Category:Letter
MONTHYEARML24032A4762024-02-0101 February 2024 Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23233A0432023-08-18018 August 2023 Enforcement Action EA-22-122 Inspection Readiness Notification ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23228A0202023-08-15015 August 2023 (BFN) Unit 1 - Special Report 259/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23201A2182023-07-20020 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-298 and -299) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 2024-02-01
[Table view] |
Text
DISTRIBUTION AFTER ISSUANCE F OPERATING LICENSE
~ OOCKET NUM U.S NUCI.EAR REGULATORV COMM N R NRC rORM 195 I1-7)I xk94 FILE NUMB NRC DISTRIBUTlON FoR PART 50 DOCKET MATERlAL TO: "ROM:U~S ~ Environ+ Protect+ Agency OATE OF OOCUMENT Atlanta, Georgia 7/15/77 Mr. Herbert Sanger John Ao Little OATS R ECEI V E 0 9/1/77 C3NOTORIZEO PROP INPUT FORM NUMBER OF COPIES RECEIVED BETTE R QORIGINAL QVNCLASSIFIEO gCOPV DESCRIPTION ENCLOSURE Acknowledgement of receipt of Mr. Sanger's Request for Adjudicatory Hearing with respect to the Browns Ferry Nuclear Plant~ ~ +~ ~
PLANT NIXIE: Browns Ferry Units 1-2-3 RJL 9/1/77 SAFETY FOR ACTION/INFORMATION BRANCH CHIEF: 7 INTERNAL 0 IST Rl BUTION C PDR I It: E (2)
OELD HANAUER CHECK STELLO EISENHUT SHAO BUTLER GRIMES J. OLLINS EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR:
TIC gr j~
NSIC 16 CYS ACRS SENT CATE 0 Y
'7P+gop P+
/ ~
1 yf05tqp rp
- ~ni
~c ~nox<
UNITED STATES ENVIRONMENTALPROTECTION AGENCY.
REGiON IV 345 COVRTLAND 5TREET ATLANTA, GEORGlA 30308 3U> ".s-;7-,
" ': -::-..:5'0-4'6 ..
I(, --,*
5a S. Sanger 496 P'I'erbert General Counsel Tennessee Valley Authority 400 Commerce Street Knoxville, Tennessee 37902 .Be Re: Request XZ ~
for Adjudicatory Hearing Browns Ferry Nuclear Plant HPDES Permit No. AL0022080
Dear Hr. Sanger:
This writing will acknowledge receipt of your Request for Adjudi-catory Hearing with respect to the above-referenced facility. Your Request is being considered in accordance with the regulations of. this Agency. \
Prior to a decision by this Agency concerning a grant or denial of your Request for Adjudicatory Hearing, all contested provisions of the NPDES Permit are stayed in accordance with 40 C.F.R. 5125.35 and.
40 C.F.R. 5125. 36.
It is the understanding of this Agency based on your Request and on personal communication with the staff of the Tennessee Yalley Authority at a meeting held in Atlanta earlier this month, that the cooling towers at the Browns Ferry facility are not performing up to design specifications. moreover, your Request indicates that on July 10; 19?7, subsequent to our Atlanta meeting, one of the towers was taken out of service due to a structural failure and that similar failures remain a real possibility for the other'towers at Browns Ferry.
As the contested provisions of your NPDES Permit have been stayed by the submission of your Request, the temperature limitations contained in the Permit are not currently applicable to the Browns Ferry facility.
However, in accordance with the relief sought in your Request, at any time the ambient upstream temperature exceeds SloF. you will be
expected to comply viith the limits of 90oF. maximum temperature and 5oF. maximum temperature rise, both as measured at the dovin-- .
" stream .edge of the assigned mixing zone. "
You.should be prepared
'to discuss and present a strategy for the long-term resolution of
- .. -'.these difficulties by October 31; 1977.. A final decision on 'your Request'for Adjudicatory- Hearing ivill be'ade after these discussions..
Since ly, t
, P<y~fy John Alee Little Acting Regi onal Admi ni strator cc: James llarr Alabama Hater Improvement Comm.