August 28, 2018
SUBJECT:
UPDATED INSPECTION PLAN FOR PALISADES NUCLEAR PLANT (REPORT 05000255/2018005)
Dear Mr. Arnone:
The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for the Palisades Nuclear Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Please contact me at 630-829-9620 with any questions you have regarding this letter.
Sincerely,
/RA/
Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket No. 50-255 License No. DPR-20 Enclosure:
Inspection Plan cc: Distribution via LISTSERV
Letter to Charles Arnone from Eric Duncan dated August 28, 2018
SUBJECT: UPDATED INSPECTION PLAN FOR PALISADES NUCLEAR PLANT (REPORT 05000255/2018005)
DISTRIBUTION:
Christopher Cook RidsNrrPMPalisades Resource RidsNrrDorlLpl3 RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII ROPassessment.Resource@nrc.gov
ADAMS Accession Number: ML18240A407 OFFICE RIII
NAME EDuncan:lg
DATE 8/28/2018
OFFICIAL RECORD COPY
Palisades 09/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count SECURITY BASELINE INSPECTION
1 10/08/2018 10/12/2018 IP 71130.02 000734 Access Control
10/08/2018 10/12/2018 IP 71151 001338 Performance Indicator Verification
10/22/2018 10/26/2018 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance ISI INSPECTION
1 10/28/2018 12/07/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR Radiation Protection Baseline Inspection
1 10/29/2018 11/02/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
10/29/2018 11/02/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls
10/29/2018 11/02/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
10/29/2018 11/02/2018 IP 71124.04 000728 Occupational Dose Assessment
11/13/2018 11/16/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
11/13/2018 11/16/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls
11/13/2018 11/16/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
11/13/2018 11/16/2018 IP 71124.04 000728 Occupational Dose Assessment RP 71124.08
1 03/04/2019 03/08/2019 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation TRIENNIAL HEAT SINK INSPECTION
1 04/08/2019 04/12/2019 IP 71111.07T 000700 Heat Sink Performance -Triennial SECURITY BASELINE INSPECTION
1 04/15/2019 04/19/2019 IP 71130.02 000734 Access Control RP Baseline 71124.05
1 06/03/2019 06/07/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation EP BASELINE INSPECTION /PI VERIFICATION
1 07/08/2019 07/12/2019 IP 71114.02 000717 Alert and Notification System Testing
07/08/2019 07/12/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
07/08/2019 07/12/2019 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies
07/08/2019 07/12/2019 IP 71151 001397 Performance Indicator Verification 8/21/2018 8:59:54 AM Page 1 of 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Palisades 09/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count DBA Program (EQ)
1 07/15/2019 08/02/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)
SECURITY BASELINE INSPECTION
1 08/05/2019 08/09/2019 IP 71130.14 000743 Review of Power Reactor Target Sets
08/05/2019 08/09/2019 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations RP Baseline 71124.02
1 09/09/2019 09/13/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls ISFSI Cask Loading Inspection 3Q2019
1 09/16/2019 09/20/2019 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants SECURITY BASELINE INSPECTION
1 10/07/2019 10/11/2019 IP 71130.07 000739 Security Training
10/07/2019 10/11/2019 IP 71151 001338 Performance Indicator Verification TRIENNIAL 50.59 INSPECTION
1 10/28/2019 11/01/2019 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments RP Baseline 71124.01
1 11/18/2019 11/22/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls DESIGN BASES ASSURANCE INSPECTION (TEAM)
1 03/02/2020 03/06/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
03/16/2020 03/20/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
RP Baseline Inspection
1 04/20/2020 04/24/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
04/20/2020 04/24/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
04/20/2020 04/24/2020 IP 71124.04 000729 Occupational Dose Assessment SECURITY BASELINE INSPECTION
1 04/20/2020 04/24/2020 IP 71130.08 000740 Fitness For Duty Program
04/20/2020 04/24/2020 IP 71151 001338 Performance Indicator Verification 8/21/2018 8:59:54 AM Page 2 of 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Palisades 09/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count SECURITY BASELINE INSPECTION
1 06/22/2020 06/26/2020 IP 71130.02 000734 Access Control BIENNIAL PI&R TEAM INSPECTION
1 06/22/2020 07/10/2020 IP 71152B 000747 Problem Identification and Resolution 8/21/2018 8:59:54 AM Page 3 of 3 This report does not include INPO and OUTAGE activities.