Retrospective Analysis Workshop 6 1
Learning Objectives
- Practice with retrospective analysis of events
- Practice with retrospective analysis of conditions 2
Important:
a)
The workshop problems can be performed as group exercises.
b)
The purpose is to exercise the modeling thought process, not to get the right answer.
Problem #1 A severe overnight storm damages power lines feeding the Fenwick 1 NPP switchyard and causes a loss of offsite power.
Describe how you would determine the CCDP for this event.
3
Problem #2 During a 24-hour endurance test of the Fenwick 1 EDG, the EDG tripped due an overheated bearing. Subsequent investigation revealed this was due to an error during maintenance performed 6 months ago. (The lubricating oil was not refilled to the appropriate level.)
Describe how you would determine the CDP associated with this revealed condition.
4