RAIO-0818-61562 August 24, 2018 Docket No.52-048 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738

SUBJECT:

NuScale Power, LLC Response to NRC Request for Additional Information No.

319 (eRAI No. 9331) on the NuScale Design Certification Application

REFERENCE:

U.S. Nuclear Regulatory Commission, "Request for Additional Information No.

319 (eRAI No. 9331)," dated January 03, 2018 The purpose of this letter is to provide the NuScale Power, LLC (NuScale) response to the referenced NRC Request for Additional Information (RAI).

The Enclosure to this letter contains NuScale's response to the following RAI Question from NRC eRAI No. 9331:

03.04.01-4 This letter and the enclosed response make no new regulatory commitments and no revisions to any existing regulatory commitments.

If you have any questions on this response, please contact Marty Bryan at 541-452-7172 or at mbryan@nuscalepower.com.

Sincerely, Zackary W. Rad Director, Regulatory Affairs NuScale Power, LLC Distribution: Gregory Cranston, NRC, OWFN-8G9A Samuel Lee, NRC, OWFN-8G9A Marieliz Vera, NRC, OWFN-8G9A : NuScale Response to NRC Request for Additional Information eRAI No. 9331 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com

RAIO-0818-61562 :

NuScale Response to NRC Request for Additional Information eRAI No. 9331 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com

Response to Request for Additional Information Docket No.52-048 eRAI No.: 9331 Date of RAI Issue: 01/03/2018 NRC Question No.: 03.04.01-4 10 CFR 52.47(a)(2) requires that a standard design certification applicant provide a description and analysis of the structures, systems, and components (SSCs) of the facility, with emphasis upon performance requirements, the bases, with technical justification therefor, upon which these requirements have been established, and the evaluations required to show that safety functions will be accomplished.

In RAI No. 9053, issued on August 12, 2017 (ML17224A024), the staff requested the applicant to justify the assumptions in the internal flooding analysis, which indicates water flow through pipe ruptures are limited to 40 and 30 minutes in the Reactor Building (RXB) and Control Room Building (CRB), respectively. In the response dated October 11, 2017 (ML17284A914), the applicant stated that These assumptions are based on plant personnel operative walk-downs, the use of plant monitoring equipment, and the use of closed circuit video monitoring systems.

The use of the Remote Camera system, Plant-wide Video Monitoring system, and Plant Security system will aid in keeping visuals on many sections of the plant, including high radiation areas. Additionally, the Control Building was assumed to have a shorter leak time because it is a normally occupied structure.

Since timely isolation of ruptured piping depends on more than just prompt detection of leakages, the NRC staff request the applicant to describe any other design features such as the availability and accessibility of isolation valves, limited water volumes, and/or credited actions to isolate ruptured piping. If specific mitigation strategies are to be developed by the COL applicant, provide a COL item as appropriate.

NuScale Response:

As discussed, in an NRC meeting on July 11, 2018, COL Item 3.4-2 has been revised to address flood mitigation strategies:

NuScale Nonproprietary

A COL applicant that references the NuScale Power plant design certification will develop the on-site program addressing the key points of flood mitigation. The key points to this program include the procedures for mitigating internal flooding events; the equipment list of structures, systems, and components subject to flood protection in each plant area; and providing assurance that the program reliably mitigates flooding to the identified structures, systems, and components.

Impact on DCA:

FSAR Tier 2, Section 3.4.1.5 and FSAR Tier 2, Table 1.8-2 have been revised as described in the response above and as shown in the markup provided in this response.

NuScale Nonproprietary

NuScale Final Safety Analysis Report Interfaces with Certified Design RAI 01-61, RAI 02.04.13-1, RAI 03.04.01-4, RAI 03.04.02-1, RAI 03.04.02-2, RAI 03.04.02-3, RAI 03.05.01.04-1, RAI 03.05.02-2, RAI 03.06.02-15, RAI 03.06.03-11, RAI 03.07.01-2, RAI 03.07.01-3, RAI 03.07.02-8, RAI 03.07.02-12, RAI 03.08.04-23S1, RAI 03.08.04-23S2, RAI 03.08.05-14S1, RAI 03.09.02-15, RAI 03.09.02-48, RAI 03.09.02-67, RAI 03.09.02-69, RAI 03.09.03-12, RAI 03.09.06-5, RAI 03.09.06-6, RAI 03.09.06-16, RAI 03.09.06-16S1, RAI 03.09.06-27, RAI 03.11-8, RAI 03.11-14, RAI 03.11-14S1, RAI 03.11-18, RAI 03.13-3, RAI 04.02-1S2, RAI 05.02.03-19, RAI 05.02.05-8, RAI 05.04.02.01-13, RAI 05.04.02.01-14, RAI 06.02.06-22, RAI 06.02.06-23, RAI 06.04-1, RAI 09.01.02-4, RAI 09.01.05-3, RAI 09.01.05-6, RAI 09.03.02-3, RAI 09.03.02-4, RAI 09.03.02-5, RAI 09.03.02-6, RAI 09.03.02-8, RAI 10.02-1, RAI 10.02-2, RAI 10.02-3, RAI 10.02.03-1, RAI 10.02.03-2, RAI 10.03.06-1, RAI 10.03.06-5, RAI 10.04.06-1, RAI 10.04.06-2, RAI 10.04.06-3, RAI 10.04.10-2, RAI 11.01-2, RAI 13.01.01-1, RAI 13.01.01-1S1, RAI 13.02.02-1, RAI 13.03-4, RAI 13.05.02.01-2, RAI 13.05.02.01-2S1, RAI 13.05.02.01-3, RAI 13.05.02.01-3S1, RAI 13.05.02.01-4, RAI 13.05.02.01-4S1, RAI 14.02-7, RAI 19-31, RAI 19-31S1, RAI 19-38, RAI 20.01-13 Table 1.8-2: Combined License Information Items Item No. Description of COL Information Item Section COL Item 1.1-1: A COL applicant that references the NuScale Power Plant design certification will identify the 1.1 site-specific plant location.

COL Item 1.1-2: A COL applicant that references the NuScale Power Plant design certification will provide the 1.1 schedules for completion of construction and commercial operation of each power module.

COL Item 1.4-1: A COL applicant that references the NuScale Power Plant design certification will identify the 1.4 prime agents or contractors for the construction and operation of the nuclear power plant.

COL Item 1.7-1: A COL applicant that references the NuScale Power Plant design certification will provide site- 1.7 specific diagrams and legends, as applicable.

COL Item 1.7-2: A COL applicant that references the NuScale Power Plant design certification will list additional 1.7 site-specific piping and instrumentation diagrams and legends as applicable.

COL Item 1.8-1: A COL applicant that references the NuScale Power Plant design certification will provide a list of 1.8 departures from the certified design.

COL Item 1.9-1: A COL applicant that references the NuScale Power Plant design certification will review and 1.9 address the conformance with regulatory criteria in effect six months before the docket date of the COL application for the site-specific portions and operational aspects of the facility design.

COL Item 1.10-1: A COL applicant that references the NuScale Power Plant design certification will evaluate the 1.10 potential hazards resulting from construction activities of the new NuScale facility to the safety-related and risk significant structures, systems, and components of existing operating unit(s) and newly constructed operating unit(s) at the co-located site per 10 CFR 52.79(a)(31). The evaluation will include identification of management and administrative controls necessary to eliminate or mitigate the consequences of potential hazards and demonstration that the limiting conditions for operation of an operating unit would not be exceeded. This COL item is not applicable for construction activities (build-out of the facility) at an individual NuScale Power Plant with operating NuScale Power Modules.

COL Item 2.0-1: A COL applicant that references the NuScale Power Plant design certification will demonstrate 2.0 that site-specific characteristics are bounded by the design parameters specified in Table 2.0-1.

If site-specific values are not bounded by the values in Table 2.0-1, the COL applicant will demonstrate the acceptability of the site-specific values in the appropriate sections of its combined license application.

COL Item 2.1-1: A COL applicant that references the NuScale Power Plant design certification will describe the 2.1 site geographic and demographic characteristics.

COL Item 2.2-1: A COL applicant that references the NuScale Power Plant design certification will describe 2.2 nearby industrial, transportation, and military facilities. The COL applicant will demonstrate that the design is acceptable for each potential accident, or provide site-specific design alternatives.

COL Item 2.3-1: A COL applicant that references the NuScale Power Plant design certification will describe the 2.3 site-specific meteorological characteristics for Section 2.3.1 through Section 2.3.5, as applicable.

COL Item 2.4-1: A COL applicant that references the NuScale Power Plant design certification will investigate 2.4 and describe the site-specific hydrologic characteristics for Section 2.4.1 through Section 2.4.14, as applicableexcept Section 2.4.8 and Section 2.4.10.

COL Item 2.5-1: A COL applicant that references the NuScale Power Plant design certification will describe the 2.5 site-specific geology, seismology, and geotechnical characteristics for Section 2.5.1 through Section 2.5.5, below.

Tier 2 1.8-3 Draft Revision 2

NuScale Final Safety Analysis Report Interfaces with Certified Design Table 1.8-2: Combined License Information Items (Continued)

Item No. Description of COL Information Item Section COL Item 3.2-1: A COL applicant that references the NuScale Power Plant design certification will update Table 3.2 3.2-1 to identify the classification of site-specific structures, systems, and components.

COL Item 3.3-1: A COL applicant that references the NuScale Power Plant design will confirm that nearby 3.3 structures exposed to severe and extreme (tornado and hurricane) wind loads will not collapse and adversely affect the Reactor Building or Seismic Category I portion of the Control Building.

COL Item 3.4-1: A COL applicant that references the NuScale Power plant design certification will confirm the 3.4 final location of structures, systems, and components subject to flood protection and final routing of piping.

COL Item 3.4-2: A COL applicant that references the NuScale Power plant design certification will develop the 3.4 on-site program addressing the key points of flood mitigation. The key points to this program include the procedures for mitigating internal flooding events; the equipment list of structures, systems, and components subject to flood protection in each plant area; and providing assurance that the program reliably mitigates flooding to the identified structures, systems, and components.identify the selected mitigation strategy for each room containing structures, systems, and components subject to flood protection.

COL Item 3.4-3: A COL applicant that references the NuScale Power plant design certification will develop an 3.4 inspection and maintenance program to ensure that each water-tight door, penetration seal, or other degradable measure remains capable of performing its intended function.

COL Item 3.4-4: A COL applicant that references the NuScale Power plant design certification will confirm that 3.4 site-specific tanks or water sources are placed in locations where they cannot cause flooding in the Reactor Building or Control Building.

COL Item 3.4-5: A COL applicant that references the NuScale Power Plant design certification will determine the 3.4 extent of waterproofing and dampproofing needed for the underground portion of the Reactor Building and Control Building based on site-specific conditions. Additionally, a COL applicant will provide the specified design life for waterstops, waterproofing, damp proofing, and watertight seals. If the design life is less than the operating life of the plant, the COL applicant will describe how continued protection will be ensured.

COL Item 3.4-6: A COL applicant that references the NuScale Power Plant design certification will confirm that 3.4 nearby structures exposed to external flooding will not collapse and adversely affect the Reactor Building or Seismic Category I portion of the Control Building.

COL Item 3.4-7: A COL applicant that references the NuScale Power Plant design certification will determine the 3.4 extent of waterproofing and damp proofing needed to prevent groundwater and foreign material intrusion into the expansion gap between the end of the tunnel between the Reactor Building and the Control Building, and the corresponding Reactor Building connecting walls.

COL Item 3.5-1: A COL applicant that references the NuScale Power Plant certified design will provide a missile 3.5 analysis for the turbine generator which demonstrates that protection from turbine missiles is accomplished by using barriers.the probability of a turbine generator producing a low trajectory turbine missile is less than 10-5.

COL Item 3.5-2: A COL applicant that references the NuScale Power Plant certified design will address the effect 3.5 of turbine missiles from nearby or co-located facilities.Not Used.

COL Item 3.5-3: A COL applicant that references the NuScale Power Plant certified design will confirm that 3.5 automobile missiles cannot be generated within a 0.5-mile radius of safety-related structures, systems, and components and risk-significant structures, systems, and components requiring missile protection that would lead to impact higher than 30 feet above plant grade.

Additionally, if automobile missiles impact at higher than 30 feet above plant grade, the COL applicant will evaluate and show that the missiles will not compromise safety-related and risk-significant structures, systems, and components.

COL Item 3.5-4: A COL applicant that references the NuScale Power Plant design certification will evaluate site- 3.5 specific hazards for external events that may produce more energetic missiles than the design basis missiles defined in FSAR Tier 2, Section 3.5.1.4.

COL Item 3.6-1: A COL applicant that references the NuScale Power Plant design certification will complete the 3.6 routing of piping systems outside of the reactor pool bay, identify the location of high- and moderate-energy lines, and update Table 3.6-1 as necessary.

Tier 2 1.8-4 Draft Revision 2

NuScale Final Safety Analysis Report Water Level (Flood) Design 3.4.1.3.4 Flooding at Elevation 63'-3" Elevation 63'-3 contains electrical equipment and utility rooms. There are no SSC subject to flood protection located at this elevation.

3.4.1.3.5 Flooding at Elevation 50'-0" Elevation 50'-0" contains electrical equipment, air bottles, and utility rooms. There are no SSC that are subject to flood protection at this elevation.

3.4.1.4 Flooding Outside the Reactor and Control Buildings RAI 14.03.02-2 Flooding of the RXB or CRB caused by external sources does not occur. The design external flood level is established as less than 99' elevation (one foot below the baseline plant elevation (top of concrete) at 100'-0"). The finished grade at the building perimeter of the RXB and CRB is approximately 6 inches below the top of concrete elevation, except at a truck ramp on the south side of the Radwaste Building and the CRB tunnel.

Water from tanks and piping that are non-seismic and non-tornado/hurricane protected is a potential flooding source outside the buildings. ((However, there are no large tanks or water sources near the entrances to the CRB and RXB.)) The site is graded to transport water away from these buildings. Therefore, failure of equipment outside the CRB and RXB cannot cause internal flooding.

3.4.1.5 Site Specific Analysis COL Item 3.4-1: A COL applicant that references the NuScale Power plant design certification will confirm the final location of structures, systems, and components subject to flood protection and final routing of piping.

RAI 03.04.01-4 COL Item 3.4-2: A COL applicant that references the NuScale Power plant design certification will develop the on-site program addressing the key points of flood mitigation. The key points to this program include the procedures for mitigating internal flooding events; the equipment list of structures, systems, and components subject to flood protection in each plant area; and providing assurance that the program reliably mitigates flooding to the identified structures, systems, and components.identify the selected mitigation strategy for each room containing structures, systems, and components subject to flood protection.

COL Item 3.4-3: A COL applicant that references the NuScale Power plant design certification will develop an inspection and maintenance program to ensure that each water-tight door, penetration seal, or other degradable measure remains capable of performing its intended function.

Tier 2 3.4-6 Draft Revision 2