Text
DI~BUTXON:
DocMt--Fi3.e- (Environ.)
~
Local PDR DRL Rea MAY 1 1972 RIIR-g I Re N. Brown J. Cutchin
'g+ON Docket Nos. 50-400 50%02 D. Vassallo 50&01 50&03 H. Denton REP Files Team Leader, Laboratory REP Project Leader Carolina Power 6 Light "Company JFelton ATTN: Nr. J. A. Jones, Senior Vice Compliance (2)
President - Engineering 6 F. Logan Operating Croup'36 V. Benaroya Fayetteville Street Raleigh, North Carolina 27602 Gentlemen:
In connection with the preparation of our Envixonmental Statement fox the Shearon Harxis Nuclear Power Plant, Units 1, 2, 3, and 4, we have established a program to determine the type and quantities of nuclides to be released annually from this facility Personnel from the Oak Ridge National Laboratory are assisting us in this part: of the environmental review. For this program we need basic, data for a source term calculation for a gaseous and liquid effluent analysis that specifically relate to-Sheaxon Harris Nuch of this information may already be in your applica-tion or Environmental Report, but to expedite the xevLew we require a tabulation of this information as indicated in the enclosed list. Any data that are inconsistent with information in your SAR or Environmental Report should ba identified. Forty-five. copies of separate answers should be submitted fox (1) the facility as presently designed and (2) any pro)ected design changes.
This information should be provided by June 7, 1972, If it Xs impossible to meet this schedule, p1ease let us knoFr. He would like to,meet with you and representatives of other utilities at Oak Ridge on June 15, 1972, to discuss the use of this information in our'nvironmental analysis. The meeting may extend into the next day. Contact'Ifr T. Row of ORNL (615-483-8611, Ext. 31423) for meeting arrangements.
Sincerely,
,c.
R. C. DeYoung, 8 sistan Director fox Pressurized Hater Reactors Directorate of Licensing
Enclosure:
CRESS AD/S &RS /DRL PHR-~eDRL AD/PHR: DRL T2025, RS JCtQchin assallo 4/26/72 su5iSK g DAIKW Bknaroya: dy 4/ /72 HDen
/72 n
lA,'. 9 eee 4/~72 COVRRNMRNr PAINTING OFFICE D
r97 I 4/ZP/72 449 S4
~ J/72 Porn AKC 318 (Rr,v,9-53) AKChf 0240 1
4
.r 4 l
4 4
~ D 4'1 I
k
'I 4 4 I 4 4 4
4 F '.. ~
~
4 ~
~
IE 4
~ ."
4 VI 4
I I
4 'PX,, ~ 4
PRESSURIZED WATER REACTORS Basic Date for Source Term Calculation
- l. Operating power (MWt) at which impact is to be analyzed.
2.. Weight of U loaded (first loading and. equilibrium cycle).
- 3. Isotopic ratio in fresh fuel (first loading and equilibrium cycle).
- 4. Expected percentage of leaking fuel.
- 5. Escape rate coefficients used (or reference).
- 6. Plant factor.
- 7. Number of steam generators.
- 8. Type of steam generators (recirculating, straight through).
- 9. Mass of primary coolant in system total (lb) and mass of primary coolant in reactor (lb)..
- 10. Primary coolant flow rate (lb/hr).
ll. Mass of steam and. mass of liquid in each generator (lb).
- 12. Total mass of secondary coolant (lb).
- 13. Turbine operating conditions (temperature F, pressure psi, flow rate, (lb/hr) .
- 14. Total flow rate in the condensate demineralizer (lb/hr) .
- 15. What is the containment volume (ft3)?
- 16. What is the expected leak rate of primary coolant to,the containment (lb/hr)?
- 17. How often is the containment purged? Is it filtered prior to release?
Are iodine absorbers provided? What decontaimination factor is expected?
- 18. Is there a continuous air cleanup for iodine in the containment? If so, what volume per unit time is circulated through it? What decontamination factor is expected? At what concentration will purging be initiated?
- 19. Give the total expected continuous letdown rate (lb/hr).
- a. What fraction is returned through the demineralizer to the primary system'? What is the expected. demineralizer efficiency for removal of principal isotopes?
o~e 2
- b. What fraction of this goes to boron control system? How is this treated, demineralization, evaporation, filtration?
- c. Is there a separate cation demineralizer to control Li and Cs?
- 20. What fraction of the noble gases and. iodines are stripped. from that portion of the letdown stream which is demineralized to the primary return system? How are these gases collected? What decay do they receive prior to release?
- 21. What fraction of the noble gases and iodines are stripped from that portion of the letdown stream which is sent to the boron control system?
How are these gases collected? What decay do they receive prior to release?
- 22. Are releases from the decay tanks passed through a charcoal absorber?
What decontamination factor is expected?
23 ~ How frequently is the system shut down and degassed? How many volumes of the primary coolant system are degassed. in this way each year? What fraction of the gases present are removed? What fraction of other principal nuclides are removed, and by what means? What decay time is provided?
- 24. Are there any other methods of degassing (i.e., through pressurizer, etc.)2 If so describe.
2$ ~ If gas is removed through the pressurizer or by other means, how is it treated2
- 26. What is the expected leak rate of primary coolant to the secondary system (lb/hr)?
27 0 What is the normal rate of steam genezator blowdown? Where are the gases from the blowdown vent discharged? Are there charcoal absorbers on the blowdown tank vent? If so, what decontamination facior is expected?
4
- 28. What is the expected leak rate of steam to the turbine building? What is the ventilation air flow through the turbine building (CFM)? Where is it discharged? Is the air filtered or treated before discharge? If so, provide expected performance.
What is the flow rate of gaseous effluent from the main condenser effector?
What treatment is provided2 Where is it released?
- 30. What is the origin of the steam used in the gland seals (i.e., is it primary steam, condensate, or demineralized. water from a separate source, etc.)2 How is the effluent steam from the gland seals treated and disposed of2
- 31. What is the expected leak rate of primary coolant to the auxiliary build.-
ing? What is the ventilation air flow through the auxiliary building (CPM)? Where is it discharged'? Is the air filtered or otherwise treated before discharged? If so, provide expected performance.
- 32. Provide average gallons/day and pCi%c for following categories of liquid effluents. Use currently observed data in the industry where different from the SAR or Environmental Report (indicate which is used).
- a. High-level wastes (for example, primary coolant letdown, "clean" or low conductivity waste, equipment drains and deaerated wastes);
- b. "Dirty" wastes (for example, floor drain wastes, high-conductivity wastes, aerated. wastes, and. laboratory wastes);
- c. Laundry, decontamination, and wash-down wastes;
- d. Steam generator blowdown - give average flow rate and maximum short-term flows and their duration;
- e. Drains from turbine building.
For these wastes (a-e) provide:
- 1. Number of capacity of collector tanks.
- 2. Fraction of water to be recycled or factors controlling decision.
- 3. Treatment steps - include number, capacity, and process D.F. for each principal nuclide for each step. If step is optional, state factors controlling decision.
Cooling time from primary loop to discharge.
- 5. How is waste concentrate (filter cake, demineralizer resin, evaporator
'bottoms) handled? Give total volume or weight and curies per day or year.
- 33. Dilution flow rate for liquid effluents, normal gpm and total gallons per year.