DCL-19-024, And Humboldt Bay Power Plant 2019 Annual Statement of Insurance

From kanterella
(Redirected from ML19087A298)
Jump to navigation Jump to search
And Humboldt Bay Power Plant 2019 Annual Statement of Insurance
ML19087A298
Person / Time
Site: Diablo Canyon, Humboldt Bay
Issue date: 03/28/2019
From: Welsch J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
DCL-19-024, HBL-19-008
Download: ML19087A298 (2)


Text

m Pacific Gas and Electric Company 0

March 28, 2019 PG&E Letter DCL-19-024 PG&E Letter HBL-19-008 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant Units 1 and 2 Docket No. 50-133, OL-DPR-7 Humboldt Bay Power Plant, Unit 3 James M. Welsch Vice President Nuclear Generation and Chief Nuclear Officer Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 805.545.3242 E-Mail: James.Welsch@pge.com 10 CFR 50.54 2019 Annual Statement of Insurance for Pacific Gas and Electric Company's Diablo Canyon Power Plant and Humboldt Bay Power Plant

Dear Commissioners and Staff:

As required by 10 CFR 50.54(w)(3), listed below is the annual reporting of nuclear property insurance coverage with Nuclear Electric Insurance Limited (NEIL) and European Mutual Association for Nuclear Insurance (EMANI) for the Diablo Canyon Power Plant (DCPP) and Humboldt Bay Power Plant (HBPP):

Plant DCPP TOTAL HBPP ln_surer(s)ffype of Covera e NEIL & EMANI /Primary NEIL Blanket Excess NEIL Primary

_Policy Limits

$1,500,000,000

$1,250,000,000

$2,750,000,000 Policy Number P19-027 A14/1006/

2019/1 BX19-007

$ 131,100,000 P19-028 Policy

  • Period 04/01 /19 to 4/01 /20 04/01 / 19 to 4/01 /20 04/01 /19 to 4/01 /20 Pacific Gas and Electric Company (PG&E) procures from EMANI an additional

$200,000,000 of Property Damage coverage in excess of the stated NEIL limits.

The Policy Number is A 14/1006/2019/0 for the Policy Period from April 1, 2019, to April 1, 2020.

A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Document Control Desk March 28, 2019 Page 2 PG&E Letter DCL-19-024 PG&E Letter HBL-19-008 PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have any questions regarding this information, please contact Ms. Janaize Markland at (415) 973-8756.

Sincerely,

&-~

James M. Welsch Vice President, Nuclear Generation and Chief Nuclear Officer cc:

Robert J. Evans, NRC Region IV Inspector John B. Hickman, NRC Reactor Decommissioning Branch Project Manager Janaize Markland, PG&E Director, Enterprise Risk Management Scott A. Morris, NRC Region IV Administrator Christopher W. Newport, NRC Senior Resident Inspector Jennifer K. Post, PG&E Law Balwant K. Singal, NRC Project Manager.

Diablo Distribution Humboldt Distribution A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek