Berliner Site Radiation Safety Lead (SRSL)
Sections 3 for tasks (8 Hrs)
Alfred Craig Site Safety and Health Officer (SSHO)
Sections 3 for tasks (8 Hrs)
- 9. SUBCONTRACTOR PERSONNEL ON-SITE SUBCONTRACTOR NAME JOB DUTY TASK(S) PERFORMED
- OF PERSONNEL MAN-HOURS TOTALS 1
10
- 10. EQUIPMENT & MATERIALS ON-SITE VENDOR EQUIPMENT SERIAL #.
ACTIVE OR IDLE DATE RECEIVED DATE RETURNED ERG 1 Ludlum 2360 scaler/rate meter with 43-37 gas proportional probe and 239-1F floor monitor cart 145481 PR178371 Active 6/13/16 ERG 1 Ludlum 2360 scaler/rate meter with 43-93 zinc sulphide scintillation probe 184913 PR199839 Active 6/13/16 ERG 1 Ludlum 2929 scaler sample counter with 43-10-1 zinc sulphide scintillation probe 157320 PR157821 Active 6/13/16 ERG 1 Ludlum 2221 scaler/ digital rate meter with Bicron G-5 sodium iodide scintillation probe 108859 010807B Active 6/13/16 Cabrera 1 Th-230 check source 5205-04 Active 6/13/16 Cabrera 1 Tc-99 check source 5649-06 Active 6/13/16 Cabrera 1 Co-60 check source 277D161 Active 6/13/16 Cabrera 1 Cl-36 large-area calibration source AC-2449 Active 6/13/16 Cabrera 1 Sr-90 large-area calibration source AC-2450 Active 6/13/16 Cabrera 1 Tc-99 large-area calibration source AC-2448 Active 6/13/16 Cabrera 1 Th-230 large-area calibration source AC-2446 Active 6/13/16 Cabrera 1 Escort ELF lapel air sampler A2-32568 Idle 6/13/16 Cabrera 1 Honda EB 6500 generator EBLC-1020473 Idle 6/13/16 Cabrera 1 set of six foot by 30 inch rolling scaffold Idle 6/13/16
- 11. MATERIAL GENERATED/STORED ON-SITE MATERIAL ID SOLID, LIQUID, OR MIXED DESCRIPTION OF MATERIAL CONTAINER TYPE DISPOSITION OR LOCATION OF MATERIAL AMOUNT*
(CY OR TONS)
Totals ATTACH SEPARATE PAGES AS NEEDED. SEPARATE PAGES INCLUDED?
YES NO
- 12. SAMPLE COLLECTION & ANALYSIS Sample ID/Spectrum ID Media (Soil Water, Other)
Sampler Initials On-Site or Off-Site Lab Analyses / Type Count time (sec)
Does not include setup Photo File #
ATTACH SEPARATE PAGES AS NEEDED. SEPARATE PAGES INCLUDED?
YES NO
- 13. CHANGES/DELAYS/CONFLICTS ANY CHANGES IN SITE CONDITIONS OCCUR TODAY?
Yes No IF YES, EXPLAIN:
DID A DELAY OR WORK STOPPAGE OCCUR TODAY?
Yes No IF YES, EXPLAIN:
HAS ANYTHING DEVELOPED IN THE WORK WHICH MAY LEAD TO A CHANGE?
Yes No IF YES, EXPLAIN:
- 14. VERBAL INSTRUCTIONS RECEIVED:
- 15. HEALTH & SAFETY
SUMMARY
SAFETY BRIEFINGS WAS A SAFETY MEETING HELD?
YES NO TOPIC DISCUSSED:
SAFETY INSPECTIONS WAS A SAFETY INSPECTION CONDUCTED?
YES NO DEFICIENCIES NOTED:
YES NO DESCRIBE:
CORRECTIVE ACTIONS TAKEN:
YES NO DESCRIBE:
SUMMARY
OF WORK PERFORMED TYPE OF WORK:
Refer to description provided in Section 3 CHEMICALS USED:
None PPE LEVEL:
Safety shoes, hard hats, and eye protection INCIDENT & NEAR MISS/OBSERVATION REPORTING ANY INCIDENTS ON-SITE TODAY?
YES NO DESCRIPTION:
CABRERA INCIDENT REPORTING FORM ATTACHED:
YES NO CLIENT SPECIFIC INCIDENT REPORTING FORM ATTACHED:
YES NO ANY NEAR MISSES/OBSERVATIONS ON-SITE TODAY?
YES NO DESCRIPTION:
H&S RECOMMENDATIONS
- 16. REMARKS Building 3H/6H remains in about the same condition as when we were last on-site on March 1, 2016. Debris remains in floor areas to be surveyed during this work evolution which prevents access to 100% of the floors.
- 17. VERIFICATION STATEMENT This report is complete and correct and all materials and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.
NAME/TITLE: Nicholas Berliner, SRSL SIGNATURE:
DATE: 06/14/16
- 18. PROJECT MANAGER REVIEW & ACCEPTANCE REMARKS AND/OR EXCEPTIONS TO REPORT:
ACCEPTANCE NAME/TITLE: Rob Flowers, Project Manager SIGNATURE:
DATE: 06/14/16
OP 555 - Safe.ty Meetings
~
CABRERA SERVICES
- RADIOLOGICAL
- ENGINEERING
- REMEDIATION SAFETY MEETING.FORM SIX QUESTIONS FOR SUCCESS - Take two minutes to think through and answer these questions:
- 1.
What are we about to do?
- 2.
What equipment are we going to use?
- 3.
Have I/we been trained to use this equipment?
- 4.
Have I/we been trained to do this job?
- 5.
How can I/we be hurt?
- 6.
How can I/we prevent this incident?
If you and your team aren't prepared to do the assigned work, STOP WORK, and take time to properly prepare.
Project Information This sign-in log documents the topics of the safety meeting and individual attendance. Personnel who perfonn work operations onsite are required to attend and acknowledge their ability to ask questions and receipt of such briefings daily. Please provide a brief narrative of the selected topics as applicable to the Project in the comment box (ex. Name of AHA reviewed).
PROJECT NAME & LOCATION UNC New Haven CT 10-1007.00 DATE/TIME WEATHER CONDITIONS 6-13 -2016 Sunny 80 Topic Discussion - check one Today's Scope of Work (All tasks)
Dyes D n/a Access I Egress I Slips, Trips, & Falls xD yes D n/a Schedule I New Work I Scope Changes Dyes D n/a Smoking, Eating, & Drinking Dyes D n/a Reviewed Procedures, AHA, etc.
Dyes D n/a Washroom I Facilities Location Dyes D n/a Emergency Action Plan & Procedures Dyes D n/a Heat/Cold Stress Dyes D n/a Communications Protocol Dyes D n/a Exclusion Areas Barricades I Cones Dyes D n/a Required PPE Dyes D n/a Required Permits, Passes, Keys, etc.
Dyes D n/a Required Monitoring / Instruments Dyes D n/a Decon Procedures / IDW Mgmt.
Dyes D n/a Site Control / Work Zones I Security 0 yes 0 n/a Eqpmt. Inspections/Safety Checklists Dyes 0 n/a OTHER/COMMENTS Mobilization Instrument QC Office set up Safety Meeting Attendees Print Name Signature tl ~k1o tr~~r Gw&'r/\\!W"'
~
~
~
I Safety Meeting Leader/ /,
c;;~
Al Craig I SSHO mJi 1,~* J V
I ~ ~